AMGO BP-9X Manual

TWO POST LIFT
Model: BP-9X BP-10

CONTENTS
Products features and specification…………………………………………………………...1
Installation requirement...................................................................3
Steps of installation ........................................................................5
Explosive view................................................................................17
Test run……………..............................................................................25
Operation instruction.......................................................................27
Maintenance...................................................................................28
Trouble shooting………………………………………………………………………………………….29
Lift Disposal .............................................................................................29

1
I. PRODUCT FEATURES AND SPECIFICATIONS
FLOORPLATE CHAIN-DRIVE TWO POST LIFT
Model BP9X , BP-10 (See Fig. 1)
· Compact design
· Dual hydraulic cylinders is designed and manufactured according to USA standard,
utilizing imported seals
· Self- lubricating UHMW Polyethylene sliders and bronze bush
· Floor-plate design, provide unobstructed floor space
· Single-point safety release, and dual safety design
· 4 three-stage arms design, combined drop-in and double screw rubber pad
assembly
Model
Lifting
Capacity
Lifting Height
Lifting
Time
Overall
Height
Overall
Width
Minimum
Pad Height
Motor
BP-9X
9000lbs
76-3/8”~85-3/8”
49s
111-7/8”
136-1/4”
3-1/2”~12-1/2”
2.0HP
BP-10
10000lbs
77-3/8”~86-3/8”
62s
111-7/8”
139-1/8”
3-1/2”~12-1/2”
2.0HP
Fig. 1

2
Arm Swings View
2560mm(100 3/4”)
Fig. 2

3
II. INSTALLATION REQUIREMENT
A. TOOLS REQUIRED
Rotary Hammer Drill (Φ19)
Hammer
Level Bar
English Spanner (12")
Ratchet Spanner With Socket (28#)
Wrench set
Carpenter’s Chalk
Screw Sets
Tape Measure (7.5m)
Pliers
Socket Head Wrench (6#)
Lock Wrench
(10#, 13#, 14#, 15#, 17#, 19#, 24#, 27#)
Fig. 3

4
B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal temperature, ventilated
and dry place.
C.The equipment should be unload and transfer by forklift.
D. SPECIFICATIONS OF CONCRETE (See Fig. 5).
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 6” minimum and without reinforcing steel bars, and
must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
(210kg/cm²) minimum.
3. Floors must be level and no cracks.
Concrete intensity must be
3000psi (210kg/cm²) minimum
Fig. 4
65
6”
Fig. 5

5
E. POWER SUPPLY
The electrical source must be 2.0HP minimum. The source cable size must be
2.5mm² and in good condition of contacting with floor.
III.STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter’s chalk line to establish installation layout of baseplate (See Fig. 6).
C. Check the parts before assembly.
1. Packaged lift and hydraulic power unit (See Fig. 7).
Fig. 7
Fig. 6
Chalk line
BP-9X:136-1/4”
BP-10:139-1/8’’

6
2. Move the lift aside with fork lift or hoist, and open the outer packing carefully, take off
the parts from upper and inside the column, take out the parts box, check the parts
according to the shipment parts list(See Fig. 8).
Fig. 8
3. Loosen the screws of the upper package stand, take off the upper column and
remove the package stand.
4. Move aside the parts and check the parts according to the shipment parts list.
(See Fig. 9, Fig. 10).
Shipment Parts list
Floor cover
Parts box
78
Fig. 10
Parts in the parts box (78)
Fig. 9

7
5. Open the carton of parts and check the parts according to parts box list(See Fig. 11).
D. Position power-side columns
Lay down two columns on the installation site parallelly, position the power-side
column according to the actual installation site. Usually, it is suggested to install
power-side column on the front-right side from which vehicles are driven to the lift
(See Fig. 12).
Fig. 12
Car in Direction
Power-side column
Offside column
Assemble top-plate
using M10*35 hex
bolt with nut and lock
washer
Fig. 11

8
E. Position columns (See Fig. 13)
Check the columns plumbness with level bar, and adjusting with the shims if the
columns are not vertical.
F. Fix anchor bolts
1. Prepare anchor bolts (See Fig. 14).
Fig. 14
2. Using the prescribed rotary hammer drill, and drill all the anchor holes and install the
anchor bolts. Then tighten the anchor bolts (See Fig. 15).
Note: Torque of Anchors is 150N.m .Minimum embedment of Anchors is 4-3/8”.
Fig. 15
Lock washer
Washer
Nut
4-3/8”
Check the columns plumbness
with level bar from front and
side
Fig.13
BP-9X:136-1/4”
BP-10:139-1/8”
112-1/4”

9
G. Raise up the carriage and lock it in the same position of safety device,
see Fig.16
Fig.16

10
H. Connecting the cables
1.Connect the cables follow step ato f. (See Fig. 17).
Fig.17
a. Cable pass through
the carriage
b. Push the carriages higher than
chain pulley, cable pass
through the top end of the
carriages and pass through
the hole of the bottom steel
plate of the carriages
c. Pass through the
cable from the small
pulley
d. Cable pass through
the small pulley in
another column
e. Pull out the cable from
bottom to top and hang
the cable on big pulley
f. The fitting of cable pass
through the hole of the
bottom steel plate of
the carriages and screw
the nuts.

