manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Growatt
  6. •
  7. Measuring Instrument
  8. •
  9. Growatt MOD 3-15KTL3-X User manual

Growatt MOD 3-15KTL3-X User manual

123456781112109MOD 3-15KTL3-X Quick Guide452.2171.887.4
391.5213141
2.3 Communication module installationInverter sideInverter sideInverter sideInverter side▲UpUninstallInstall
3.
Electrical connectionPlease prepare the cable before connecting as follows.1234Cable namePV input wireTypeTwo or three polychromaticmulti-core copper wiresPV wire(such as PV1-F)RS485Recommend model 6mm² 6mm²4mm² - 6mm²/No.AC output wiregrounding wireProtectiveSingle multi-coreyellow-green wire1.Please make sure all switches are in “OFF” position before wiring. For personal safety, please do not operate with electricity.2.If the diameter of the cable does not match the terminal, or the cable is aluminum wire, please contact our after-sales personnel.Note:3.1 Grounding3.2 AC output connection3.3 DC connection3.3.1 PV input terminal installationSystem overview2.1 Installation requirements2.2 Wall mountingNote:1.When drilling holes in the wall, avoid water and electricity pipes, otherwise it may cause danger.
1.2.
(1)Front panel(2)Touch button (3)LCD screen (4)LED indicator (5)Mounting bracket (6)Heat sink(7)DC switch(8)PV terminal(9)RS485 port(10)USB port(11)Vent valve(12)AC terminal1.This document is for quick installation guidance only, please refer to User Manual for more details.2.Growatt shall not be liable for any damage resulting from unproper installation.Note:Note:OverviewInstallation≥300mm
≥300mm
≥300mm≥300mm≥300mm186.4178.412345
Dual MPPTs for MOD 3-11KTL3-X,one string input per MPPT.Dual MPPTs for MOD 12-15KTL3-X & MOD 7-11KTL3-X-AU,one MPPT has one string,and other one has two strings.Communicationwire
8-10mm12345
4mm² - 6mm²4mm² - 6mm²Positive metal terminalPositive metal terminalNegative metal terminalNegative metal terminalNegative metal terminalPlease make sure the cable can not be pulled out after pressing.Pull the PV cable make sure thereis no loos or shaking.Make sure the cable polarity iscorrect and voltage is less than1100V.
GR-UM-204-A-02
PV+PV-12Customer can read more information by push button.
Mark
Describe
Explain
Touch mark
Single touch
Switch the display interface or the current number plus 1
Double touch
Enter the setting state or confirm
Triple touch
Return to the previous display interface
Long press for 5s
The current data returns to the default value
Inverter status indicator
Red
Fault
Green
Normal operation
Red light flashing
Warning
It can display the basic information of inverter through LCD display screen (PV/AC voltage,PV power,AC current,total power,generating capacity, etc.).
Shenzhen Growatt New Energy CO.,LTDNo.28 Guangming Road, Shiyan Street, Bao’an District, Shenzhen, P.R.China +86 0755 2747 1942www.ginverter.comTE [email protected]W7.Status of PV grid inverter
9.
Service and contactNote:1.Before installing the PV terminal, please double-check that the PV input voltage and current do not exceed the MPPT limits.2.When installing the PV terminal, pay attention to the difference between the positive and negative poles and the one-to-one correspondence between the terminals and the machine.3.There is a "click" sound when the terminal is connected,please gently pulling the PV wire to make sure there is no loose or pulling off.3.3.3 Communication cable installationInverter sideClick
5.
Post-installation check
No.
Acceptance criteria
No.
Acceptance criteria
1
The inverter is installed correctly, firmly and reliably.
6
The RS485 communication cable is installed correctly and firmly.
2
The ground wire connected well and the connection is firm and reliable.
7
The cable tie port is trimmed well without leaving sharp corners,meets the requirements of the user.
3
All switches are in the OFF state.
8
All exposed terminals are well protected and there are no vacant ports.
4
All wiring is correct and securely connected.
9
Pay attention to clean up all construction residues.
5
The wiring of the cable is reasonable, meets the requirements, and there is no phenomenon of broken skin.
DownloadManualGrowatt New Energy3.3.2 Plug in PV terminalClick!Click!
No.
Description
Remarks
1
+12V
Dry junction : external relay coil interface, power is not more than 2W
2
COM
3
RS485A1
RS485 communication port
4
RS485B1
5
RS485A2
BAT communication port(reserved)
6
RS485B2
7
RS485A3
Meter communication port
8
RS485B3
9
DRM1/5
Relay contact 1 input
10
DRM2/6
Relay contact 2 input
11
DRM3/7
Relay contact 3 input
12
DRM4/8
Relay contact 4 input
13
REF/GEN
GND
14
DRM0/COM
/
No.
RRCR Description
Active Power
9
K1-out
0%
10
K2-out
30%
11
K3-out
60%
12
K4-out
100%
13
Relays common node
/
14
/
/
When connecting the communication line,port 15 and 16 are not connected,as for the other function,please refer to the above tableaccording to the customer needs.Note:connectto RRCRConnecting Meter
4.
The following table describes how we can connect EASTRON meter (TPM-E)to inverter:Meter Pin NO.DescriptionMeter Connection1/2/3/45/6/7/8ABL1/L2/L3/N-inL1/L2/L3/N-outRS485ARS485BGrid L1/L2/L3/NAC connector & Load L1/L2/L3/NSYS COM Pin 7 RS485A2SYS COM Pin 8 RS485B2Before turning the inverter on, please make sure the PV input voltage and current are within the MPPT limits. Follow the steps below to turn the inverter on:1.Switch on the build-in DC isolator at the bottom of the inverter.2.Switch on the PV Array and DC isolator next to your inverter, if you can not find this switch, skip this step.3.Switch on the Solar AC isolator if the inverter is more than 3 meters away from your switchboard.4.Switch on the solar supply main switch in the switch board.To shut down your system, follow this guide in reverse order.Note:
6.
Power on and off steps
8.
Export limitation settingExporlimitOFF ONPassword123
Set parameter
GeneralAdvancedMeter CTExportLimit Rate XXX.X%Set OKIf the local grid company requires to limit the output power from your inverter systems,we introduce the concept of Export Limit Rate.The ratio of your system output power divided by the rated power of the inverter is called Export Limited Rate.For example,if the local grid companyonly accepts 4kW from your 5kW system,then the Export Limit Rate of 5kW inverter should be 80%.
L1L2L3NL1L2L3N1234L1L2L3N5678B A

