AMGO 409-HP Manual

Original
Four Post Parking Lift
Model: 409-HP

CONTENTS
Product Features and Specifications ..................................................... 1
Installation Requirement .................................................................... 2
Steps of Installation ........................................................................... 4
Exploded View .................................................................................. 22
Test Run ...........................................................................................28
Operation Instruction .........................................................................29
Maintenance .....................................................................................30
Trouble Shooting ................................................................................31
Lift Disposal........................................................................................31

1
I. PRODUCT FEATURES AND SPECIFICATIONS
4-POST MODEL 409-HP FEATURES
· Single point manual safety release, more convenient and more reliable for decent
operation.
· Four mechanical locking devices, each equipped with both primary
and secondly safety locks.
· Power-side column can be installed at both side, front or rear.
· Non-skid diamond platforms and adjustable safety lock ladders.
· Optional kits:Rolling jack, caster kits.
MODEL 409-HP SPECIFICATIONS
Model
Lifting
Capacity
Lifting
Height
Lifting
Time
Overall
Length
(Inc. Ramps)
Overall
Width
Width Between
Columns
Motor
409-HP
9,000 lbs
87 1/2”
2222mm
54S
234 7/8”
5965mm
122 1/4”
3106mm
112 5/8”
2860mm
1.5HP
Fig. 1

2
II. INSTALLATION REQUIREMENT
A. TOOLS REQUIRED
Tape Measure (7.5m)
Hammer
Level Bar
English Spanner (12")
Wrench set
Carpenter’s Chalk
Screw Sets
Pliers
Lock Wrench
Socket Head Wrench
(12#, 13#, 14#, 15#, 17#, 19#, 24#, 30#)(3#, 5#, 6#, 8#)
Fig. 2

3
≥100mm
B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal temperature,
ventilated and dry place.
C. The equipment should be unload and transfer by forklift.
D. SPECIFICATIONS OF CONCRETE (See Fig. 4)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 100mm minimum and without reinforcing steel bars, and
must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi (210kg/cm²)
minimum.
3. Floors must be level and no cracks.
E. POWER SUPPLY
The electrical source must be 2.0HP minimum. The source cable size must be 2.5mm² and
in good condition of contacting with floor.
Fig. 4
Fig.3
Concrete intensity must be
3000psi minimum

4
III. STEPS OF INSTALLATION
A. Check the parts before assembly
1. Packaged lift and Hydraulic Power Unit (See Fig. 5).
2. Open the outer packing carefully, check the parts according to the shipment list. (See Fig.
6).
3. Take off the drive-in ramps and columns (See Fig.7 ).
4. Loose the screws of the upper package stand, take off the offside platform, take out the
parts inside the power-side platform, then remove the package stand.
Fig. 5
Fig. 7
Power-side
Platform
Drive-in
Ramp
Offside
Platform
Cross
Beam
Column
Fig. 6
Parts box
Shipment
Parts List

5
5. Move aside the parts and check the parts according to the shipment parts list
(See Fig. 8).
6. Open the carton of parts and check the parts according to the parts box list(See Fig. 9).
Fig. 9
Fig.8
61
Optional kit

6
7. Check the parts of the parts bag according to the parts bag list (See Fig. 10).
B. Use a carpenter’s chalk line to establish installation layout as per Table 1
Make sure the size is right and base is flat (see Fig. 11).
Note: Reserve space front and behind the installation site.
MODEL
A
B
C
409-HP
201 3/8”
5115mm
122 1/4”
3106mm
235 5/8”
5984mm
Fig. 10
B
A
C
Use a carpenter’s chalk line to establish
installation layout
Fig.11
1
2

7
C. Install cross beams (See Fig.12, Fig.13).
Hole towards inside
Fig.12
Fig.13
3
6
The power-side column need to be
installed according to the installed
position of the safety lock release
handle.

8
D. Install the Safety Ladders.
1. Take off the pulley safety cover and unscrew a nut of the safety ladders, and then adjust the
four lower nuts to be at the same position. Then install the safety ladder (See Fig. 14).
Safety
Ladder
Limited Pin
Limited Pin
Fig.14
Safety Ladder is inserted between Limited
Pins of the cross-beam
Insert the safety
ladder from up to the
bottom between the
Limited Pins
Take off the cross beam safety cover
Safety cover
Unscrew a nut of the safety
ladders

9
2. Install Safety Ladders (See Fig. 15).
E. Put the cross beams at the same height and lock on the safety ladder
(See Fig. 16).
This height for four
threaded rod of safety
ladders should be the
same.
Safety ladder pass through the hole of
the top plate, then tighten the two nuts
Fig. 15
Fig. 16
18
17
The lifting cross beam height
should be fitted for installing the
platform and its parts . 1m height
is recommended.
The safety device on the
cross beam should lock
into the safety ladders at
the same level
Lifting both cross beams to the
same height.

