
Directory of contents
3Installation instructions
1Introduction......................................................................... 5
1.1About this manual ............................................................................ 5
1.1.1Explanation of signs .................................................................................. 6
1.2Personnel qualifications.................................................................. 7
1.3Use of the unit................................................................................... 7
1.4Warranty............................................................................................ 7
2Safety instructions ............................................................. 8
3Description of the unit ..................................................... 10
3.1Overview of the unit ....................................................................... 10
3.2Planning drawing............................................................................ 11
3.3Unit and connection data............................................................... 12
4Transporting the unit ....................................................... 18
4.1Transporting the unit to the installation site ............................... 18
4.2Unpacking the unit ......................................................................... 19
5Installing the unit.............................................................. 20
5.1Maintaining minimum clearances................................................. 21
5.2Lifting the unit off the pallet .......................................................... 23
5.3Installing the unit on the unit legs ................................................ 23
5.4Setting up the unit on a base frame.............................................. 24
5.4.1Installing the support rack ....................................................................... 25
5.5Aligning the unit ............................................................................. 25
5.6Fastening the unit to the floor....................................................... 25
5.6.1Securing the unit to prevent tipping......................................................... 25
5.6.2Securing the unit to prevent slipping ....................................................... 28
5.6.3Unit on casters: Attach both castor stops to the floor.............................. 30
5.7Unit on casters: Secure device to the wall .................................. 30
6Connecting the unit.......................................................... 31
6.1Opening and closing the housing................................................. 31
6.1.1Removing and attaching the side wall..................................................... 31
6.2Making the electrical connection.................................................. 32
6.2.1Adjusting the unit to the supply voltage................................................... 34
6.2.2Connecting the electrical connection line ................................................ 36
6.2.3Connecting the power optimization system............................................. 37
6.2.4Connecting the potential equalization ..................................................... 38
6.3Connecting the kitchen guiding system ...................................... 39
6.4Performing the basic setting of the control................................. 40
6.4.1Changing the basic setting of the control ................................................ 40
6.5Making the water connection ........................................................ 41
6.5.1Connecting the drinking water connection line........................................ 42
6.5.2Connecting softened drinking water to both connections........................ 43
FM08-662C