
PRODUCT INFORMATION
Dear customer,
Thank you for buying a high-quality aluminium greenhouse.
REMARKS
The drawings in these instructions are for all basic models.
However, this manual should be sufficient to guide you
through the assembly of all sizes and variations of this
greenhouse. This greenhouse is designed for cultivation of
plants/flowers. Therefore leakage, water drops and
condensation inside the building are allowed. The building
should only be entered by competent persons during
cultivation or maintenance. Aluminium profiles that are not
painted may show black stains, these stains are not a
production error: they can be easily removed with a
aluminium cleaner available at every good drugstore. The
rubber strips have been treated with oil/silicone on the
interior to facilitate the assembly. The greenhouse can be
mounted on a solid concrete foundation or on a solid packed
surface with concrete anchors in the corners. The solid
concrete foundation should be deep enough to get a solid
and frost-free ground. The greenhouse should be anchored
securely and the anchors should be checked periodically.
During winter it is necessary to clear the roof of snow or
support it in a suitable way. The greenhouse should be built
in a location protected from strong winds. Protective gear
(such as protective gloves) should be used during assembly
in order to avoid injuries. One should pay attention at all
times and consult the local building regulations.
ASSEMBLY ORDER
The assembly procedure is the same for all our
greenhouses.
- Sort the profiles according the model.
- Assemble the complete aluminium framework.
- Level the framed greenhouse using a waterlevel.
- Securethe building to the ground
- Install glass/glazing panels.
REQUIRED TOOLS
10mm Socket Wrench
10mm Spanner Wrench
Water-level
Phillips screwdriver
Powered Drill + 4.2mm or 11/64ths Drill Bit Scissors (to cut
the rubber).
We reserve the right to change the construction without
prior notice!