manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. ADTRAN
  6. •
  7. Control Unit
  8. •
  9. ADTRAN Total Access 300 Series User manual

ADTRAN Total Access 300 Series User manual

Other manuals for Total Access 300 Series

11

This manual suits for next models

9

Other ADTRAN Control Unit manuals

ADTRAN OC-48/STM-16 DWDM SFP User manual

ADTRAN

ADTRAN OC-48/STM-16 DWDM SFP User manual

ADTRAN SFP GPON ONU User manual

ADTRAN

ADTRAN SFP GPON ONU User manual

ADTRAN T200 H2TU-R User manual

ADTRAN

ADTRAN T200 H2TU-R User manual

ADTRAN IMUX-56 User manual

ADTRAN

ADTRAN IMUX-56 User manual

ADTRAN SFP User manual

ADTRAN

ADTRAN SFP User manual

ADTRAN SFP User manual

ADTRAN

ADTRAN SFP User manual

ADTRAN Job Aid+ 1442704PG2 User manual

ADTRAN

ADTRAN Job Aid+ 1442704PG2 User manual

ADTRAN Job Aid+ Total Access 5000 1442910G1C User manual

ADTRAN

ADTRAN Job Aid+ Total Access 5000 1442910G1C User manual

ADTRAN MX2820 SCU User manual

ADTRAN

ADTRAN MX2820 SCU User manual

ADTRAN 1200065L1-1 User manual

ADTRAN

ADTRAN 1200065L1-1 User manual

ADTRAN Job Aid+ 1442804G1 User manual

ADTRAN

ADTRAN Job Aid+ 1442804G1 User manual

ADTRAN SFP User manual

ADTRAN

ADTRAN SFP User manual

ADTRAN GPON D OLT User manual

ADTRAN

ADTRAN GPON D OLT User manual

ADTRAN Octal BRI S/T User manual

ADTRAN

ADTRAN Octal BRI S/T User manual

ADTRAN Job Aid+ 1442707G3 User manual

ADTRAN

ADTRAN Job Aid+ 1442707G3 User manual

ADTRAN ATLAS 800 Series Module QUAD E1 User manual

ADTRAN

ADTRAN ATLAS 800 Series Module QUAD E1 User manual

ADTRAN Job Aid+ 1442940G1 User manual

ADTRAN

ADTRAN Job Aid+ 1442940G1 User manual

ADTRAN T400 Maintenance and service guide

ADTRAN

ADTRAN T400 Maintenance and service guide

ADTRAN E1 User manual

ADTRAN

ADTRAN E1 User manual

ADTRAN 1200222L1 User manual

ADTRAN

ADTRAN 1200222L1 User manual

ADTRAN Total Access 300 Series User manual

ADTRAN

ADTRAN Total Access 300 Series User manual

ADTRAN 1200068L1 HS Series User manual

ADTRAN

ADTRAN 1200068L1 HS Series User manual

ADTRAN 1200261L1 User manual

ADTRAN

ADTRAN 1200261L1 User manual

ADTRAN Octal BRI/U User manual

ADTRAN

ADTRAN Octal BRI/U User manual

Popular Control Unit manuals by other brands

Seitz 14A80 user manual

Seitz

Seitz 14A80 user manual

Wilo RS485 Installation and operating instructions

Wilo

Wilo RS485 Installation and operating instructions

Becker CentralControl CC41 Commissioning Instruction

Becker

Becker CentralControl CC41 Commissioning Instruction

SICK CDB650 operating instructions

SICK

SICK CDB650 operating instructions

Panduit NetKey NKP5E88M Series installation instructions

Panduit

Panduit NetKey NKP5E88M Series installation instructions

MX Options Concentric Petite Fitting instructions

MX

MX Options Concentric Petite Fitting instructions

Clean Water Systems Fleck 2510 Installation & start?up guide

Clean Water Systems

Clean Water Systems Fleck 2510 Installation & start?up guide

Fairchild FSB44104A user guide

Fairchild

Fairchild FSB44104A user guide

LEGRAND Wattstopper LMIN-104 installation instructions

LEGRAND

LEGRAND Wattstopper LMIN-104 installation instructions

PMK ATT10BNCS instruction manual

PMK

PMK ATT10BNCS instruction manual

Tektronix TDS3FFT user manual

Tektronix

Tektronix TDS3FFT user manual

Woodward easYgen Technical manual

Woodward

Woodward easYgen Technical manual

Balluff BNI EIP-502-105-R015 user guide

Balluff

Balluff BNI EIP-502-105-R015 user guide

NXP Semiconductors TWR-LS1021A Getting started

NXP Semiconductors

NXP Semiconductors TWR-LS1021A Getting started

Advantech PCM-3117 Startup manual

Advantech

Advantech PCM-3117 Startup manual

Danfoss MCO 101 manual

Danfoss

Danfoss MCO 101 manual

Moons' Lin Engineering R701P user manual

Moons'

