Before we start, here are some things to be aware of:
This is the assembly instruction for right hand opening door
Kolo Solo without stool.
A packaged Kolo Solo unit weights 271 kg and will require
2-3 persons to install. It takes an average of 30 - 45 min to
install Kolo Solo.
Please assemble with caution and make sure that the installation
site is protected to prevent any injuries or risks of damaging the
product and surrounding.
Position and assemble Kolo Solo as close to its final placement
as possible. If needed, a fully assembled Kolo Solo can be
repositioned by retracting its four leveling feet and moved with
its bottom rollers. When moving the unit, DO NOT push the unit
against the rollers’ direction! You may risk tipping Kolo Solo or
damaging its rollers.
Make sure you have all the required tools listed (pg. 03).
We recommend leaving at least 30 cm of space between the
wall or between multiple units of Kolo Solo.
Make sure that the Kolo Solo power source can safely load
10amp. When the ventilation is on, LED light is at its full
lumination, and the power charging station is not in use, the
wattage usage is 22W. The power cord fuse is set at 7amp to
prevent overloading.
Kolo Solo comes with 2 AC power outlets and 2 USB charging
outlets. DO NOT plug in any electronic devices that uses over
5amp.