
CLEVELAND RANGE
SEQUENCE OF OPERATIONS
Gas Boiler Base
1. To turn the unit on, depress the red on/off rocker switch.
x115 VAC is sent to the terminal block in control box.
x115 VAC is sent to normally open blowdown valve closing it.
x115 VAC is sent to L1 and L2 of the water level board.
2. With the water level board energized and no water in the boiler
x115 VAC is sent from the IND terminal to the low water indicator light.
x115 VAC is sent from the WF terminal to the fill solenoid.
xThe fill solenoid opens and the boiler fills.
xThe water fills to the low probe shorting it to ground
x115 VAC is removed from the IND terminal and the low water indicator light is
de-energized.
x115 VAC is sent from the HTR terminal through the normally closed contact of
the high-pressure switch to the amber reset switch,
x115 VAC is sent through the normally closed R1B contact to energize the amber
light.
xIf the low probe is not grounded for 20 seconds, 115 VAC is removed from
HTR and sent back to IND energizing the low water indicator light.
3. When the momentary amber switch is depressed 115 VAC is sent to the R1 relay closing it.
xThe normally closed R1B contacts open de-energizing the amber light.
xThe relay latches itself through contacts 3 and 5 with a jumper to the coil.
xIf either the high-pressure switch opens or the low probe circuit on the water level
board opens, then the latch circuit opens.
xWhen the water level or pressure returns to a safe condition the amber light will
energize and the process may begin again.
xThe R1B relay contacts close sending 115 VAC through the normally closed operating
pressure switch to the 24 VAC transformer.
x24 VAC is sent to the ignition module.
4. With 24 VAC to the ignition module 24 VAC is sent to the gas valve.
xThe gas valve is energized.
xThe gas valve opens to the initial stage and sends gas to the burner.
xThe initial stage for a 200,000 BTU boiler base natural gas is 1.25” W.C.
xThe initial stage for a 300,000 BTU Boiler base natural gas is .75” W.C.
xThe inital stage for L.P. boiler base is 2.5” W.C.
xA spark is generated at the igniter.
xThe gas is ignited and the flame rectifies the AC current.
xThe ignition module reads 1.5 micro amps DC current through the ground wire.