Moons' Lin Engineering R701P user manual

Aventics RV1 operating instructions

Aventics

Aventics RV1 operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

1
DESCRIPTION
TheTotalAccess®361and362SingleFamilyUnit(SFU)OpticalNetwork
Terminations(ONTs)areGigabitPassiveOpticalNetwork(GPON)ONTs
withRFOverlay.TheTotalAccess361SFUONThas2POTS,and1
GigabitEthernetinterface.TheTotalAccess362has2POTS,and2Gigabit
Ethernetinterfaces.ThefigureaboveillustratestheSFUONTinner
enclosure.GPONtechnologyprovidesaconsistentandcommon
approachtoadvancingthepubliccommunicationsnetworkusing:
♦TraditionaltelephoneserviceisPlainOldTelephoneService(POTS)
♦Highspeeddataservices
♦Videoservices
TheGPONnetworkconsistsofanOpticalLineTerminal(OLT)locatedat
thecentralofficeandOpticalNetworkTerminals(ONTs)locatedatthe
customer’spremises.BetweenthemliestheOpticalDistributionNetwork
(ODN)consistingoffibersandpassivesplittersorcouplers.
Inordertoallowforthetransmissionofdownstreamandupstreamtraffic
ononesinglefiber,differentwavelengthsareusedforeachdirection.
Downstreamtrafficuses1490nm,whileupstreamtrafficiscarriedon
1310nm.ForoverlayRFTVdistribution,aseconddownstream
wavelengthof1550nmisused.
RF
Connection
RF Drop
Surface
Mounting
Hole
Surface Mounting
Hole
Hinge
Hinge
Security
Screw
Two-screw
Terminal
Bridges
Ethernet
Connections
Fiber Optic
Cable
Ground
Power
Ethernet Drop
POTS Drop
Ground and Power
Drop Callout
Ground Drop
Fiber Drop
RING
TIP
RING
TIP
FXS 0/1
FXS 0/2
ETH 0/1
ETH 0/2
POTS 1
POTS 2
ETH 1
ETH 2
TOTAL ACCESS 362 ONT
1187712G1
12V , 1A
CLEI
TIP RING
TEL. NUMBER
TIP RING
TIP RING
NETWORK STATUS
POTS 2
POTS 1
TELEPHONE TROUBLESHOOTING
1.Identify the bad line.
2.Disconnect the plug from the appropriate POTS jack and plug
any working telephone into that jack.
If the telephone works,there is a problem inside the house.
If the telephone does not work,contact your service provider.
3.Remove the telephone and replace the plug into the POTS jack.
4.Close the unit.
TIP RING
ETH 0/1
ETH 0/2
Total Access 300 Series
GigE SFU GPON ONTs
with RF Overlay
ThisJobAidcoverstheelectronicsmodules(SFUONT)andhousings
listedinthefollowingtable:
NOTE
TheTotalAccess361/362SFUONTsareonlyintendedtobeusedwiththe
CorningSystemsModelFNI‐NGseriesoutdoorNIDhousing.
FRONT PANEL LEDS
INSTALLATION
NOTE
RefertotheTot alAccess300GigESFUONTsInstallationGuide
(P/N6418771XGX‐5)forcompleteinformationoninstallingtheseunits.
AfterunpackingtheSFUONT,inspectitfordamage.Ifdamageisnoted,
fileaclaimwiththecarrierandthencontactADTRAN.Formoreinfor‐
mation,refertothewarranty.
Total Access 361 Description
1187711G1 TotalAccess361SFUElectronicsModule
4187711G12 TotalAccess361withSpliceHousing
4187711G13 TotalAccess361withOptiTapHousing
Total Access 362 Description
1187712G1 TotalAccess362SFUElectronicsModule
4187712G12 TotalAccess362withSpliceHousing
4187712G13 TotalAccess362withOptiTapHousing
Total Access SFU
Housings
Description
1187770G1 TotalAccessONTSpliceHousing
