Equipment lifting setup
Displayed here are the three standard lifting setups that are suitable
for use with ACX Ascender. They are shown for illustration purposes
only. For more advanced setups or specific guidance, please contact
SKYLOTEC or an SKYLOTEC distributor.
Equipment lifting
The ACX Power Ascender is approved as an equipment lifting system, under
the Machinery Directive 2006/42/EC, when the following requirements are met:
The Ascender is used in combination with SKYLOTEC Equipment Lifting Rope (ELR) and
other equipment that meets lifting requirements.
Each rope system must be connected to an anchor that meets the appropriate personal
lifting requirements. A competent person shall judge if the anchor points are sufficient
and safe to use. WLL
(WORKING LOAD LIMIT) 200 kg
SKYLOTEC
GmbH
|
Im
Mühlengrund
6-8
|
56566
Neuwied
|
T
el
+49
(0)
2631
·
9680-0
|
[email protected] |
www.skylotec.com
Always keep an eye on the load while lifting Avoid excessive inching (i.e. short pulses of the motor)
Do not exceed the Safe Working Load (SWL)
of the entire lifting system Stay clear of the load whilst lifting
Do not try to lift fixed or obstructed loads Do not stand under the suspended load
Do not side-pull loads Use hand signal or radio communications
during lifting operation
Basic lifting safety rules
Top-rigged
Basic setup
Bottom-rigged
Basic setup
Running Ascender
Expert use only
Pulley
Expert use only
Note
The Ascender operator should, at all times, control the
unloaded rope during lifting operations to avoid the rope
from twisting when running into the Ascender.
Caution
DO NOT let the rope become obstructed
or blocked when entering the Ascender.
PLEASE NOTE: This document is a guide and must only be used as an addition to the user manual and the battery safety and handling guidelines.
Double load
Recommendation
Lifting operations are ideally performed with a 3 person team.
A lifting supervisor, a slinger for attaching loads and an
Ascenderoperator.