WARNING:
• This product must be disconnected from the circuit if subjected to any high voltage or
insulaon resistance tesng. Irreparable damage will occur if this instrucon is not
followed
• Recommended roune test procedure in accordance with BS5266
• Daily check – check that the status GREEN LED indicator is illuminated
• Monthly funconal test – simulate a mains supply failure for approx. 30 secs by
operaon of key switch or switching off a circuit breaker. Ensure normal supply is
restored aer test and the indicator status LED is illuminated
• Twice yearly conduct a one hour duraon test - simulate a mains supply failure for one
hour connuous test by operaon of key switch or switching off circuit breaker. Ensure
normal supply is restored aer test and the indicator status LED is illuminated
• Annual full three hour duraon test - conduct a three hour connuous duraon test.
Simulate a mains supply failure for three hour connuous test by operaon of key switch
or switching off circuit breaker. Ensure normal supply is restored aer test and the
indicator status LED is illuminated
• If the luminaire fails any of the above tests, please contact a qualified electrician.
Fig 3
Neutral (blue)