Hella PM03 Setup guide

Installation instructions and Instructions for use
These instructions must be read
prior to installation
and use!
Concealed awning PM03 side seam guided
Operating guidelines
Installation instructions and Instructions for use
Table of Contents
Preliminary remarks HELLA Concealed awning PM03 side seam guided............................3
General notes.......................................................................................................................4
CE marking...........................................................................................................................5
Safety instructions ................................................................................................................6
Storing..................................................................................................................................8
Protection of the product during construction phase ............................................................8
Designated use ....................................................................................................................9
Servicing, maintenance and repair .....................................................................................10
Before installation...............................................................................................................14
Part designation PM03 .......................................................................................................17
Part designation PM03 - Cable guiding ..............................................................................19
Drive duct ...........................................................................................................................20
Manufacturing of the duct for motor drive...........................................................................21
Fixing box...........................................................................................................................22
Fastening of the box - installation to the facade .................................................................24
Installation of the cover with front rail .................................................................................25
Installation of the cable guiding ..........................................................................................27
Installation with plaster base and rear insulation................................................................29
Activation guidelines for electric drives...............................................................................30
Connection directives for motor drive .................................................................................31
Commissioning/functional check ........................................................................................35
Removal .............................................................................................................................36
Handing over report (for the fitter) ......................................................................................37
Handing over report (for the user) ......................................................................................38
Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
3
Preliminary remarks HELLA
Concealed awning PM03 side seam guided
With this HELLA product you have opted for a high-quality product with a most up-to-date
technology that can nevertheless be easily installed and operated. In these instructions we
describe the basic installation, commissioning and use.
For authorized specialist staff
For the consumer (user)
The following symbols will assist you with the installation or use and require a safety-
conscious conduct:
Attention!
This symbol indicates instructions that, if disregarded, can put the user in
danger.
Attention!
This symbol indicates instructions that, if disregarded, can potentially
result in damage to the product.
This symbol indicates instructions for use or helpful information.
This symbol requires you to act.
Attention!
This symbol indicates a risk of injury or danger to life due to an electric
shock.
This symbol indicates parts of the product, for which you will find
important information in these installation instructions.
Installation instructions and Instructions for use
4
Subject to technical modifications –Date of Issue March/2022
General notes
Questions
In case of questions concerning the installation or the use of your product, please
consult your authorized specialist shop.
Spare parts/repairs
Spare parts are available at your HELLA specialist shop. Only spare parts that are
approved by HELLA are allowed to be used.
Liability
In case of non-observance of the directions and information given in these instructions
and in case of improper operation or unintended use, the manufacturer shall not accept
any warranty claims concerning any damage to the product. In these cases, the liability
for consequential damage to any parts or persons is ruled out as well.
As the composition or the chemical and physical properties of the plasters used are
beyond our control, the resistance of our systems to corrosion cannot be guaranteed,
Legal notes
The graphs and texts of these instructions were carefully prepared. We cannot be held
liable for any errors and their potential consequences! Subject to technical modifications
to the product and to these instructions! These instructions include copyrighted
information. All rights reserved! The listed product or brand names are trademarks of the
respective owners.

Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
5
CE marking
The HELLA concealed awning PM03 (side seam guided) is in compliance with the
declaration of performance according to the Construction Products Regulation; if the unit is
operated with a motor drive it is additionally in compliance with the Machinery Directive and
the Guideline for Electromagnetic Compatibility; in case of proper use, the awning
corresponds to the basic requirements of the harmonised standard EN 13561. The
respective declarations are deposited with the manufacturers.
*)... A class 0 wind protection per EN 13561 is indicated, because the standard test
procedure does not allow a conclusion to be drawn about the wind resistance with real
wind load. Depending on the design and the type of installation, the concealed awning is
suitable up to the maximum wind limit values recommended –see chapter "Designated
use".
The CE identification applies for the delivery status of the product. The product mounted
meets the requirements of the specified standard only, if
during installation the information and instructions given in these instructions as
well as the information and instructions of the manufacturers of the screws have
been observed,
the product is installed with the recommended type and number of
fasteners/screws.
No changes, rebuildings or extensions, with the exception of those described in these
instructions, are allowed with this product. The fixed CE-label expires with any change,
rebuilding or extension.
