G9000 MMS KIT Installation Manual 1000-2000kVA –200150-001 iii
Table of Contents
Table of Contents................................................................................................................................................................iii
List of Tables.......................................................................................................................................................................iii
List of Figures......................................................................................................................................................................iii
1How to use this Manual...............................................................................................................................................1
1.1 Notice Icons.........................................................................................................................................................1
1.2 Qualified Personnel.............................................................................................................................................2
2OVERVIEW.................................................................................................................................................................3
3MMS KIT Parts List .....................................................................................................................................................4
4Installation Procedures................................................................................................................................................6
5Parallel Operation System Connection.....................................................................................................................12
List of Tables
Table 2-1: Parts List of MMS KIT......................................................................................................................................4
Table 3-1: Dip Switch Setting on Parallel Interface Board (IFAU-16*)...........................................................................10
Table 3-2: Status of Jumpers on Parallel Interface Board(IFAU-16*) ............................................................................11
List of Figures
Figure 1-1: Parallel-Connection between UPSs...............................................................................................................3
Figure 2-1: MMS KIT Parts Identification..........................................................................................................................5
Figure 3-1: Location of IFAU-16* MMS PCB Installation (1000kVA)................................................................................6
Figure 3-2: Location of IFAU-16* MMS PCB Installation (1330-2000kVA) ......................................................................7
Figure 3-3: Cable Connections Between IFAU-16* and Others.......................................................................................8
Figure 3-4: Example of the Inside of Bypass Cabinet after Installation (1000kVA)..........................................................9
Figure 3-5: Dip Switch Location on Parallel Interface Board (IFAU-16*)........................................................................10
Figure 3-6: Example of Dip Switch Setting.....................................................................................................................10
Figure 3-7: Location of Jumpers on Parallel Interface Board(IFAU-16*)........................................................................11
Figure 4-1: Diagram of Power Wire Connections (Parallel Operation System)..............................................................12
Figure 4-2: Diagram of Power Wire and Control Wire Connection (Parallel Operation System)...................................13
Figure 4-3: UPS Module Parallel Interface Board (IFAU-16*) Interconnections.............................................................14