1187771G1 TotalAccessONTwithOptiTapHousing
Label Status Description
POWER {
z
Off
Green
Nopower
PowerisOn
NETWORK
STATUS
{
z
z
z
Off
Green
Yellow
Red
AdministrativelyShutDown
Normal
Testinprogress
FaultCondition
POTS
1 and 2
{
z
2
z
z
Off
Green
GreenFlashing
Yellow
Red
AdministrativelyShutDown
OffHook
Ringing
Testmode
Fault
ETH 1and 2 {
z
4
Off
Green
YellowFlashing
Linkisdown:noactivityor
AdministrativelyShutDown
10/100/1000Linkisup
TXorRXactivity
Product P/N: 418771XGX
Issue Date: March 2010
Document P/N: 6418771XGX-22B
26418771XGX-22B
MultiGroundedNeutral(MGN)ofthecustomerpremises.Ensure
thewireisfreeofanysharpbends.
5. Attachthegroundwiretothesideofthesubscriber’spremiseswith
stainlesssteelhalfmoonclampsortie‐wrapthegroundwiretothe
riserconduitoftheBuriedFiberDrop.
6. CleantheMGNconnectorwithemeryclothtoinsureastable
connection.
7. AttachthegroundwirefromtheSFUONTtotheMGNconnector
withtheappropriateULapprovedgroundclamp/fitting.
8. Coattheconnectionwithametalcorrosionpreventative.
9. AttachaWarningGroundTagtothisgroundingconnection.
Power/Alarm Connections
NOTE
WiringthePower/AlarmconnectorimproperlycoulddamagetheSFU.
TheSFUONTissuppliedwitha7‐conductorEuro‐stylePower/Alarm
connector.TomakeconnectionsfromtheUPStothepowerconnector
completethefollowingsteps:
1. RemovetheEuro‐Connectorbypullingitoutoftheelectronics
module.
2. Refertotheillustrationonthenextpageand“LocalPowerSource
Wiring”sectiontoassistincompletingthenextsteps.
3. Removetherubbergrommetfromthehousingandinsertthewire
throughthegrommet.
4. ToterminatethetwoUPSpowerleads(Pins6and7)and,ifneeded,
thefivealarmstatusleadsinthepowerconnector,cutallwiresand
stripbacktheinsulation.Useaflatheadscrewdriver(orsimilar
device)andloosenallthescrewsonthePowerAlarmConnector.
Insertonewireatatimeandtightenthescrewstomakeanelectrical
contact.
5. ReconnecttheEuro‐ConnectortothebottomoftheElectronics
Module.
6. TieWrapthewiresthroughtheholesjustbelowtheEuro‐style
connector.
7. ReplacetherubbergrommetwhileclosingtheElectronicsModule.
ThisplaceslessstressonthewiringandallowstheElectronics
Moduletoclosewithoutpinchinganywiring.
123
+ 12VDC
12V RTN
SIG RTN
ON BAT
REP BAT
BATMIS
LOW BAT
7654321
+ 12VDC
12V RTN
SIG RTN
ON BAT
REP BAT
BAT MIS
LOW BAT
765432
1
Euro-Connecto
r
Back of Electronics Module
Required Tools and Supplies
Standardtechniciantoolsandthoselistedbelowarerequiredfor
installingtheSFUONT:
♦Carpenter’slevel
♦3/32”screwdriverforconnectingSFUONTpower
♦5/32”hextamperproofbit
♦RJ‐45/RJ‐11crimper
♦Atelephony/datacommunicationtestset
♦PONpowermeterwithwavelengthfiltering
♦Fiberscopeorvideoscope
♦Two#10screwsandappropriatesurfaceanchorsformountingthe
SFUONT
♦Assortedtiewrapsforsecuringcablingandwiring
♦TwoRJ‐45plugs
♦TwoRJ‐11plugs(whennotusingtwo‐screwterminalbridges)
Forfiberopticconnections,thefollowingarerequired:
♦Fibersplicingtools
♦Fibercleaningmaterials
♦SC/APCfiberconnector
IncludedwiththeSFUONTpackagingare2two‐screwterminalbridges,