Other manuals for MOD 3-15KTL3-X

1

Other Growatt Measuring Instrument manuals

Growatt ShineLimit User manual

Growatt

Growatt ShineLimit User manual

Growatt TPM-CT-C-EU User manual

Growatt

Growatt TPM-CT-C-EU User manual

Growatt ShineWiFi-X User manual

Growatt

Growatt ShineWiFi-X User manual

Growatt ShineLink-X Operating and maintenance instructions

Growatt

Growatt ShineLink-X Operating and maintenance instructions

Growatt Smart Meter-US User manual

Growatt

Growatt Smart Meter-US User manual

Growatt Shine3G Instruction sheet

Growatt

Growatt Shine3G Instruction sheet

Growatt ShineVision User manual

Growatt

Growatt ShineVision User manual

Growatt ShineWiFi-X User manual

Growatt

Growatt ShineWiFi-X User manual

Growatt ShineWiFi-S Instruction sheet

Growatt

Growatt ShineWiFi-S Instruction sheet

Growatt Lucas User manual

Growatt

Growatt Lucas User manual

Growatt TPM-CT-E-US User manual

Growatt

Growatt TPM-CT-E-US User manual

Growatt SPH Series User manual

Growatt

Growatt SPH Series User manual

Growatt ShineWiFi Instruction sheet

Growatt

Growatt ShineWiFi Instruction sheet

Growatt ShineWiFi-X Instruction sheet

Growatt

Growatt ShineWiFi-X Instruction sheet

Growatt MIN TL-X Manual

Growatt

Growatt MIN TL-X Manual

Growatt ShineLink-X User manual

Growatt

Growatt ShineLink-X User manual

Growatt ShineWiFi-X User manual

Growatt

Growatt ShineWiFi-X User manual

Growatt ShineMaster User manual

Growatt

Growatt ShineMaster User manual

Growatt TPM-E SDM630-Modbus V3 User manual

Growatt

Growatt TPM-E SDM630-Modbus V3 User manual

Growatt TPM-CT-E-EU User manual

Growatt

Growatt TPM-CT-E-EU User manual

Growatt Shine GPRS-F User manual

Growatt

Growatt Shine GPRS-F User manual

Popular Measuring Instrument manuals by other brands

LaserLiner ClimaHome-Check manual

LaserLiner

LaserLiner ClimaHome-Check manual

ATOMSTACK M40 Installation instructions manual

ATOMSTACK

ATOMSTACK M40 Installation instructions manual

Innolas Laser nanio Series User and installation manual

Innolas Laser

Innolas Laser nanio Series User and installation manual

SD Biosensor STANDARD F2400 user manual

SD Biosensor

SD Biosensor STANDARD F2400 user manual

horiba IG-320 user guide

horiba

horiba IG-320 user guide

Moen Flo Smart Water Shutof manual

Moen

Moen Flo Smart Water Shutof manual

VEE GEE CTX-2 Operation manual

VEE GEE

VEE GEE CTX-2 Operation manual

Particle Measuring Systems LASAIR II 310 Operator's manual

Particle Measuring Systems

Particle Measuring Systems LASAIR II 310 Operator's manual

ICS Schneider Messtechnik IAKV-2VR4C user manual

ICS Schneider Messtechnik

ICS Schneider Messtechnik IAKV-2VR4C user manual

Dwyer Instruments TUF series Specifications-installation and operating instructions

Dwyer Instruments

Dwyer Instruments TUF series Specifications-installation and operating instructions

Tektronix TLA7016 Security instructions

Tektronix

Tektronix TLA7016 Security instructions

Kobold Heinrichs HPC Supplementary Operating Manual

Kobold

Kobold Heinrichs HPC Supplementary Operating Manual

T&D TR7 Series quick start guide

T&D

T&D TR7 Series quick start guide

Chrono-Log 490 4+4 instruction manual

Chrono-Log

Chrono-Log 490 4+4 instruction manual

PCE Instruments PCE-P05 instruction manual

PCE Instruments

PCE Instruments PCE-P05 instruction manual

Eurolube 10400 quick start guide

Eurolube

Eurolube 10400 quick start guide

ABB 8002 operating instructions

ABB

ABB 8002 operating instructions

WIKA A-AI-1 operating instructions

WIKA

WIKA A-AI-1 operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.