10
F. Install power side platform.
1. Install the power side platform on the cross beams by a fork lift or manual, offset the cross
beams to the outside till the pulleys of both platforms can rest into the cross beams’ slots
(See Fig.17), Install the power side platform and screw up the bolts.
Fig. 17
Offset the cross beam lean
outward when putting the
power-side platform on the
cross beams
Offset the cross beam lean
outward when putting the
power-side platform on the cross
beams
Illustration for front pulley in
power-side platform
Illustration for Rear pulley
in power-side platform

11
2. Install tire stop plate with bolts and washer on the platform: Tighten the platform
on cross beam Bwith bolts, tighten the tire stop plate on cross beam Awith bolts
Note: The bolts for the side with tire stop plate is longer, pay attention when choosing the
bolts (See Fig.18)
Fig. 18
Car in direction
5
Cross beam B
26
25
24
27
28
Tighten the hex bolts
M16*35 with lock
washer and flat
washer
Fixed the platform with
hex bolts M16*30, lock
washer and flat washer
Cross beam A

12
G. Install offside platform and limit slider, then install the bolts for the
platform strengthen plate, check the plumbness of columns with level and
adjusting with the shims (See Fig. 19).
Fig. 19
Level bar
Install the bolts for the
platform strengthen plate
33
9
10
32
Note: DO NOT completely tighten
the limit sliders. Loosen 1/4 lap
after tightening.
4
Position the slider along the
bent edges of the columns.
Connect the slider to the cross
beam with bolts.
34
29
30
31

13
H. Illustration for cable installation
1. Pass through the cables from the platform to the columns according to the number of the
cables (See Fig. 20).
NO.
Cable
1
2
③
④
Length for 409-HP
(inc. connecting fitting)
133 7/4”
3400mm
388 3/4”
9875mm
196”
4980mm
326 1/8”
8250mm
Cable installation diagram
A
C
B
35
36
37
38
D
Fig. 20
A
B
C
D

14
2. The cable goes through the cross beam to top plate of columns and be screwed with cable
nuts (See Fig. 21).
Fig. 21
Cable goes between the
big pulley and tension
pulley
Cable pass through top
plate and be screwed
with cable nuts.
17

15
3. Illustration for platform cables (See Fig. 22).
Fig. 22
Cable ○
1
Cable ○
2
Cable ○
4
Cable ○
2
Cable ○
3
Cable ○
4
39
Socket Bolt M10*120
Cable ○
4
Cable ○
2
Cable ○
4
Cable ○
2
Cable ○
2
Cable ○
1
Cable ○
3

16
I. Install connecting bar for safety device and release handle (See Fig. 23).
View B
Cross beam B
Cross beam A
View A
22
44
Connecting bar
Safety lock rotating
device
Connecting bar
Safety lock
rotating device
Fig. 23
View A
45
Pass the connecting bar through
middle of safety lock rotating
device of cross beam A/B
Align the two connection holes of connecting
bar, safety lock rotating device Aand control
handle, then tighten them with M8*35
socket bolts, lock washers on cross beam A.
43
43A
45A
45
45B
Assemble extended handle, pull cable and plastic ball.
View B
Align the two connection holes of connecting
bar and safety lock rotating device B, then
tighten them with M8*35 socket bolts, lock
washers on cross beam B.

17
J. Install power unit and connecting tube
Note: Power unit must be installed at the same side of the safety release handle.
1. Install Power unit on the cross beam A, the installation of Connection tube is as Fig.24
Car in
direction
Cross beam A
Fig. 24
Cross beam B
201
22
8
10A
40
41
40
Fixing plate
GUDI
42
Install M8*25 Socket bolt with lock washer to these
two holes. (Connecting bar is connected with
connecting tube )
9
63
The connecting tube cross the fixing plate
10
46
201
9
47

18
K. Install Hydraulic System
1. For power unit attached to the column of cross beam A(See Fig. 25)
Note: Oil hoses connected to oil cylinder must be passed above the cable to avoid the oil
hose scratched by cable.
a
d
Cylinder inlet port
swing upward
Oil return hose
passed above
the cable
b
53
Fig. 25
52
The oil hose and oil return hose
pass through the protective hose
and connect to the power unit
48
4
55
49
50
55
52
51
50
56
55
54
Oil return hose
c
Retainer
a
b
c、d
49A
49C
Table of contents
Other AMGO Lifting System manuals