Hella BM03 Setup guide

Installation Instructions and Instructions for Use
These instructions must be read
prior to installation
and use!
Recess awning BM03 cable guided
Operating guidelines
Installation Instructions and Instructions for Use
Table of Contents
Preliminary remarks HELLA Recess awning BM03 cable guided ........................................3
General notes.......................................................................................................................4
CE marking...........................................................................................................................5
Safety instructions ................................................................................................................6
Designated use ....................................................................................................................8
Servicing, maintenance and repair .......................................................................................9
Operating guidelines ..........................................................................................................12
Before installation...............................................................................................................14
Overview Recess awning BM03 cable guided....................................................................15
Providing the cable ducts for the drive system ...................................................................16
Installation tensioning brackets ..........................................................................................17
Placing the roller tube.........................................................................................................18
Installation of the cable guiding ..........................................................................................19
Installation linked units .......................................................................................................22
Activation guidelines for electric drives...............................................................................25
Connection directives for motor drive .................................................................................26
Commissioning/functional check ........................................................................................30
Removal .............................................................................................................................31
Handing over report (for the fitter) ......................................................................................32
Handing over report (for the user) ......................................................................................33
Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
3
Preliminary remarks HELLA
Recess awning BM03 cable guided
With this HELLA product you have opted for a high-quality product with a most up-to-date
technology that can nevertheless be easily installed and operated. In these instructions we
describe the basic installation, commissioning and use.
For authorized specialist staff
For the consumer (user)
The following symbols will assist you with the installation or use and require a safety-
conscious conduct:
Attention!
This symbol indicates instructions that, if disregarded, can put the user in
danger.
Attention!
This symbol indicates instructions that, if disregarded, can potentially
result in damage to the product.
This symbol indicates instructions for use or helpful information.
This symbol requires you to act.
Attention!
This symbol indicates a risk of injury or danger to life due to an electric
shock.
This symbol indicates parts of the product, for which you will find
important information in these installation instructions.
Installation Instructions and Instructions for Use
4
Subject to technical modifications –Date of Issue March/2022
General notes
Questions
In case of questions concerning the installation or the use of your product, please
consult your authorized specialist shop.
Spare parts/repairs
Spare parts are available at your HELLA specialist shop. Only spare parts that are
approved by HELLA are allowed to be used.
Liability
In case of non-observance of the directions and information given in these instructions
and in case of improper operation or unintended use, the manufacturer shall not accept
any warranty claims concerning any damage to the product. In these cases, the liability
for consequential damage to any parts or persons is ruled out as well.
Legal notes
The graphs and texts of these instructions were carefully prepared. We cannot be held
liable for any errors and their potential consequences! Subject to technical modifications
to the product and to these instructions! These instructions include copyrighted
information. All rights reserved! The listed product or brand names are trademarks of the
respective owners.

Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
5
CE marking
The HELLA recess awning BM03 (cable guided) is in compliance with the declaration of
performance according to the Construction Products Regulation; if the unit is operated with
a motor drive it is additionally in compliance with the Machinery Directive and the Guideline
for Electromagnetic Compatibility; in case of proper use, the awning corresponds to the
basic requirements of the harmonised standard EN 13561. The respective declarations are
deposited with the manufacturers.
*)... A class 0 wind protection per EN 13561 is indicated, because the standard test
procedure does not allow a conclusion to be drawn about the wind resistance with real
wind load. Depending on the design and the type of installation, the vertical awnings are
suitable up to the maximum wind limit values recommended –see chapter "Designated
use".
The CE identification applies for the delivery status of the product. The product mounted
meets the requirements of the specified standard only, if
during installation the information and instructions given in these instructions as
well as the information and instructions of the manufacturers of the screws have
been observed,
the product is installed with the recommended type and number of
fasteners/screws.
No changes, rebuildings or extensions, with the exception of those described in these
instructions, are allowed with this product. The fixed CE-label expires with any change,
rebuilding or extension.
HELLA Sonnen- und Wetterschutztechnik GmbH
A-9913 Abfaltersbach 125
22
LE-SAMA-01-001
EN 13561:2004+A1:2008
Recess awning
BM03
Exterior textile sun protection
Wind resistance class 0*
Installation Instructions and Instructions for Use
6
Subject to technical modifications –Date of Issue March/2022
Safety instructions
These installation instructions refer to prefabricated elements, that (1) for
100% are made from parts, which are defined by us, and (2) which are
made in manufacturing processes, which are defined by us too; in all other
cases we do not provide any guarantee!
The safety instructions as well as the appropriate instructions must be
read carefully before installation and use. In case of non-observance of
the directions and information given in these instructions and in case of
improper installation and operation or unintended use, the manufacturer
shall not accept any warranty claims concerning any damage to the
product. In these cases, the liability for consequential damage to any parts
or persons is ruled out as well.
- Follow the described installation steps and pay attention to
recommendations and notes.
-Keep these instructions in a safe place.
- All installation and removal works, as well as maintenance and repair
works are only allowed to be carried out by authorised and qualified
specialist staff.
- If switching, automatic or radio control devices are used to operate the
units, the information given in the enclosed instructions of the
manufacturer must be observed.
-During operation do not put your hand into or touch movable parts.
-Ensure that clothing or body parts cannot get caught on the unit.
- Observe the regulations for prevention of accidents of the employer's
liability insurance association!
-Before operation check the unit for visible damage. If the unit is
damaged, it should not be used; please consult authorized specialist
staff immediately.
-Risk of injury and accident due to the weight of the product!
-Take safety measures against the danger of squashing, especially
when operating the unit with automatic devices.
-Place the operating switch within sight of the unit, but not near any of
the moving parts.
- Never let children play with the unit.
A sun protection device with electric drive cannot be retracted without
current. We therefore recommend the use of an emergency power
generating unit or a motor with an emergency crank handle, especially in
regions with frequent power failures.
Danger of suffocation!
Ensure that the foil cannot get into the hands of children. Keep the foil in a
safe place.
Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
7
Safety instructions
Attention! Risk of injury or danger to life due to an electric shock!
-Set-up, examination, commissioning and error correction of the unit
must only be performed by authorised or trained expert staff (as per
VDE 0100).
- Switch off the current to the connecting lines when working at the unit.
There is danger to life! Take safety precautions against unintentional
switching on!
-Check the electrical wires regularly for damage. Do not use the unit if
any damage is found.
- Our electrically driven units are in accordance with the regulations for
power plants acc. to VDE 0100. We cannot guarantee for the
operational reliability of the unit with non-approved modifications.
-The enclosed installation instructions of the electrical devices supplied
must be observed.
Units with motor drive:
The drives used are operated with a voltage of AC 230V/50Hz. Please
check the power supply provided by your utility company before
connecting. Any other voltage can destroy the drives.
The inclination of awnings with sloping projection units in the extended
position must be at least 14° to prevent water pockets when it is raining.
To prevent damage, please retract the system in case of rain when the
a
ngle of inclination is below this value.
With wind move the unit to the upper end position.
Winter operation:
Snow or ice can destroy the unit.
The unit may only be operated, if no ice or snow is lying on the cover.
During this time automatic control
devices must be switched to
manual operation.
Installation Instructions and Instructions for Use
8
Subject to technical modifications –Date of Issue March/2022
Designated use
Sun protection
Thermal protection
Sight screen
Anti-glare blind
Wind limit recommendations for HELLA vertical awnings
Design
Recess awning
[bft]
[m/s]
Cable/rod guiding directly (standard clearance) on façade
4-5
6-8
Cable/rod guiding on façade distance 30 - 100 cm
4
6
Cable/rod guiding on polygonal facade
4
6
Cable/rod guiding in the soffit
4-5
6-8

Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
9
Servicing, maintenance and repair
With the purchase of your awning you have opted for a high-quality product. To enjoy your awning for
as long as possible, please observe the following information:
Notes to awning covers made of brand acrylic fibres
Brand acrylic fibres, as used for awnings, are materials of the highest quality for awnings. As they are
dope-dyed, these materials show the highest light- and colour-fastness. In addition, their resistance to
tearing and resistance to weather, rotting and environmental effects is unsurpassed. Furthermore, a
special textile finishing makes them dirt-, water-, oil- and grease resistant. The awning cover is heavily
tested. At the weaving plant, at the awning manufacturer and during awning fabrication. As with other
covers, differences in the surface uniformity can also occur with the awning cover. When viewing from
the top or seeing through, you will perhaps find small knots, spots of colour, irregular runs of threads
or minimal differences and displacements in the design and rapport, as well as differences in the
colour. Please note, that the awning will cause a different colour effect in sunlight and in shade.
Naturally, the optical colour perception depends on the composition and the intensity of the emerging
light. With increasing depth of colour, more light will be absorbed and less will be reflected. Therefore
dark coloured covers let through a small amount of light, while light colours let a lot of light through.
Due to the part-absorption, the composition of the light shining through will be modified, which results
in other colour perceptions.
Due to the coloured pigments embedded in the cover and the impregnation, shadings caused
by crinkles or crumple folds can appear, that, especially with light colours, become visible as
strips of shade.
The function, strength or density of the cover will not be reduced by that. Minor differences in colours
between the different cover strips or differences in colours with regard to the collection of samples
cannot be ruled out. The fabrication of several strips also with varying widths depends on the overall
width of the awning.
Ripples in the cover and wrinkling at the seams can arise, because the cover is double rolled up at the
seams.
The highest strain is on the seams of the cover. When rolling up the cover, the seams and hems lie on
top of each other, intensifying the strain. Hems and seams will be pressed flat, increasing in length. As
a result, the lateral seams of the cover can hang down slightly.
Sagging as a result of the own weight of the cover is possible. These specified phenomenons are not
faults in the awning cover, which have been overseen in the testing; they are unavoidable due to
technical, material and physical regularities. They therefore do not entitle the customer to any refusal
or reduction of the purchase price.
Correspondingly, the guidelines for the assessment of ready-made awning covers, summarized by the
German Federal Association "Manufacture of technical textile registered association" (Bundesverband
Konfektion Technischer Textilien e. V.), are also an integral part of our conditions of sale and delivery.
Installation Instructions and Instructions for Use
10
Subject to technical modifications –Date of Issue March/2022
Servicing, maintenance and repair
Cleaning
Cleaning
As a sun protection device fixed outside, the unit can get dirty in the
course of time. This will not reduce the usability of your unit. The
powder-coated parts of your unit will remain presentable for longer, if
they are cleaned regularly with a soft woollen cloth.
Do not use solvents, alcohol (rubbing alcohol) or scouring cleansing
agents!
Leaves or other foreign material lying on the awning cover and in the
awning
cassette must be removed immediately. There is danger of
damage or crashing to the awning.
Preventive measures
If you have to draw in the cover in a wet condition, please draw it out for
drying when the next opportunity arises, to prevent marks
caused by
mould or mildew.
Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
11
Servicing, maintenance and repair
Maintenance
Maintenance
All inspection and maintenance works must be carried out by a
specialised company from HELLA or a HELLA partner. Regularly check
the electrical wires of motor driven units for damage. Check the
mechanical parts of your unit for visible damage. After exceptional
events such as storm, hail, sleet, maloperation or the like, the unit must
be checked for noticeable damage prior to operating it. If the unit is
damaged, it must not be used; consult authorized specialist staff
immediately. It is recommended to have the unit maintained by
specialist staff on an annual basis. This way wear is detected at an
early stage and damage to the unit is prevented.
Repair works
Repair:
Improper repair works may cause both risk of injury to persons or
damage to the units.
Repair works must be carried out by a HELLA specialist company or a
partner company of HELLA.
Only use original spare parts from HELLA.
Installation Instructions and Instructions for Use
12
Subject to technical modifications –Date of Issue March/2022
Operating guidelines
Legend
Crank handle hook
Crank rod
Eyelet
Crank handle drive:
Stick the crank handle hook
(1) together with the crank
rod (2) into the eyelet (3).
The awning is extended or
retracted by turning the crank
rod.
The prevailing direction of
rotation depends on the drive
side.
As a standard, the gear is not
limited by a stop when the
blind is lowered. When
lowering the blind, please
make sure, that the front rail
does not lie on the tensioning
elements or the end caps of
the guide rail.
Optionally a gear is available,
which is provided with an
override to limit the
extending. Here you hear a
click, when the end position
is reached.
Do not use force when
turning towards the upper
stop.
1
3
2

Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
13
Operating guidelines
Motor drive:
By activating a switch, a
remote control or an
automatic device, the roller
shutter moves “up" or "down”.
The blind stops by releasing
a pushbutton or pressing the
counter or stop button with a
latching switch.
The end positions of the drive
are not adjusted ex works.
Therefore it is necessary to
a
djust the end positions
during the installation on site.
Please observe the enclosed
instructions of the
manufacturer of the motor.
Please refer to the enclosed
instructions of the
manufacturer for operating
possibilities via control
devices.
Installation Instructions and Instructions for Use
14
Subject to technical modifications –Date of Issue March/2022
Before installation
Check the product immediately for possible shipping damage and for
compliance with the delivery receipt.
If parts are missing or damaged, please consult your supplier immediately.
Check the mounting base and ensure that the mounting material to be
used complies with the given conditions to guarantee proper installation. In
case of doubt, please seek advice from a specialist enterprise for fixing
techniques.
The packaging cardboard box should not be exposed to humidity. To
protect it from rain during transport, it should be covered by a foil.
Carry larger units by two persons. Transport and store the units carefully
to prevent injury of persons and damage to the product.
Remove the packaging material carefully. When using a knife, be careful
not to damage the packaging content and to avoid cuts!
Dispose of the packaging material via recycling.
Caution!
A wrong installation can
endanger the user seriously. Please strictly
observe the installation instructions. Close off the place of installation.
When working at higher heights, there is risk of falling. Suitable ascent
supports, scaffoldings and fall protection devices are to be used. Please
make sure that the ascent supports stand solidly and provide a firm grip.
Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
15
Overview Recess awning BM03 cable guided
Cable guiding
Legend
Mounting bracket
Front rail
PVC bearing
Front rail insert
Holder for pressure spring
Tensioning shoe
Cap for tubes
Weight
Roller tube
Pressure spring
Cable guiding
Tensioning bracket
Strainer clamp
1
2
3
4
56
7
8
9
10
11
12
13
Installation Instructions and Instructions for Use
16
Subject to technical modifications –Date of Issue March/2022
Providing the cable ducts for the drive system
The illustration opposite
shows an example regarding
the cable duct and the fixing
of a plug coupling.
Check the dimensions of the
element and wall opening,
and the
dimension of the
window respectively.
Measure the dimension of the
cable duct for the drive
system and provide the
appropriate wall or window
duct.
Please ensure that the cable
or the power connector
cannot get caught by the
cover or the roller tube.
Please observe the
guidelines of the VDE
regarding the sealing of cable
ducts! For wiring see chapter
Activation guidelines for
electric units as well as the
connection directives for
motor drives.
Legend
Wall
Hirschmann power connector
116
43
100
12

Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
17
Installation tensioning brackets
Horizontal installation
Fig.
1
Vertical installation
Fig. 2
Fig.
3
Legend
Complete height
Complete width = ordering width
Determine the positions of the
mounting brackets (measuring,
marking and drilling). Please pay
attention to the figures 1 to 2.
Figure 3 shows the positions of
the mounting brackets if the
awning is designed with square
guide rails and wire or rod
tensioning.
Please pay attention to the
mounting material when boring
the holes for the installation.
Position the borehole for the
installation in the long hole of the
mounting brackets in such a way,
that it is still possible to adjust the
mounting bracket, if required.
Please make sure that the drive
side or bearing side complies with
the specifications given in your
order!
100
1
110
1
2
25
25
Installation Instructions and Instructions for Use
18
Subject to technical modifications –Date of Issue March/2022
Placing the roller tube
Take the roller tube with the
rolled-up cover (1) or the
mounted front rail (2) and
attach it at the drive side first.
Then turn the roller tube
towards the bearing (3) and
press the bearing pin (4) from
the top into the bearing shell.
Legend
Cover
Front rail
Bearing
Bearing pin
Bearing side
Drive side
1
2
5
6
3
4
Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
19
Installation of the cable guiding
Cable guiding
Lower the blind for approx.
50 mm. Place the pressure
spring (2) with reducing bush
(1) into the holding device for
the pressure spring (3). Feed
the guide cable through until
the upper end of the cable
rests with the pressed
clamping shell on the
reducing bush. Ensure that it
is correctly seated. Pass the
guide cable through the front
rail insert (4) into the lower
tensioning option.
As shown opposite, install the
lower end of the wire to the
selected tensioning option (5-
8).
Legend
Reducing bush
Pressure spring
Holder for pressure spring
Front rail insert
Strainer clamp
Strainer clamp with threaded fitting
Tensioning shoe
Tensioning bracket
Detail presser spring holder
5
6
7
8
4
9
5
6
7
8
9
1
2
3
Installation Instructions and Instructions for Use
20
Subject to technical modifications –Date of Issue March/2022
Installation of the cable guiding
Fastening of the tensioning elements with strainer bolt
Legend pressure spring holder
Noise insulating board
Strainer clamp in centre –
SA1xMx
- Fix the tensioning element
in accordance with the
mounting base. Installation
with noise insulating
board, where required.
The tensioning cable must
be in an exact vertical
alignment.
- Insert the cable into the
tensioning element.
-Pre-tension the tensioning
cable using combination
pliers or long-nosed pliers.
- Preload spring by approx.
5 mm = 200 N
In doing so take care not to
damage the cable or the
tensioning element.
-Tighten the screw to
clamp the cable when it is
tensioned.
- Shorten the cable
3.
4.
5.
1.
2.
2
1

Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
21
Installation of the cable guiding
Cable guiding
Strictly observe the
dimensioning instructions.
Outer edge of the fixing
bracket up to the axle of the
wire. Fix the tensioning in an
exact vertical and parallel
position.
Legend
Complete height
Complete width
116
43
100
55
1
100
27
116
84
1
2
25 25
Installation Instructions and Instructions for Use
22
Subject to technical modifications –Date of Issue March/2022
Installation linked units
Legend
Mounting bracket
Shaft bearing
Linking bush
Roll cap + square bar
Fixing screw
Fix the mounting brackets as
described in the section
"Installation of the fixing
brackets". To fix the
mounting bracket, provide the
necessary boreholes at the
linking position and have the
fixing material ready to hand.
Take the roller tube with the
drive system and attach it at
the drive side first. At the
linking position move the
mounting bracket (1) together
with the pre
-
assembled shaft
bearings (2) over the linking
bush (3), which is placed
onto the square bar of the roll
cap (4). Then fasten the
mounting bracket.
Before fixing the roller tube of
the linked unit, it is necessary
to loosen the mounting
bracket at the bearing side
and to move it towards the
outside (via the long holes),
to enable an attaching of the
roller tube.
1
2
3
4
5
Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
23
Installation linked units
Cable guiding (2x strainer clamp)
Cable guiding (double tensioning bracket)
Cable guiding (2x tensioning shoe)
42
42
Installation Instructions and Instructions for Use
24
Subject to technical modifications –Date of Issue March/2022
Installation linked units
Legend
Complete width
Take the roller tube for the linked position and push the roll cap (4)
together with the square bar (4.1) into the linking bush (3). Then fix the
mounting bracket to the bearing side.
Make sure that the roller tubes have the same level.
Small differences in the height of the cover can be levelled out by turning
the roller tube of the linked unit.
For this purpose loosen the fixing screw (5) and turn the roller tube.
Tighten the fixing screw again after the adjustment. With installation in a
recess without required lateral space, it is necessary to assemble the
roller tube prior to the installation of the units. These are then held and
mounted to the mounting base together with the mounting brackets (at
least 3 persons required).
25 42 25
11
1
2
3
4
5

Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
25
Activation guidelines for electric drives
The motors we use are drives with integrated planetary gear, brakes, limit
stops at the top and at the bottom, and thermo cut
-
off switches, also not
only a motor, but a complete drive system.
In some respect, the drives do NOT correspond to other household
electrical consumers. Please strictly observe the following notes and
safety instructions.
The construction, checking, commissioning and error-correcting of the
electrical system are only allowed to be carried out by an electrician (acc.
to VDE 0100). In case of improper connection, considerable danger can
arise for the user.
-Follow the wiring diagram precisely!
-We cannot accept responsibility for damage, that can result from
improper installation.
-Never simultaneously activate the drives with an UPWARDS and a
DOWNWARDS signal!
-Keep a break of approx. 0.5 seconds between the UPWARDS and
the DOWNWARDS command (is often neglected with Instabus EIB-
systems).
Radio interference suppression
The drives are provided with a radio interference suppression according to
the current VDE standards and EC Guidelines. If the drives are operated
with other devices, that include interferences, it is the fitter's duty -as part
of the obligation to suppress interference - to ensure that the entire unit
complies with the current regulations.
Operation in wet spaces
The drives are "splash
-
proof"; if they are operated in wet spaces, the VDE-
guidelines, inter alia VDE 0100/Parts 701, 702, the guidelines of the local
electric supply companies and of the TÜV must be observed and fulfilled.
Both the instructions and notes given in these instructions, as well
as the instructions and notes given in the respective enclosed
instructions of the manufacturers of the drive systems must be
observed.
Installation Instructions and Instructions for Use
26
Subject to technical modifications –Date of Issue March/2022
Connection directives for motor drive
Activation of a drive
It must be ensured, that a
drive is provided with a
locking mechanism, so that
it can be activated in one
running direction only (see
adjacent illustration).
Otherwise, there is the risk
that enormous loads occur,
that the limit stops get
destroyed and that the
drive malfunctions.
This regulation does not
apply for radio
-
controlled
and electronic drives.
CORRECT
Junction box
Junction box
Drive system
Plug 1-pole
Power
supply system
Junction box
Junction box
Drive system
Plug
Power
supply system
WRONG
Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
27
Connection directives for motor drive
Parallel connection of two or more drives
The drives of a commonly
controlled unit never have
precise running times!
Therefore, if several drives
are to be commonly
operated with one switch, a
separate contact should be
provided for every drive
and every running direction
(galvanic isolation of the
drives). Please see also to
the adjacent illustration.
Jointly controlling several
drives requires control
and/or automatic
equipment. Otherwise,
there is the risk that
enormous loads occur, that
the limit switches get
destroyed and that the
drive malfunctions.
With several switches,
provide one-step or multi-
point control relays. When
controlling several drives,
use control equipment with
an interacting locking of
commands.
This regulation does not
apply for radio
-
controlled
and electronic drives.
CORRECT
Junction box
Junction box
Drive system 1
Plug 2-pole
Power
supply system
Drive system 2
WRONG
Junction box
Junction box
Drive system 1
Plug
Power
supply system
Drive system 2
Installation Instructions and Instructions for Use
28
Subject to technical modifications –Date of Issue March/2022
Connection directives for motor drive
The electrical connection is described in the enclosed instructions of the manufacturer of
the motor drive and must be carried out in accordance with these instructions
Connect the Hirschmann connector by cable as shown in the illustrations
below.
Hirschmann
plug
connection
Descriptions
Hirschmann
connector
STAS 3 with
retaining clip
Art. no. 05350019
Hirschmann cable
socket
STAK 3
Art.
no. 05350020
Installation
on the motor side
on the facade side
Terminal
connections
without radio
(view from the
front)
1 blue (N)
2 black (phase)
3 brown (phase)
4 yellow/green (PE)
1 blue (N)
2 black (phase)
3 brown (phase)
4 yellow/green (PE)

Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
29
Connection directives for motor drive
Directions for radio motors:
For elero radio-controlled tube motors, the connections no. 2 (black) and no. 3 (brown)
must be connected in the junction box (bridge) by the customer.
View: Connection of elero radio-controlled tube motor with Hirschmann connector with
bridge in the junction box
For Somfy radio-controlled tube motors (radio system RTS and io) a 3-pin supply line is
sufficient (connection 3 not assigned).
Colour chart for connecting cable
Protective conductor PE
Phase
Phase
Neutral conductor N
blue
black
brown
yellow/green
1
2
3
4
Mains
123
4
321
4
Installation Instructions and Instructions for Use
30
Subject to technical modifications –Date of Issue March/2022
Commissioning/functional check
If the unit is delivered with a motor drive, the end positions of the motor
are not pre-adjusted.
Therefore it is necessary to adjust the end position during the installation
on site.
Information about the correct procedure to adjust the end positions is
given in the enclosed adjustment guide lines for the motor.
Extend and retract the unit in and out completely. When extending the unit
for the first time, make sure no one is in the operating radius or standing
below the unit.
Make sure that during the later operation the units can be extended freely
and without blockings. Do not extend the unit, if objects or persons are in
the operating radius of the sun protection unit. Please observe the safety
instructions.
After the first extending check the mounting material and the construction
elements for strength.
Automatic control devices or switches, that are not in the operator's field of
vision, may not be used for test runs of motor driven units.
We recommend the use of a test cable for the provisional operation of the
motor.
Check all settings.
Check all screwed connections for tightness.
Clean the elements (see maintenance instructions).
Pass these instructions as well as possible instructions of the motor,
switch and control manufacturer on to the user.
Brief the user, whereupon you provide comprehensive information on the
safety and user instructions of the system.
Have the correct design of the system as well as the installation and
briefing with the safety information confirmed in writing (see handover
report).
Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
31
Removal
Switch the unit dead and take safety precautions against unintentional
switching on.
The removal is carried out in reverse order to the installation.
Installation Instructions and Instructions for Use
32
Subject to technical modifications –Date of Issue March/2022
Handing over report (for the fitter)
Dear Customer,
We are glad that you have opted for a HELLA brand product. Our units are fabricated with
greatest care and many years of experience.
The instructions for use and the installation instructions have been handed over and must
be read before using the product.
An introduction has taken place.
The safety instructions were pointed out.
Your product
Recess awning BM03
was manufactured in accordance with EN 13561:2004+A1:2008
and was installed professionally and handed over
on the ......................................................................................................................................
Dealer
Name
Place
Postal code
Date
Name
Street
Customer
Place
House number
Signature
Signature
Date
First name

Installation Instructions and Instructions for Use
Subject to technical modifications –Date of Issue March/2022
33
Handing over report (for the user)
Dear Customer,
We are glad that you have opted for a HELLA brand product. Our units are fabricated with
greatest care and many years of experience.
The instructions for use and the installation instructions have been handed over and must
be read before using the product.
An introduction has taken place.
The safety instructions were pointed out.
Your product
Recess awning BM03
was manufactured in accordance with EN 13561:2004+A1:2008
and was installed professionally and handed over
on the ......................................................................................................................................
Dealer
Name
Place
Postal code
Date
Name
Street
Customer
Place
House number
Signature
Signature
Date
First name
Installation Instructions and Instructions for Use
HELLA Interior Venetian
Blinds
regulate the lighting in a room
very comfortably, immediately
gracing it with much more
atmosphere.
HELLA Insect screens
and you decide who is allowed
to come in and who isn't.
HELLA Pleated Blind
folds up very compactly and
protects very well against the
sun and nosey glances where
only little space is available.
HELLA Outdoor Blinds
serve for the light regulation,
as view protection, anti
-
glare
blind and heat protection.
HELLA Front-mounted
Roller Shutter
for more safety and protection
against rain, wind, heat, the
cold, noise, incident light and
nosey glances, also available
for subsequent installation.
HELLA Vertical awning
With toggle catch mechanism
for a lovely façade design with
perfect heat and glare
protection.
For questions, wishes and ideas:
HELLA Infoline +43/(0)4846/6555-0
HELLA Sonnen- und Wetterschutztechnik GmbH
A-9913 Abfaltersbach, No. 125
Phone: +43/(0)4846/6555-0
Fax: +43/(0)4846/6555-134
e-mail: [email protected]
Internet: http://www.hella.info
Table of contents
Other Hella Accessories manuals

Hella
Hella APS-90 Manual

Hella
Hella PM07 protect Setup guide

Hella
Hella APS-R Manual

Hella
Hella CLEO 7040 Setup guide

Hella
Hella SOLANYA Setup guide

Hella
Hella ELEGANZA Setup guide

Hella
Hella SOLEYA User manual

Hella
Hella CLEO 5530 Setup guide

Hella
Hella ONYX.WEATHER User manual

Hella
Hella CLEO 7030 Setup guide
Popular Accessories manuals by other brands

Intermec
Intermec CK60 Ethernet Multidock instructions

Omron
Omron E3X-DA21-S instruction sheet

Trainor Sports
Trainor Sports 1232014US owner's manual

Lippert Components
Lippert Components Solera 795354 Installation and owner's manual

E-TINT
E-TINT CTRL MG1 quick start guide

Celestron
Celestron FOCUS 94155-A Setup guide