
Contents
ii
4.7.18 Install the Rack Carrier .................................................................................34
4.8 High Limit Thermocouples Replacement................................................................35
4.8.1 Troubleshooting.............................................................................................35
4.8.2 Replacement .................................................................................................36
4.9 High Limit Module Replacement............................................................................37
4.10 Primary Contactor Replacement..........................................................................38
4.11 Heat Contactor Replacement ..............................................................................39
4.12 AIF Multi-Tab Transformer Replacement ..............................................................40
4.13 Control Transformer Replacement.......................................................................41
4.14 Drain Valve and Actuator Replacement ................................................................42
4.14.1 Prepare the Fryer.........................................................................................42
4.14.2 Remove the Drain Valve Extension................................................................42
4.14.3 Remove the Actuator and Drain Valve............................................................42
4.14.4 Install the Drain Valve and Actuator ...............................................................43
4.14.5 Install the Drain Valve Extension ...................................................................43
4.14.6 Install the Drain Valve Actuator......................................................................43
4.14.7 Test the Drain Valve and Actuator Operation ..................................................44
4.15 Filter Pump Motor Replacement ..........................................................................44
4.16 Filter Pump Motor Seal Replacement...................................................................46
4.17 Filter Pump Motor Roller Replacement.................................................................47
4.18 Flex Tube Replacement......................................................................................48
4.19 Lid Cable Replacement ......................................................................................48
4.20 Label Replacement ............................................................................................50
Chapter 5 Replaceable Parts .........................................................................................53
5.1 Parts ...................................................................................................................53
5.1.1 Introduction ...................................................................................................53
5.1.2 Genuine Parts ...............................................................................................53
5.1.3 When Ordering Parts......................................................................................53
5.1.4 Prices ...........................................................................................................53
5.1.5 Delivery.........................................................................................................53
5.1.6 Warranty .......................................................................................................53
5.1.7 Recommended Spare Parts For Distributors ....................................................53
5.1.8 Lid Hardware.................................................................................................71
5.1.9 Lid Complete Assembly (and Language Specific Labels) ..................................71
5.1.10 Lasered Acrylic Labels .................................................................................73
Chapter 6 Wiring and Plumbing Diagrams.......................................................................79
6.1 208-240V 3PH 3+G 24V Controls..........................................................................79
6.2 480V 3PH 3+G 24V Controls ................................................................................80
6.3 380-415V 3PH 3+G 24V Controls..........................................................................81
6.4 Oil Line Connections for Bulk Disposal...................................................................82
6.5 Oil Line Connections for Non-Bulk Disposal ...........................................................83
Chapter 7 Annual Inspection Checklist ...........................................................................85
Chapter 8 Annual Inspection Procedures ........................................................................89
8.1 Required Parts and Tools......................................................................................89
8.1.1 Parts.............................................................................................................89
8.1.2 Tools.............................................................................................................89
8.2 Steam Exhaust Hose Insert Inspection ..................................................................90
8.3 Condensation Box and Component Inspection .......................................................91
8.4 Safety Relief Valve Inspection ...............................................................................92
8.5 Pressure System Tubing Cleaning and Inspection ..................................................93