11
2. Assemble cables (See Fig. 18)
Fig.18
The fitting of cable pass
through the hole of the
carriages and be screwed
with two cable nuts
66
67

12
I. Assemble oil hose assy. (See Fig. 19)
Fig.19
71
73
72
71
69
70
71
71
68

13
J. Install power unit and oil hose(See Fig. 20).
NOTE: Tighten oil hose and power unit fittings, avoid oil leakage. The oil hose of power
unit should be fixed with retainer.
Fig.20
After installing the fitting of
power unit , Locking the nut
using 19# ratchet spanner
75
73
Fix the oil hose by retainer.
5
73
74

14
2
51
Safety cable
connecting
direction
53
59
13
55
56
57
54
58
51
76
K. Install safety cable (See Fig. 21).
NOTE: 1. Assemble safety cable from offside safety assy.
2. Pay attention to the connecting direction of safety cable.
A View
B View
Fig.21

15
Floor cover
L, Assemble floor cover (See Fig. 22).
M. Install lifting arms and adjust the arm locks
After installing the lifting arms (See Fig.23). Lowing the carriages down to the lowest
position, then use the 8# wrench to loosen the nut of the fixed gear (see Fig.24), Adjust
the gear according to the arrow direction (see Fig.25), tighten the screws until the
gear and rack match in good condition (see Fig.26).
Fig.22
Use the 8#socket wrench to
loosen the nut of Moon gear
Fig. 23
Snap Ring
Fig. 24
Use wrench to
loosen the nut

16
NO NO
A2A2
A1
T1
T2
T3L3
L2
L1
M
~
G
N
L
外
接
电
源
按钮开关
N. Tighten all the hose fitting and fill the power unit with Hydraulic Oil.
In consideration of Hydraulic Power Unit’s durability and keep the equipment
running in the perfect condition, please use Hydraulic Oil 46#.
O. Install Electrical System
According to the circuit schematic, connect the power source on the data plate of Power
Unit.
Note: 1. For the safety of operators, the power wiring must contact the floor well.
2. Pay attention to the direction of rotations when using 380V, three phase motors.
Single phase motor (See Fig. 27).
1. Connecting the two power supply lines (active wire Land neutral wire N) to
terminals of AC contactor marked L1, L2 respectively.
2. Connecting the two motor wires to terminals of AC contactor marked T1, T2.
3. Connecting A2 to L2 of AC contactor.
4. Terminal 4# of control button is connected with terminals A1 of AC contactor;
Terminal 3# of control button is connected with terminals L1of AC contactor.
Fig. 27
Adjust the moon gear
Tighten the bolts
Fig. 25
Adjust gear and rack meshing.
Fig. 26
Lock the screws by wrench after the gear
and rack are in good meshing condition
单相
Power source
Control button AC contactor
Single Phase
Switch button

17
IV. EXPLODED VIEW
Model BP-9X , BP-10
Fig.28

18
Parts list for BP-9X, BP-10
Item No.
Part#
Description
QTY
BP-9X
BP-10
1
11203257
Power-side Column
1
0
11203259
0
1
2
10209011
Plastic Pulley
1
1
3
10209010
Snap Ring
2
2
4
10209008
Safety device protect cover
2
2
5
10209009
Cup Head Bolt
6
6
6
10206006
Washer
2
2
7
10206023A
Hex Nut
2
2
8
071101
Manual Power Unit
1
1
9
11206002
Safety Pin
2
2
10
10209007
Safety Spring
2
2
11
11203263
Power-side Safety device
1
1
12
10209012
Hair Pin
8
8
13
11203261
Safety Block (Main)
1
1
14
10209003
Hex Bolt
4
4
15
10209004
Rubber Ring
4
4
16
10209005
Self locking nut
8
8
17
11203003
Floor Cover
1
1
18
10201046A
Rubber Pad Assy.
4
4
18A
10420138
Socket Bolt
4
4
18B
10209134
Rubber Pad
4
4
18C
11680030C
Rubber Pad Frame
4
4
19
10203156
Lifting Arm Assy
4
4
20
11206020
Pulley
4
4
21
10209056
Self locking nut
2
2
22
10201002
Hex Bolt
14
14
23
10201010A
Chain Connector
4
4
24
10203005
Chain
2
2
25
10201008
Hydraulic Cylinder
2
2
10203078
0
2
26
11203176
Chain pulley support assy.
2
2
27
11203267
Power-side carriage
1
0
11203265
0
1
28
10209015
Slider
16
16
29
10209016
Carriage Plastic Cover
2
2
30
10206045
Protective Rubber Bar
4
4
31
10206046
Self-tapping Screw M4.5*50
4
4
32
10209153
Pull Ring for Arm Lock Bar
4
4
33
11206046A
Arm Lock Bar (left)
2
2
34
10217045
Snap Ring φ26*φ31*φ2.5
4
4
35
10217044
Moon gear
4
4
36
10206032
Snap Ring
4
4
37
10206036
Hair Pin
4
4
38
11217168
Arm Pin
4
4
39
10520023
Snap Ring
4
4
40
10206190
Tool Tray(short)
2
2
41
11206191
Toe guard (short)
4
4
Other manuals for BP-9X
1
This manual suits for next models
1
Table of contents
Other AMGO Lifting System manuals
Popular Lifting System manuals by other brands

HiGH-LiFT
HiGH-LiFT OPK-ME500 Manual instruction

Telpro
Telpro PaneL Lift 439 Operator's manual

Fantek
Fantek FT-6860 operating instructions

Milltronics
Milltronics MWL instruction manual

Lift Tech Marine
Lift Tech Marine DC REMOTE GEN 2 owner's manual

BraunAbility
BraunAbility Century 2 NCL10000 Series Service manual