fibercablemanagementandstrainrelief,afiberconnector,and
electronics/optics.Fordata,theconnectiontotheSFUisthroughtheR‐J45
Ethernetconnectors.ForPOTS,theconnectionismadethroughtwo‐
screwterminalbridges,orRJ‐11connections.ForRFTVdistribution,the
connectionismadethroughacoaxialRFconnector.
Mount the Enclosure
Completethefollowingstepstomounttheenclosure:
1. Chooseaverticalsurfacenearanapprovedground,butawayfrom
downspouts,permanentwatersprinklers,orotherwatersources.
Thesubscribershouldhaveeasyaccessfortesting.
2. Usethetopandbottomexternalmountingholesasatemplateto
markfastenerlocations.Usealeveltoensuretheunitislevelto
preventwarping.
3. Pre‐drillthemarkedlocationsandinstallfastenersoranchors
appropriatetothemountingsurface(eachanchorratedto15lbs
minimum).
4. MounttheSFUONTtothesideofthesubscriber’spremise.
TheElectronicsModuleisinstalledinthehousingandswingsopenon
hinges.Toreleasethismodule,loosentheSecurityScrew(refertothe
illustrationonthefirstpage)andswingtheelectronicsModuletotheleft.
CAUTION
!
Donotuseaknifetocuttheopeningintherubbergrommets.Thismay
resultinanexcessivelylargeholeandcompromisetheintegrityofthe
unitallowingmoistureintotheunit.
Ground Connection
Installthegroundconnection(seeillustrationaboveright)bycompleting
thefollowingsteps:
1. Removetherubbergrommetfromthehousingandinserta#6solid
coppergroundwirethroughtherubbergrommet.
2. Usingthefigureontheoppositecolumn,routethegroundwireas
shownandattachittothegroundbar.
3. Replacetherubbergrommetbackinthehousing.
4. Routethegroundwire12inchesbelowfinishedgradebythe
shortestandmostdirectroutetotheACpowergroundsystem
6418771XGX-22B 3
Route OptiTap Fiber Drop Cable
Refertotheillustrationonthefollowingpageforfiberinstallations:
1. PlacetheOptiTapfiberdropinthesamerubbergrommetchannel
asthegroundcable.Thegroundcableshouldbe“below”theOpti‐
Tapfiber.
2. ConnecttheOptiTapfiber.
3. PlacetheOptiTapconnectorinthecut‐outinthehousing.
4. Connectthefibercabletotheconnectoronthebottomofthe
ElectronicsModule.
5. RoutethecablesothatwhentheElectronicsModuleisclosed,the
fiberisnotpinched.
NOTE
TherearewireroutingclipsonthelowerrightoftheElectronicsModule
housing.Itisrecommendedthatthesenotbeused.Routethepowerwires
sothattheyarenotpinchedwhentheElectronicsModuleisclosed.
Install SC/APC Optical Connection
NOTE
RefertotheTotalAccess300GigESFUONTsInstallationGuide
(P/N6418771XGX‐5)forinformationoninstallingtheSC/APCoptical
connection.
Toinstalltheopticalconnector,completethefollowing:
1. Withtheelectronicsmoduleswungopen,routethefiberthrough
themostdirectgrommetentranceandconnectittotheappropriate
SC/APCopticalconnection.
2. Checkthattherearenobendsinthefiberlessthan30mm(1.2
inches)radiusor60mm(approximately2.5inches)indiameter.
Whenthemaintenancedoorisclosed,itshouldnotcomeincontact
withthefiber.
Local Power Source Wiring
TheSFUONTneedstobepoweredbyaULListedPowerSupplysuitable
fortheapplicationwithOutputatLPSLevels.
ThisSFUONTshouldonlybeoperatedfromthetypeofcertified/listed
