AMGO BP-9 Manual

TWO POST LIFT
Model:BP-9

CONTENTS
Product Features and Specifications...............................................1
Installation Requirement ……………………………………………………………………..3
Step of Installation……………………………………………………………………………...5
Exploded View ..........................................................................17
Test Run ..................................................................................24
Operation Instruction ................................................................26
Maintenance ........................................................................... 27
Trouble Shooting ..................................................................... 28
Lift Disposal ......................................................................................28

1
I. PRODUCT FEATURES AND SPECIFICATIONS
FLOORPLATE CHAIN-DRIVE MODEL FEATURES
Model BP-9 (See Fig. 1)
. Compact Floor-plate design, provide unobstructed floor space
· Dual hydraulic cylinders is designed and manufactured according to standard,
utilizing imported seals
· Self- lubricating UHMW Polyethylene sliders and bronze bush
· Single-point safety release, and dual safety design
· 4 three-stage arms design with stackable rubber pads.
MODEL BP-9 SPECIFICATIONS
Model
Style
Lifting
Capacity
Lifting
Time
Lifting Height
Overall
Height
Overall
Width
Minimum
Pad Height
Motor
BP-9
Floor-plate
Chain-drived
9,000lbs
45S
71-1/2”~75-1/2”
108”
131-7/8’’
3-1/2’’-7-1/2’’
2.0 HP
Fig. 1

2
Arm Swings View
99"
45-5/8”
26-7/8”
Fig.2
45-5/8”
26-7/8”

3
II. INSTALLATION REQUIREMENT
A. TOOLS REQUIRED
Rotary Hammer Drill (Φ19)
Hammer
Level Bar
English Spanner (12")
Ratchet Spanner With Socket (28#)
Wrench set
Carpenter’s Chalk
Screw Sets
Tape Measure (7.5m)
Pliers
Socket Head Wrench (6#)
Lock Wrench
(10#, 13#, 14#, 15#, 17#, 19#, 24#, 27#)
Fig. 3

4
B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal
temperature, ventilated and dry place.
C. The equipment should be unload and transfer by forklift.
D. SPECIFICATIONS OF CONCRETE (See Fig. 5).
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 4” minimum and without reinforcing steel bars, and
must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
(210kg/cm²) minimum.
3. Floors must be level and no cracks.
Fig. 5
E. POWER SUPPLY
The electrical source must be 2.0HP minimum. The source cable size must be
2.5mm² and in good condition of contacting with floor.
63
Concrete intensity must be
3000psi (210kg/cm²) minimum
4”
Fig.4

5
III.STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter’s chalk line to establish installation layout of base-plate (See Fig. 6).
C. Check the parts before assembly.
1. Packaged lift and hydraulic power unit (See Fig. 7).
Fig. 7
2. Move the lift aside with fork lift or hoist, and open the outer packing carefully, take off
the parts from upper and inside the column, take out the parts box, check the parts
according to the shipment parts list(See Fig. 8)
Fig. 8
Fig. 6
图六
Chalk line
10-1/8”
6-Φ7/8”
5”
5”
6”
131-7/8”
Shipment Parts list
Floor cover
Parts box

6
3. Loosen the screws of the upper package stand, take off the upper column and
remove the package stand.
4. Move aside the parts and check the parts according to the shipment parts list.(See
Fig. 9, Fig. 10).
5. Open the carton of parts and check the parts according to parts box list
(See Fig. 11).
Fig. 11
Fig.9
75
Fig. 10
Parts in the parts box
(75)

7
D. Position power-side columns
Lay down two columns on the installation site parallelly, position the power-side
column according to the actual installation site. Usually, it is suggested to install
power-side column on the front-right side from which vehicles are driven to the lift
(See Fig. 12).
Fig. 12
E. Position columns (See Fig. 13)
Check the columns plumbness with level bar, and adjusting with the shims if the
columns are not vertical.
Fig. 13
Car in Direction
Power-side column
Offside column
Assemble top-plate
using M10*35 hex
bolt with nut and lock
washer
109-1/2”
131-7/8”
Check the columns
plumbness with level
bar from front and side

8
F. Fix anchor bolts
1. Prepare anchor bolts (See Fig. 14).
2. Using the prescribed rotary hammer drill, and drill all the anchor holes and install the
anchor bolts. Then tighten the anchor bolts (See Fig. 15).
Note: Torque of Anchors is 150N.m .Minimum embedment of Anchors is 3-1/2’’.
G. Lift the carriages up by hand and make them be locked at the same level
(See Fig. 16).
Lock washer
Washer
Nut
3-1/2”
Fig.14
Fig.15
63
Fig.16

