Before we start, here are some things to be aware of:
This is the assembly instruction for left hand opening door Kolo
Duo without furniture.
A packaged Kolo Duo unit weights 511 kg and will require
2-3 persons to install. It takes an average of 45 - 90 min to
install Kolo Duo.
Please assemble with caution and make sure that the installation
site is protected to prevent any injuries or risks of damaging the
product and surrounding.
Position and assemble Kolo Duo as close to its final placement
as possible. If needed, a fully assembled Kolo Duo can be
repositioned by retracting its four leveling feet and moved with
its bottom rollers. When moving the unit, DO NOT push the unit
against the rollers’ direction! You may risk tipping Kolo Duo or
damaging its rollers.
Make sure you have all the required tools listed (pg. 03).
We recommend leaving at least 30 cm of space between the
wall or between multiple units of Kolo Duo.
Make sure that the Kolo Duo power source can safely load
10amp. When the ventilation is on, LED light is at its full
lumination, and the power charging station is not in use, the
wattage usage is 24W. The power cord fuse is set at 7amp to
prevent overloading.
Kolo Duo comes with 2 AC power outlets and 2 USB charging
outlets. DO NOT plug in any electronic devices that uses over
5amp.