Growatt MOD 3-15KTL3-X User manual

123456781112109MOD 3-15KTL3-X Quick Guide452.2171.887.4
391.5213141
2.3 Communication module installationInverter sideInverter sideInverter sideInverter side▲UpUninstallInstall
3.
Electrical connectionPlease prepare the cable before connecting as follows.1234Cable namePV input wireTypeTwo or three polychromaticmulti-core copper wiresPV wire(such as PV1-F)RS485Recommend model 6mm² 6mm²4mm² - 6mm²/No.AC output wiregrounding wireProtectiveSingle multi-coreyellow-green wire1.Please make sure all switches are in “OFF” position before wiring. For personal safety, please do not operate with electricity.2.If the diameter of the cable does not match the terminal, or the cable is aluminum wire, please contact our after-sales personnel.Note:3.1 Grounding3.2 AC output connection3.3 DC connection3.3.1 PV input terminal installationSystem overview2.1 Installation requirements2.2 Wall mountingNote:1.When drilling holes in the wall, avoid water and electricity pipes, otherwise it may cause danger.
1.2.
(1)Front panel(2)Touch button (3)LCD screen (4)LED indicator (5)Mounting bracket (6)Heat sink(7)DC switch(8)PV terminal(9)RS485 port(10)USB port(11)Vent valve(12)AC terminal1.This document is for quick installation guidance only, please refer to User Manual for more details.2.Growatt shall not be liable for any damage resulting from unproper installation.Note:Note:OverviewInstallation≥300mm
≥300mm
≥300mm≥300mm≥300mm186.4178.412345
Dual MPPTs for MOD 3-11KTL3-X,one string input per MPPT.Dual MPPTs for MOD 12-15KTL3-X & MOD 7-11KTL3-X-AU,one MPPT has one string,and other one has two strings.Communicationwire
8-10mm12345
4mm² - 6mm²4mm² - 6mm²Positive metal terminalPositive metal terminalNegative metal terminalNegative metal terminalNegative metal terminalPlease make sure the cable can not be pulled out after pressing.Pull the PV cable make sure thereis no loos or shaking.Make sure the cable polarity iscorrect and voltage is less than1100V.
GR-UM-204-A-02
PV+PV-12Customer can read more information by push button.
Mark
Describe
Explain
Touch mark
Single touch
Switch the display interface or the current number plus 1
Double touch
Enter the setting state or confirm
Triple touch
Return to the previous display interface
Long press for 5s
The current data returns to the default value
Inverter status indicator
Red
Fault
Green
Normal operation
Red light flashing
Warning
It can display the basic information of inverter through LCD display screen (PV/AC voltage,PV power,AC current,total power,generating capacity, etc.).
Shenzhen Growatt New Energy CO.,LTDNo.28 Guangming Road, Shiyan Street, Bao’an District, Shenzhen, P.R.China +86 0755 2747 1942www.ginverter.comTE [email protected]W7.Status of PV grid inverter
9.
Service and contactNote:1.Before installing the PV terminal, please double-check that the PV input voltage and current do not exceed the MPPT limits.2.When installing the PV terminal, pay attention to the difference between the positive and negative poles and the one-to-one correspondence between the terminals and the machine.3.There is a "click" sound when the terminal is connected,please gently pulling the PV wire to make sure there is no loose or pulling off.3.3.3 Communication cable installationInverter sideClick
5.
Post-installation check
No.
Acceptance criteria
No.
Acceptance criteria
1
The inverter is installed correctly, firmly and reliably.
6
The RS485 communication cable is installed correctly and firmly.
2
The ground wire connected well and the connection is firm and reliable.
7
The cable tie port is trimmed well without leaving sharp corners,meets the requirements of the user.
3
All switches are in the OFF state.
8
All exposed terminals are well protected and there are no vacant ports.
4
All wiring is correct and securely connected.
9
Pay attention to clean up all construction residues.
5
The wiring of the cable is reasonable, meets the requirements, and there is no phenomenon of broken skin.
DownloadManualGrowatt New Energy3.3.2 Plug in PV terminalClick!Click!
No.
Description
Remarks
1
+12V
Dry junction : external relay coil interface, power is not more than 2W
2
COM
3
RS485A1
RS485 communication port
4
RS485B1
5
RS485A2
BAT communication port(reserved)
6
RS485B2
7
RS485A3
Meter communication port
8
RS485B3
9
DRM1/5
Relay contact 1 input
10
DRM2/6
Relay contact 2 input
11
DRM3/7
Relay contact 3 input
12
DRM4/8
Relay contact 4 input
13
REF/GEN
GND
14
DRM0/COM
/
No.
RRCR Description
Active Power
9
K1-out
0%
10
K2-out
30%
11
K3-out
60%
12
K4-out
100%
13
Relays common node
/
14
/
/
When connecting the communication line,port 15 and 16 are not connected,as for the other function,please refer to the above tableaccording to the customer needs.Note:connectto RRCRConnecting Meter
4.
The following table describes how we can connect EASTRON meter (TPM-E)to inverter:Meter Pin NO.DescriptionMeter Connection1/2/3/45/6/7/8ABL1/L2/L3/N-inL1/L2/L3/N-outRS485ARS485BGrid L1/L2/L3/NAC connector & Load L1/L2/L3/NSYS COM Pin 7 RS485A2SYS COM Pin 8 RS485B2Before turning the inverter on, please make sure the PV input voltage and current are within the MPPT limits. Follow the steps below to turn the inverter on:1.Switch on the build-in DC isolator at the bottom of the inverter.2.Switch on the PV Array and DC isolator next to your inverter, if you can not find this switch, skip this step.3.Switch on the Solar AC isolator if the inverter is more than 3 meters away from your switchboard.4.Switch on the solar supply main switch in the switch board.To shut down your system, follow this guide in reverse order.Note:
6.
Power on and off steps
8.
Export limitation settingExporlimitOFF ONPassword123
Set parameter
GeneralAdvancedMeter CTExportLimit Rate XXX.X%Set OKIf the local grid company requires to limit the output power from your inverter systems,we introduce the concept of Export Limit Rate.The ratio of your system output power divided by the rated power of the inverter is called Export Limited Rate.For example,if the local grid companyonly accepts 4kW from your 5kW system,then the Export Limit Rate of 5kW inverter should be 80%.
L1L2L3NL1L2L3N1234L1L2L3N5678B A