powersupplyrecommendedbythepowersupplymanufacturer.
Note: Do not tie wrap
the optical cable.
Route it as shown.
Ground Drop
Rubber Grommet
Tie Wrap
Opti-Tap Connector
+12VDC
12VRTN
SIGRTN
ONBAT
REPBAT
BATMIS
LOWBAT
765432
1
UsethePin‐Outinformationinthetablebelowasneeded.
Install UPS
InstallationoftheUninterruptiblePowerSource(UPS,P/N1187730G1)
willbedictatedbyon‐siteconditionsandlocaltelephonecompany
practices.
CAUTION
!
Usecautionwhenroutingwiresandcables.Avoidseverebendingand
routingoversharpedges.Usegrommetswhenpossibletoavoidwearon
cableinsulation.
1. InstalltheUPScablethatrunsfromtheSFUONTtothePower/
AlarmconnectoroftheUPSviathecustomerprovidedPVCcon‐
duit(ormethodusedbyyourlocaltelephonecompanypractice).
2. Swingtheelectronicsmoduleclosedandtightenthesecurityscrew
withthe5/32Hextamperproofbit.
3. Ifnecessary,tiewrapboththe#6groundwireandtheUPScable
runtotheBuriedFiberDropriserconduit.
POTS Connection
ThetelephoneserviceorPOTSconnectionscanbemadewitheithertwo‐
screwterminalbridges,orRJ‐11connectors.
Ifthetwo‐screwterminalbridgesareusedtheRJ‐11jacksprovidea
diagnostictestpoint.InsertinganRJ‐11jack(i.e.,telephonecableor
telephonetestset)willconnectthetelephonesettotheSFUONTandalso
disconnectthesubscriberservicefromtheSFUONTprovidingfault
isolationtotheSFUorpremiseswiring.
ToterminatethePOTSlinesonthetwo‐screwterminalbridgescomplete
thefollowing:
1. Trimeachwiretolengthandstripinsulation.Identifyeachpairin
theservicecable.
2. LoosenthescrewsfromtheTIP(green)andRING(red).
3. Wraptheappropriatewirearoundtheappropriatescrewand
tightenthescrewstosecuretheconnections.
POTScanalsobeconnecteddirectlytotheRJ‐11jack.Inthiscasethetwo‐
screwterminalbridgesbecomeisolatedandarenotused.
Pin-Out
Power/Alarm
Description Pin-Out
UPS
1LOWBAT 1
2BATMIS 2
3REPBAT 3
4ONBAT 4
5 SIGRTN 5
612VRTN 6
7+12VDC7
Pin 1
Pin 7
1
2
3
4
5
6
7
UPS Power
Connector
Power/Alarm
Connector
Low Battery
Battery Missing
Replace Battery
On Battery
Signal Return
12V Return
+12VDC
(Note: Refer to the sticker on the bottom
of the Power/Alarm Connector if needed)
For more information, refer to the Installation and Maintenance Practice (P/N 6418771XGX-5)
available online at www.adtran.com.
Warranty:ADTRAN will replace or repair this product within the warranty period if it does not
meet its published specifications or fails while in service. Warranty information can
be found online at www.adtran.com/warranty.
©2010 ADTRAN, Inc. All Rights Reserved. *6418771XGX-22B*
RF Connection
RoutetheRFcablethroughthelargegrommetatthebottomofthe
enclosureandattachittotheRFconnectorlocatedonbottomthe
electronicsModule.
Ethernet Connection
IftheONTisgoingtosupportupto1Gigabitoperation(10/100/1000),the
cableusedshouldberatedCAT‐6.Stripbackthejacketofthesubscriber
Ethernetcableandconnectthe4‐pairtwistedwirestotheRJ‐45Plug
usinganRJ‐45crimper.InserttheterminatedRJ‐45jackintotheappro‐
priateRJ‐45ETH socketontheSFUONT.ThetablebelowliststheEthernet
Connectionsandrelatedservices.