HELLA Sonnen- und Wetterschutztechnik GmbH
A-9913 Abfaltersbach 125
22
LE-PUMA-01-001
EN 13561:2004+A1:2008
Concealed awning
PM03
Exterior textile sun protection
Wind resistance class 0*
Installation instructions and Instructions for use
6
Subject to technical modifications –Date of Issue March/2022
Safety instructions
These installation instructions refer to prefabricated elements, that (1) for
100% are made from parts, which are defined by us, and (2) which are
made in manufacturing processes, which are defined by us too; in all other
cases we do not provide any guarantee!
The safety instructions as well as the appropriate instructions must be
read carefully before installation and use. In case of non-observance of
the directions and information given in these instructions and in case of
improper installation and operation or unintended use, the manufacturer
shall not accept any warranty claims concerning any damage to the
product. In these cases, the liability for consequential damage to any parts
or persons is ruled out as well.
- Follow the described installation steps and pay attention to
recommendations and notes.
-Keep these instructions in a safe place.
- All installation and removal works, as well as maintenance and repair
works are only allowed to be carried out by authorised and qualified
specialist staff.
-If switching, automatic or radio control devices are used to operate the
units, the information given in the enclosed instructions of the
manufacturer must be observed.
-During operation do not put your hand into or touch movable parts.
-Ensure that clothing or body parts cannot get caught on the unit.
- Observe the regulations for prevention of accidents of the employer's
liability insurance association!
-Before operation check the unit for visible damage. If the unit is
damaged, it should not be used; please consult authorized specialist
staff immediately.
-Risk of injury and accident due to the weight of the product!
-Take safety measures against the danger of squashing, especially
when operating the unit with automatic devices.
- Place the operating switch within sight of the unit, but not near any of
the moving parts.
- Never let children play with the unit.
A sun protection device with electric drive cannot be retracted without
current. We therefore recommend the use of an emergency power
generating unit or a motor with an emergency crank handle, especially in
regions with frequent power failures.
Danger of suffocation!
Ensure that the foil cannot get into the hands of children. Keep the foil in a
safe place.
Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
7
Safety instructions
Attention! Risk of injury or danger to life due to an electric shock!
-Set-up, examination, commissioning and error correction of the unit
must only be performed by authorised or trained expert staff (as per
VDE 0100).
-Switch off the current to the connecting lines when working at the unit.
There is danger to life! Take safety precautions against unintentional
switching on!
- Check the electrical wires regularly for damage. Do not use the unit if
any damage is found.
-Our electrically driven units are in accordance with the regulations for
power plants acc. to VDE 0100. We cannot guarantee for the
operational reliability of the unit with non-approved modifications.
-White motor cables are not UV-resistant and must therefore be routed
in empty conduits, cable ducts, or similar.
- The enclosed installation instructions of the electrical devices supplied
must be observed.
Units with motor drive:
The drives used are operated with a voltage of AC 230V/50Hz. Please
check the power supply provided by your utility company before
connecting. Any other voltage can destroy the drives.
With wind move the unit to the upper end position.
Winter operation:
Snow or ice can destroy the unit.
The unit may only be operated, if no ice or snow is lying on the cover.
During this time automatic control devices must be switched to
manual operation.
Installation instructions and Instructions for use
8
Subject to technical modifications –Date of Issue March/2022
Storing
- Keep dry when storing!
-Cover the boxes with materials that are impervious to light.
Protection of the product during construction phase
During the construction phase, the element to be mounted must be
protected against the weather. Materials made of EPS must be plastered
within three months.
Recommendations:
-Protection of the insulating material by applying a plaster base
- Covering the upper surface (do not use transparent foils!)

Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
9
Designated use
Sun protection
Thermal protection
Sight screen
Anti-glare blind
Wind limit recommendations for HELLA vertical awnings side seam guided
Design
Concealed awning
[bft]
[m/s]
Cable/rod guiding directly (standard clearance) on façade
4-5
6-8
Cable/rod guiding on façade distance 30 - 100 cm
4
6
Cable/rod guiding on polygonal facade
4
6
Cable/rod guiding in the soffit
4-5
6-8
Installation instructions and Instructions for use
10
Subject to technical modifications –Date of Issue March/2022
Servicing, maintenance and repair
With the purchase of your awning you have opted for a high-quality product. To enjoy your awning for
as long as possible, please observe the following information:
Notes to awning covers made of brand acrylic fibres
Brand acrylic fibres, as used for awnings, are materials of the highest quality for awnings. As they are
dope-dyed, these materials show the highest light- and colour-fastness. In addition, their resistance to
tearing and resistance to weather, rotting and environmental effects is unsurpassed. Furthermore, a
special textile finishing makes them dirt-, water-, oil- and grease resistant. The awning cover is heavily
tested. At the weaving plant, at the awning manufacturer and during awning fabrication. As with other
covers, differences in the surface uniformity can also occur with the awning cover. When viewing from
the top or seeing through, you will perhaps find small knots, spots of colour, irregular runs of threads
or minimal differences and displacements in the design and rapport, as well as differences in the
colour. Please note, that the awning will cause a different colour effect in sunlight and in shade.
Naturally, the optical colour perception depends on the composition and the intensity of the emerging
light. With increasing depth of colour, more light will be absorbed and less will be reflected. Therefore
dark coloured covers let through a small amount of light, while light colours let a lot of light through.
Due to the part-absorption, the composition of the light shining through will be modified, which results
in other colour perceptions.
Due to the coloured pigments embedded in the cover and the impregnation, shadings caused
by crinkles or crumple folds can appear, that, especially with light colours, become visible as
strips of shade.
The function, strength or density of the cover will not be reduced by that. Minor differences in colours
between the different cover strips or differences in colours with regard to the collection of samples
cannot be ruled out. The fabrication of several strips also with varying widths depends on the overall
width of the awning.
Ripples in the cover and wrinkling at the seams can arise, because the cover is double rolled up at the
seams.
The highest strain is on the seams of the cover. When rolling up the cover, the seams and hems lie on
top of each other, intensifying the strain. Hems and seams will be pressed flat, increasing in length. As
a result, the lateral seams of the cover can hang down slightly.
Sagging as a result of the own weight of the cover is possible. These specified phenomenons are not
faults in the awning cover, which have been overseen in the testing; they are unavoidable due to
technical, material and physical regularities. They therefore do not entitle the customer to any refusal
or reduction of the purchase price.
Correspondingly, the guidelines for the assessment of ready-made awning covers, summarized by the
German Federal Association "Manufacture of technical textile registered association" (Bundesverband
Konfektion Technischer Textilien e. V.), are also an integral part of our conditions of sale and delivery.
Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
11
Servicing, maintenance and repair
Cleaning
Cleaning
As a sun protection device fixed outside, the unit can get dirty in the
course of time. This will not reduce the usability of your unit. The
powder-coated parts of your unit will remain presentable for longer, if
they are cleaned regularly with a soft woollen cloth.
Do not use solvents, alcohol (rubbing alcohol) or scouring cleansing
agents!
Leaves or other foreign material lying on the awning cover and in the
awning
cassette must be removed immediately. There is danger of
damage or crashing to the awning.
Preventive measures
If you have to draw in the cover in a wet condition, please draw it out for
drying when the next opportunity arises, to prevent marks ca
used by
mould or mildew.
Installation instructions and Instructions for use
12
Subject to technical modifications –Date of Issue March/2022
Servicing, maintenance and repair
Maintenance
Maintenance
All inspection and maintenance works must be carried out by a
specialised company from HELLA or a HELLA partner. Regularly check
the electrical wires of motor driven units for damage. Check the
mechanical parts of your unit for visible damage. After exceptional
events such as storm, hail, sleet, maloperation or the like, the unit must
be checked for noticeable damage prior to operating it. If the unit is
damaged, it must not be used; consult authorized specialist staff
immediately. It is recommended to have the unit maintained by
specialist staff on an annual basis. This way wear is detected at an
early stage and damage to the unit is prevented.
Repair works
Repair:
Improper repair works may cause both risk of injury to persons or
damage to the units.
Repair works must be carried out by a HELLA specialist company or a
partner company of HELLA.
Only use original spare parts from HELLA.

Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
13
Operating guidelines
Motor drive:
By activating a switch, a
remote control or an
automatic device, the roller
shutter moves “up" or "down”.
The blind stops by releasing
a pushbutton or pressing the
counter or stop button with a
latching switch.
The end positions of the drive
are not adjusted ex works.
