
ASSEMBLY OF OPEN Q-LINE INDUSTRIAL SHELVING
The reference numbers used throughout this sheet refer to the illustration on the back cover.
This is to help you to identify the various parts as they are mentioned.
1.
Q-Line uprights come in three different styles, as shown
below.
2. Create the right side of the shelving units by laying two
uprights side by side on a at surface. Be sure that the
short side of the OAP upright(s) (Ref. No. 1a) is facing up,
as shown below.
3. Attach the two side sway braces (Ref. Nos. 2a or 2b),
beginning in the 20th hole from the top of each upright
(approximately 20” from the top), using two 1/4”-20
x
5/8” bolts and nuts (Ref. No. 6). The side sway braces
attach to the longer side of the uprights (the side with
two sets of holes). Bolt the braces into the small holes
near the edge of the uprights as shown in circles below.
Note the hole pattern of two round holes and then one
square hole, repeating every 3”, which should help
facilitate proper placement of the bolts. Finger tighten only
at this point.
Two people are recommended for assembly. Approximate assembly time: 20-30 minutes.
Tools required: 7/16” or nut driver or socket and a athead screwdriver.
Standard
Beaded Post
(BTP)
Offset
Angle Post
(OAP)
Heavy
Beaded Post
(HBP)
These three upright styles may be used in several different
combinations. In order to better understand these
instructions, please examine the following congurations
to determine which type of installation you will be assembling:
Single unit with four
Offset Angle Posts
Two or more units with four offset
angle posts per section
Single unit with two offset
angle posts in rear and two
standard or heavy beaded
posts in front.
Two or more units using standard or heavy beaded
posts in front and offset angle posts in rear
NOTE: One side of the upright is longer than the
other, and contains two sets of holes. When laying
the uprights side by side, this long side should be
on the floor, and the short side should be pointing
into the air.
If your unit will use BTP or HBP uprights in the front (Ref.
Nos. 1b or 1c), be sure to select the proper upright and
that the open edge is facing the OAP upright, as shown
below in the below gure.