Other manuals for MOD 3-15KTL3-X

1

Other Growatt Measuring Instrument manuals

Growatt TPM-CT-E-US User manual

Growatt

Growatt TPM-CT-E-US User manual

Growatt Shine3G Instruction sheet

Growatt

Growatt Shine3G Instruction sheet

Growatt ShineLink-X Operating and maintenance instructions

Growatt

Growatt ShineLink-X Operating and maintenance instructions

Growatt TPM-CT-C-EU User manual

Growatt

Growatt TPM-CT-C-EU User manual

Growatt ShineVision User manual

Growatt

Growatt ShineVision User manual

Growatt TPM-E SDM630-Modbus V3 User manual

Growatt

Growatt TPM-E SDM630-Modbus V3 User manual

Growatt TPM-CT-E-EU User manual

Growatt

Growatt TPM-CT-E-EU User manual

Growatt SPH Series User manual

Growatt

Growatt SPH Series User manual

Growatt ShineLimit User manual

Growatt

Growatt ShineLimit User manual

Growatt ShineWiFi Instruction sheet

Growatt

Growatt ShineWiFi Instruction sheet

Growatt ShineLink-X User manual

Growatt

Growatt ShineLink-X User manual

Growatt Lucas User manual

Growatt

Growatt Lucas User manual

Growatt ShineWiFi-X Instruction sheet

Growatt

Growatt ShineWiFi-X Instruction sheet

Growatt MIN TL-X Manual

Growatt

Growatt MIN TL-X Manual

Growatt ShineMaster User manual

Growatt

Growatt ShineMaster User manual

Growatt Smart Meter-US User manual

Growatt

Growatt Smart Meter-US User manual

Growatt ShineWiFi-X User manual

Growatt

Growatt ShineWiFi-X User manual

Growatt ShineWiFi-X User manual

Growatt

Growatt ShineWiFi-X User manual

Growatt Shine GPRS-F User manual

Growatt

Growatt Shine GPRS-F User manual

Growatt ShineWiFi-S Instruction sheet

Growatt

Growatt ShineWiFi-S Instruction sheet

Growatt ShineWiFi-X User manual

Growatt

Growatt ShineWiFi-X User manual

Popular Measuring Instrument manuals by other brands

Campbell TDR100 instruction manual

Campbell

Campbell TDR100 instruction manual

Grodan WCM-control quick guide

Grodan

Grodan WCM-control quick guide

ABB SensyMaster FMT230 Commissioning Instruction

ABB

ABB SensyMaster FMT230 Commissioning Instruction

Hach DR 6000 user manual

Hach

Hach DR 6000 user manual

Renishaw RMP600 installation guide

Renishaw

Renishaw RMP600 installation guide

Spotsee SpotBot Cellular product manual

Spotsee

Spotsee SpotBot Cellular product manual

Thermo Scientific MIRAN 205B Series instruction manual

Thermo Scientific

Thermo Scientific MIRAN 205B Series instruction manual

Sensaphone 800 user manual

Sensaphone

Sensaphone 800 user manual

Xylem WTW OxiTop-IDS Multi 3630 IDS operating manual

Xylem

Xylem WTW OxiTop-IDS Multi 3630 IDS operating manual

Chauvin Arnoux CA 10141E user manual

Chauvin Arnoux

Chauvin Arnoux CA 10141E user manual

LumaSense IN 300/5 Operation manual

LumaSense

LumaSense IN 300/5 Operation manual

Gigahertz Solutions HF35C manual

Gigahertz Solutions

Gigahertz Solutions HF35C manual

AlazarTech ATS9626 user manual

AlazarTech

AlazarTech ATS9626 user manual

Hanna Instruments HI 991401 user manual

Hanna Instruments

Hanna Instruments HI 991401 user manual

DH Instruments AMH-100 Operation and maintenance manual

DH Instruments

DH Instruments AMH-100 Operation and maintenance manual

Teledyne Lecroy Frontline Sodera LE quick start guide

Teledyne Lecroy

Teledyne Lecroy Frontline Sodera LE quick start guide

RS PRO RS 1400 Series operating manual

RS PRO

RS PRO RS 1400 Series operating manual

Bixion III user guide

Bixion

Bixion III user guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.