Therefore it is necessary to
adjust the end positions
during the installation on site.
Please observe the enclosed
instructions of the
manufacturer of the motor.
Please refer to the enclosed
instructions of the
manufacturer for operating
possibilities via control
devices.
Installation instructions and Instructions for use
14
Subject to technical modifications –Date of Issue March/2022
Before installation
Check the product immediately for possible shipping damage and for
compliance with the delivery receipt.
If parts are missing or damaged, please consult your supplier immediately.
Check the mounting base and ensure that the mounting material to be
used complies with the given conditions to guarantee proper installation. In
case of doubt, please seek advice from a specialist enterprise for fixing
techniques.
The packaging cardboard box should not be exposed to humidity. To
protect it from rain during transport, it should be covered by a foil.
Carry larger units by two persons. Transport and store the units carefully
to prevent injury of persons and damage to the product.
Remove the packaging material carefully. When using a knife, be careful
not to damage the packaging content and to avoid cuts!
Dispose of the packaging material via recycling.
Caution!
A wrong installation can endanger the user seriously. Please strictly
observe the installation instructions. Close off the place of installation.
When working at higher heights, there is risk of falling. Suitable ascent
supports, scaffoldings and fall protection devices are to be used. Please
make sure that the ascent supports stand solidly and provide a firm grip.
Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
15
Before installation
Cable exit towards the top
Cable exit towards the rear
55
12
115
55
26
26
12
115
Installation instructions and Instructions for use
16
Subject to technical modifications –Date of Issue March/2022
Before installation
Version with cable whip and Hirschmann connector in the box
Legend
Cable exit towards the top
Cable exit towards the rear
Cable holder double
Always provide 3 cable holders (3), if the “Hirschmann connector is stored
in the box” (see illustration above)!
Please make sure, that the cable whip is mounted on the correct side, and
that the cable resp. connector can not get caught by the cover or the roller
tube.
3
26
55
1
2
1
2

Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
17
Part designation PM03
Overview box sizes
With 20/40 mm insulation at the rear
side
without insulation
Legend
PN
Plaster flange (7, 15, 27, 37 or 47 mm - as per order)
E 115
20/40 10
PN
E 115 10
150
PN
88
130
105
PN 7
PN 27
PN 37 PN 47
PN 15
Installation instructions and Instructions for use
18
Subject to technical modifications –Date of Issue March/2022
Part designation PM03
Box E 115
Legend
Plaster base 10mm
Motor drive (Somfy, elero)
Plaster distance 15mm
Adapter for motor
Inspection cover
Motor bearing
Head piece motor/bearing - on the
left/on the right side
Plaster base profile
Retaining bracket for spring device
Box profile
Ball bearing
Mounting bracket optional
Telescopic roller capsule spring-
loaded
Covering profile for insulation 20/40
mm (optional)
Adapter for bearing side
Sealing profile (optional)
Drive ring
Insulation 20/40 mm optional
456789
2
3
1
10 11 12
14
15
13
18
17
16
Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
19
Part designation PM03 - Cable guiding
Legend
Clamping shell
Retaining bracket
Front rail
Reducing bush
Cable
Strainer bolt
Pressure spring
Screws for front frail
insert
Strainer clamp
Spring cup
Front rail insert
Nut for strainer bolt
1
2
3
4
6
7
8
9
10
11
12
5
Installation instructions and Instructions for use
20
Subject to technical modifications –Date of Issue March/2022
Drive duct
Check the dimensions of
the element and wall
opening, and the dimension
of the window respectively.
Motor drive: Pay attention
to the dimensions for the
cable exit
See therefore figures in
chapter “Before Assembly”

Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
21
Manufacturing of the duct for motor drive
Providing a duct in the wall or window frame
- Provide a duct boring
with ø10 mm!
- Avoid sharp edges at the
duct or remove them!
- Provide the duct on site
in accordance with the
current standards and
regulations!
- Pay attention to flush
mounted cables, water
pipes etc. when boring!
Please observe the
instructions of the
Association for Electrical,
Electronic & Information
Technologies (VDE) for the
the sealing of cable ducts!
For wiring please refer to
the chapter "Activation
guidelines for electric units"
as well as to the
"Connection directives for
motor drives".