OPERATIONAL SPECIFICATIONS
♦OperationalTemperatureRange:–40°Cto+65°C
♦VoltageRange:10.5to15VDC
♦MaximumCurrent:1.5Amps
♦StorageTemperatureRange:–40°Cto+85°C
♦RelativeHumidity:95%,noncondensing
♦Dimensions:9.7”Wx12”Hx4”D
♦Weight:3lbs0.8oz(enclosureandelectronicsmodule)
♦OperatingAltitudeRange:–197feet(–60meters)to13000feet(3962
meters).Theoperatingambienttemperatureisderated1°C/1000feet
(3.3°C/km).
MAINTENANCE
TheSFUONTdoesnotrequireroutinehardwaremaintenancefornormal
operation.ADTRANdoesnotrecommendthatrepairsbeattemptedin
thefield.Repairservicesmaybeobtainedbyreturningthedefectiveunit
toADTRAN.Refertothewarrantyforfurtherinformation.Fieldsupport
forsoftwareisprovidedthroughupgradefacilities.
COMPLIANCE
TheTotalAccess300SeriesSFUONTsareNRTLListedtotheapplicable
ULsafetystandards.TheTotalAccess300SeriesSFUONTsmeetor
exceedalltheapplicablerequirementsofNEBS,andTelcordiaGR‐63‐
CORE.
TheTotalAccess300SeriesSFUONTsareintendedfordeploymentinthe
OutsidePlant(OSP)atlocationswheretheNECapplies(forexample,
CustomerPremises)andisintendedtobeinstalledbytrainedservice
personnel.ConfigurationCodesfortheSFUONTarelistedbelow.
Part Number Description Operation
1187711G1 ETH1Dataand/orVideo
1187712G1 ETH1
ETH2
Dataand/orVideo
Dataand/orVideo
Configuration Codes Input Output
PowerCode(PC) F C
TelecommunicationCode(TC) – –
InstallationCode(IC) A –
ThisdevicecomplieswithPart15oftheFCCrules.Operationissubjectto
thefollowingtwoconditions:
1. Thisdevicemaynotcauseharmfulinterference.
2. Thisdevicemustacceptanyinterferencereceived,including
interferencethatmaycauseundesiredoperation.
ChangesormodificationsnotexpresslyapprovedbyADTRANcould
voidtheuser’sauthoritytooperatethisequipment.
WARNING
!
The10/100/1000Base‐Tport(s)andPOTSareclassifiedasType4as
definedinAppendixBofGR‐1089‐COREIssue4,andaresuitablefor
connectiontointra‐buildingorunexposedwiringorcablingonly.Donot
metallicallyconnecttheseportstointerfaceswhichconnecttotheOutside
Plant(OSP)ortotheOSPwiring.The10/100/1000Base‐TportsandPOTS
aredesignedforuseasanintra‐buildinginterfaceonly(Type4portsas
describedinGR‐1089‐COREIssue4)andrequireisolationfromexposed
OSPcabling.TheadditionofPrimaryProtectorsisnotsufficient
protectioninordertoconnectthisinterfacemetallicallytoOSPwiring.
CAUTION
C
TheTotalAccess300SeriesSFUONTscontainaClass1LaserModule
whichcomplieswith21CFR1040.10and1040.11.
♦ ElectrostaticDischarge(ESD)candamageelectronicmodules.When
handlingmodules,wearanantistaticdischargewriststraptoprevent
damagetoelectroniccomponents.Placemodulesinantistaticpacking
materialwhentransportingorstoring.Whenworkingonmodules,
alwaysplacethemonanapprovedantistaticmatthatiselectrically
grounded.
♦ Thisequipmentmustbeconnectedtoaknown,reliableearthground
atalltimesduringinstallationandservice.RefertotheNational
ElectricalCode(NEC)andstate/localcodesfordetailsongrounding
requirements.A6AWGcoppergroundconductorshallbeusedto
connecttheequipmenttoearthground.
♦ PerGR‐1089‐COREtheTotalAccess300SeriesSFUONTsaredesigned
andintendedforinstallationaspartofaCommonBondingNetwork
(CBN).TheTotalAccess300SeriesSFUONTarenotdesignednor
intendedforinstallationaspartofanIsolatedBondingNetwork
(IBN).
♦ PerGR‐1089‐CORESection9,theSFUONTsdonothaveaninternal
DCconnectionbetween12Vandframeground.
♦ TheTotalAccess300SeriesSFUONTsChassisframegroundterminal
mustbeconnectedtoanearthgroundtoensuretheONTSFUis
properlygrounded.
NOTE
♦ Powersupplyinputandoutputconductorsofequipmentwhichare
outsideofthebuilding,areintendedtobelessthat140feetandhave
adequateclearancefrompowerandlightningconductorsin
accordancewithNEC725and800.FinalacceptanceoftheListed
equipmentinstallationwillultimatelybeuptothelocalAuthority
HavingJurisdiction(AHJ).
♦ Themainfeedisopticalandthereforenotclassifiedasanytypeofport
asdefinedinAppendixBofGR‐1089‐COREIssue4.
♦ TheTotalAccess300SeriesSFUONTsaredesignedtooperatewith
nominaloperatingvoltageof12VDCandaminimumoperating
voltageof10.5VDC.TheTotalAccess361and362willnotbe
damagedbyanysteadystatevoltagebetween10.5VDCand15.0VDC
inmagnitude.
C A U T I O N
C A U T I O N
!
SUBJECT TO ELECTROSTATIC DAMAGE
OR DECREASE IN RELIABILITY.
HANDLING PRECAUTIONS REQUIRED.
ADTRAN CUSTOMER CARE:
From within the U.S. 1.800.726.8663
From outside the U.S. +1 256.963.8716
PRICING AND AVAILABILITY 1.800.827.0807