Contents
Chapter 1 Introduction ................................................................................................................................................. 1
1.1 Model Information.......................................................................................................................................... 1
1.2 Overview....................................................................................................................................................... 2
1.3 Components.................................................................................................................................................. 4
1.3.1 Rectifier.............................................................................................................................................. 4
1.3.2 Controller............................................................................................................................................ 5
1.3.3 AC Distribution Cabinet....................................................................................................................... 6
1.3.4 DC Distribution Cabinet......................................................................................................................10
1.3.5 Rectifier Cabinet ................................................................................................................................15
Chapter 2 Installation Preparation ...............................................................................................................................18
2.1 Installation Requirements..............................................................................................................................18
2.1.1 Environmental Requirements..............................................................................................................18
2.1.2 Layout Requirements Of The Equipment Room...................................................................................18
2.1.3 Power Supply.....................................................................................................................................20
2.1.4 Safety Protection................................................................................................................................20
2.1.5 Equipment Running Environment Checklist.........................................................................................21
2.2 Storage Conditions .......................................................................................................................................22
2.3 Installation Preparation..................................................................................................................................22
2.3.1 Field Check........................................................................................................................................22
2.3.2 Tools And Materials Preparation.........................................................................................................22
2.4 Unpacking Inspection....................................................................................................................................24
Chapter 3 Installation..................................................................................................................................................26
3.1 Installing Cabinet..........................................................................................................................................26
3.1.1 Installation On The Floor ....................................................................................................................26
3.1.2 Installation On Supporting Rack..........................................................................................................27
3.1.3 Parallel Connection Between Cabinets ...............................................................................................28
3.1.4 Parallel Connection With Copper Bars................................................................................................29
3.1.5 Installation Of System Above 2000A...................................................................................................30
3.1.6 Mounting Large Side Door And Small Side Door.................................................................................30
3.1.7 Placing DC Cabinet Separate From System........................................................................................31
3.2 Connecting Power Cables.............................................................................................................................31
3.2.1 Connecting Earth Cable .....................................................................................................................32
3.2.2 Connecting Cables Between Rectifier Cabinet And AC Distribution Cabinet.........................................33
3.2.3 Connecting AC Input Cables...............................................................................................................35
3.2.4 Connecting Emergency Lighting Cables (Optional)..............................................................................36
3.2.5 Connecting DC Load Cables ..............................................................................................................37
3.2.6 Connecting Battery Cables.................................................................................................................39