Installation instructions and Instructions for use
22
Subject to technical modifications –Date of Issue March/2022
Fixing box
Fastening without mounting bracket
Legend
Mounting hole at the top
Mounting hole at the bottom
Drilling machine
D
Insulation 20/40 mm
1. Hold the box profile with the
bore holes dimensionally
correct to the mounting base.
2. Put a pointed object (nail,
screw,...) through the punched
holes and the insulation
provided on the rear side of the
box profile.
3. Strike against the object to
make the positions of the
boreholes visible on the
mounting base.
4. Drill the bore holes with the
drilling machine (3) (drill
according to the mounting
base) and fix the box profile in
accordance with the mounting
materials used If required, put
the motor cable through the
wall or window opening already
provided.
If the installation is carried
out without mounting
brackets, the upper and
lower bore holes are
mandatory.
Distance between the bore
holes see definition
The front rail with rolled up
cover is enclosed in the
delivery as separate package.
D115 10
18
132
1
2
3
Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
23
Fixing box
Fastening with mounting bracket
The number and position of
the mounting brackets as
shown in the following table
must be strictly observed.:
Complete width
(mm)
Number UKT
≤3000
2
3001-5000
3
1.
Position the mounting brackets as
per definition
2.
Screw the bracket and the box
profile together
3.
The distance from the mounting
bracket to the box profile
(distance between 0 and 40 mm)
depends on the fact, if a 20/40
mm thick insulation on the rear
side is provided or not.
If the box is mounted with the
help of a mounting bracket,
only the lower bore hole at the
box is required!
Distance between the bore
holes see definition
Legend
Mounting bracket
Carriage bolt M6x20 mm
Plain washer M6
Security pattern M6
A
Position of the basic bracket:
At least 70 mm
500 mm at maximum
88
130
60
≤ 2000
1
AA
2
3
4
1
0 - 40
Installation instructions and Instructions for use
24
Subject to technical modifications –Date of Issue March/2022
Fastening of the box - installation to the facade
Fastening with mounting bracket
The basic bracket is loosely
enclosed!
1.
Screw the basic bracket resp.
mounting bracket to the mounting
base (screws according to the
mounting base)
2.
Screw the box profile through the
mounting holes at the bottom to
the mounting base (see also
chapter “Fastening of the box -
direct installation”)
Legend
Bore a hole to fix the box
A
Position of the basic bracket:
At least 70 mm
500 mm at maximum
18
150
AA
1
150

Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
25
Installation of the cover with front rail
1. Coil up the cover via the
front rail to a remainder of
approx. 500 mm.
2. Place the remainder of
the coiled up cover around
the roller tube and secure it
in the groove of the roller
tube using the clip keder
(1).
Legend
Clip keder
2.
2.
~500
1
1.
1
Installation instructions and Instructions for use
26
Subject to technical modifications –Date of Issue March/2022
Installation of the cover with front rail
3. Unwind the cover and
check the symmetric
alignment of the cover. If
necessary, move the cover
on the roller tube and lock
the cover fixation in the
roller tube.
4. Move the system to
approx. 50 mm before the
upper end position via the
setting cabl
e.
5. Adjust the motor end
positions and perform the
function test or the
commissioning process.
4646
3.
Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
27
Installation of the cable guiding
Lower blind approx. 50 mm
Insert pressure spring with
reducing bush into the spring
device. Feed the guide cable
through until the upper end of the
cable rests with the pressed
clamping shell on the bushing.
Fix the complete unit with the
spring cup to the side cover
Ensure that it is correctly seated.
Pass the guide cable through the
front rail insert (1) into the lower
tensioning option.
As shown opposite, fix the lower
end according to the selected
tensioning option (2-5).
Legend
Front rail insert
Strainer clamp
Strainer clamp with
threaded fitting
Tensioning shoe
Tensioning bracket
Strictly observe the
dimensioning instructions.
Outer edge of the box up to
the axle of the cable Fix the
tensioning in an exact vertical
and parallel position!
1
2
2
3
3
4
4
5
5
25 25
Installation instructions and Instructions for use
28
Subject to technical modifications –Date of Issue March/2022
Installation of the cable guiding
Fastening of the tensioning elements with strainer bolt
Legend
Noise insulating board
Strainer clamp in centre –
SA1xMx
Double strainer clamp- SA1xDx
Y
Dimension Y (distance between
cable axis - cable axis) [mm]
- Fix the tensioning element
in accordance with the
mounting base. Installation
with noise insulating
board, where required.
