6 Electrical connection.................................................................
6.1 Connection port description.....................................................................
6.2 Connecting additional grounding.............................................................
6.3 Grid cable connection..............................................................................
6.3.1 Requirements for the grid connection...........................................
6.3.2 Assembling the grid connectors....................................................
6.3.3 Connecting the grid connectors....................................................
6.4 Backup Load cable connection................................................................
6.4.1 Requirements for the Backup Load connection..............................
6.4.2 Assembling the Backup Load connectors......................................
6.4.3 Connecting the Back Load connectors..........................................
6.5 DC connection.........................................................................................
6.5.1 Requirements for the DC connection.............................................
6.5.2 Assembling the DC connectors......................................................
6.5.3 Connecting the PV array................................................................
6.6 Battery connection...................................................................................
6.7 Ai-Dongle connection..............................................................................
6.8 Communication equipment connection..................................................
6.8.1 Communication interface description............................................
6.8.2 Communication cable connection.................................................
6.8.3 Current Transformer connection...................................................
6.8.4 Smart meter connection................................................................
7 Commissioning...........................................................................
7.1 Inspection before commissioning.............................................................
7.2 Commissioning procedure........................................................................
8 Solplanet app.............................................................................
8.1 Brief introduction......................................................................................
8.2 Download and install................................................................................
8.3 Create an account....................................................................................
8.4 Create a plant...........................................................................................
8.5 Setting parameters...................................................................................
8.5.1 Inverter configuration.....................................................................
8.5.2 Grid code settings..........................................................................
8.5.3 Active power reduction at overfrequency P(f)...............................
32
32
33
34
34
36
38
39
39
39
41
42
42
42
47
50
51
54
54
56
58
59
60
60
61
62
62
62
62
64
71
71
72
73