9
H.Connecting the cables
1.Connect the cables follow step ato f. (See Fig. 17).
b. Push the carriages higher
than chain pulley, cable pass
through the top end of the
carriages and pass through
the hole of the bottom steel
plate of the carriages
Fig.17
f. The fitting of cable pass
through the hole of the
bottom steel plate of the
carriages and screw the
nuts.
a. Cable pass through
the carriage
c. hang the cable on
small pulley and then
pull out the cable
d. Cable pass
through the
small pulley in
another
column
e. Pull out the
cable from
bottom to top
and hang the
cable on big
pulley

10
I. Install cable (See Fig. 18)
Fig.18
The fitting of cable pass
through the hole of the
carriages and be screwed
with two cable nuts.
65
64

11
J. Assembly oil hose assy. (See Fig. 19)
Fig. 19
69
71
70
69
67
68
69
66
69

12
K. Install hydraulic power unit and oil hose assy. (See Fig. 20).
Note: Tighten oil hose and power unit fittings, avoid oil leakage. The oil hose of power
unit should be fixed with retainer.
Fig.20
After installing the fitting of
power unit , Locking the nut
using 19# ratchet spanner
73
71
Fix the oil hose by retainer.
5
71
72

13
52
54
13
60
56
55
57
58
59
52
74
Safety cable
connecting
direction
2
L. Install safety cable (See Fig. 21).
NOTE: 1. Assemble safety cable from off-side safety assy.
2. Pay attention to the connecting direction of safety cable.
Fig. 21
View A
View B

14
Protective
rubber sets
Floor Cover
M. Assemble floor cover and protective rubber sets (See Fig. 22).
Fig.22

15
N. Install lifting arms and adjust the arm locks
1. After installing the lifting arms (See Fig.23).
2. Lowing down the carriage to the lowest position, use 17# spanner to loose fixed nut(see
Fig.24),
3. Adjust the arm lock follow the arrow direction(see Fig.25),
4. Tighten the screws until arm lock and moon gear match in good condition. (see Fig.26).
O. Tighten all the hydraulic fittings, and fill the reservoir with hydraulic oil.
Note: In consideration of Power Unit’s durability and keep the equipment
running in the perfect condition, please use Hydraulic Oil 46#.
Fig. 24
Loosen the nut
The arm lock meshes
with the moon gear
Tighten the nut of
arm lock
Snap Ring
Fig. 25
Adjust gear and arm
lock engagement
Adjusting
arm lock
Fig. 26
Fig. 23

16
P. Install Electrical System
Connect the power source on the data plate of Power Unit.
Note: For the safety of operators, the power wiring must contact the floor well.
Single phase motor
1. Circuit diagram (See Fig. 27)
2. Connection step (See Fig. 28)
Connecting the two power supply wires (active wire Land neutral wire N) to terminals
of AC contactor marked L1, L3 respectively. Earth wire( yellow and green wire) is
connected with the earth wire terminal of the motor
Fig. 27
Power supply wires
Fig. 28

17
IV. EXPLODED VIEW
Model BP-9
Fig.29
31
32
33
34
35
36
37
38

18
PARTS LIST
Item
Part#
Description
Qty.
Note
1
11205039
Power-side column
1
2
10209011
Plastic pulley for safety device(white)
1
3
10209010
Snap ring φ10
2
4
10209008
Safety device protect cover
2
5
10209009
Cap head bolt M6*8
6
6
10206006
Washer φ12
2
7
10206023A
Hex nut M12
2
8
071101
Manual power unit
1
9
11206002
Safety pin
2
10
10209007
Safety spring
2
11
11203263
Power-side safety main lock
1
12
11209012
Hair pin
8
13
11203261
Power-side safety device
1
14
10209005
Self locking nut M8
8
15
10209004
Rubber ring φ8*20*3
4
16
10209003
Hex bolt M8x25
4
17
11205002
Floor cover
1
18
10201046A
Rubber pad support assy.
4
18A
10420138
Socket bolt M6*16
4
18B
10209134
Rubber pad
4
18C
11680030C
Rubber Pad support frame
4
19
11206020
Pulley
4
20
10209056
Self locking nut M10
2
21
11201043A
Lifting arm assy
4
22
10201010
Chain connector
4
23
10201009A
Chain
2
24
10201008A
Cylinder
2
25
11203176
Chain Pulley Support Assy.
2
26
11205041
Power side carriage
1
27
10206044
Slider Block
16
28
10209016
Carriage plastic cover
2
29
10206045
Protective rubber
2
30
10206046
Self-tapping screw
4
31
10209020
Plastic Ball
4
32
10209021
Hex nut M10
8
33
10209022
Washer φ10
10
34
10209023A
Arm lock
4
35
11201041
Limit Plate
4
36
11209024
Arm Lock Handle
4
37
10209025
Hair pin
4
38
10209026
Spring
4
39
10209027
Protective rubber set
4
40
11205042
Offside carriage
1
41
11209030A
Lifting arm pin
4
42
10520023
Snap ring φ38
4
Table of contents
Other AMGO Lifting System manuals