
Contents
2 - EN TTH300 CI/TTH300-EN
1Safety....................................................................................................................................................................3
1.1 General Safety Information ............................................................................................................................3
1.2 Intended use...................................................................................................................................................3
1.3 Technical limits...............................................................................................................................................3
1.4 Personnel qualification ...................................................................................................................................4
1.5 Electrical installation safety information .........................................................................................................4
1.6 Operating safety information ..........................................................................................................................4
1.7 Returning devices...........................................................................................................................................4
1.8 Disposal..........................................................................................................................................................4
1.8.1 Information on WEEE directive 2002/96/EC (Waste Electrical and Electronic Equipment) ...................5
2Use in areas requiring ignition protection ........................................................................................................6
2.1 Approvals .......................................................................................................................................................6
2.2 Level of protection ..........................................................................................................................................6
2.3 Electrostatic charging .....................................................................................................................................6
2.4 Ground............................................................................................................................................................6
2.5 Interconnection...............................................................................................................................................6
2.6 Configuration ..................................................................................................................................................6
2.7 Explosion-protection relevant information ......................................................................................................6
3Installation............................................................................................................................................................7
3.1 Installation options..........................................................................................................................................7
3.1.1 Installation in the cover of the connection head......................................................................................7
3.1.2 Installation on a top-hat rail .....................................................................................................................7
3.1.3 Installation on the measuring inset .........................................................................................................8
3.2 Installing the optional LCD display with control buttons.................................................................................9
4Electrical connection ........................................................................................................................................10
4.1 Conducting material .....................................................................................................................................10
4.2 Pin configuration...........................................................................................................................................11
4.2.1 Sensor connection ................................................................................................................................11
4.3 Signal/supply connection..............................................................................................................................14
4.3.1 Standard application .............................................................................................................................14
4.3.2 Installation in ignition protection areas..................................................................................................17
4.3.3 Zone 1 (0)..............................................................................................................................................18
4.3.4 Zone 1 (20)............................................................................................................................................19
4.3.5 Zone 2 ...................................................................................................................................................20
5Startup Operation ..............................................................................................................................................21
6Appendix ............................................................................................................................................................21
6.1 Additional documents ...................................................................................................................................21