The tensioning cable must
be in an exact vertical
alignment.
- Insert the cable into the
tensioning element.
-Pre-tension the tensioning
cable using combination
pliers or long-nosed pliers.
- Preload spring by approx.
5 mm = 200 N
In doing so take care not to
damage the cable or the
tensioning element.
-Tighten the screw to
clamp the cable when it is
tensioned.
- Shorten the cable
3.
4.
5.
1.
2.
2
1
3
Y

Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
29
Installation with plaster base and rear insulation
Installation example
Legend
Complete width = outer edge of the box
Plaster
Complete height
Plaster for 5 mm maximum
PN
Plaster flange (7, 15, 27, 37 or 47 mm →as per order)
PN
25
2
1
1
20/40
3
E 115
150
≥ 20
10
4
4
Installation instructions and Instructions for use
30
Subject to technical modifications –Date of Issue March/2022
Activation guidelines for electric drives
The motors we use are drives with integrated planetary gear, brakes, limit
stops at the top and at the bottom, and thermo cut-off switches, also not
only a motor, but a complete drive system.
The construction, checking, commissioning and error-correcting of the
electrical system are only allowed to be carried out by an electrician (acc.
to VDE 0100). In case of improper connection, considerable danger can
arise for the user.
-Follow the wiring diagram precisely!
-We cannot accept responsibility for damage, that can result from
improper installation.
-Never simultaneously activate the drives with an UPWARDS and a
DOWNWARDS signal!
-Keep a break of approx. 0.5 seconds between the UPWARDS and
the DOWNWARDS command (is often neglected with Instabus EIB-
systems).
Radio interference suppression
The drives are provided with a radio interference suppression according to
the current VDE standards and EC Guidelines. If the drives are operated
with other devices, that include interferences, it
is the fitter's duty -
as part
of the obligation to suppress interference
-
to ensure that the entire unit
complies with the current regulations.
Operation in wet spaces
The drives are "splash-proof"; if they are operated in wet spaces, the VDE-
guidelines, inter alia VDE 0100/Parts 701, 702, the guidelines of the local
electric supply companies and of the TÜV must be observed and fulfilled.
Both the instructions and notes given in these instructions, as well
as the instructions and notes given in
the respective enclosed
instructions of the manufacturers of the drive systems must be
observed.
Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
31
Connection directives for motor drive
Activation of a drive
It must be ensured, that a
drive is provided with a
locking mechanism, so that
it can be activated in one
running direction only (see
adjacent illustration).
Otherwise, there is the risk
that enormous loads occur,
that the limit stops get
destroyed and that the
drive
malfunctions.
This regulation does not
apply for radio-controlled
and electronic drives.
CORRECT
Junction box
Junction box
Drive system
Plug 1-pole
Power
supply system
Junction box
Junction box
Drive system
Plug
Power
supply system
WRONG
Installation instructions and Instructions for use
32
Subject to technical modifications –Date of Issue March/2022
Connection directives for motor drive
Parallel connection of two or more drives
The drives of a commonly
controlled unit never have
precise running times!
Therefore, if several drives
are to be commonly
operated with one switch, a
separate contact should be
provided for every drive
and every running direction
(galvanic isolation of the
drives). Please see also to
the adjacent illustration.
Jointly controlling several
drives requires control
and/or automatic
equipment. Otherwise,
there is the risk that
enormous loads occur, that
the limit switches get
destroyed and that the
drive malfunctions.
With several switches,
provide one-step or multi-
point control relays. When
controlling several drives,
use control equipment with
an interacting locking of
commands.
This regulation does not
apply for radio-controlled
and electronic drives.
CORRECT
Junction box
Junction box
Drive system 1
Plug 2-pole
Power
supply system
Drive system 2
WRONG
Junction box
Junction box
Drive system 1
Plug
Power
supply system
Drive system 2

Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
33
Connection directives for motor drive
The electrical connection is described in the enclosed instructions of the manufacturer of
the motor drive and must be carried out in accordance with these instructions
Connect the Hirschmann plug connection by cable as shown in the
illustrations below.
Hirschmann
plug
connection
Descriptions
Hirschmann
connector
STAS 3 with
retaining clip
Art. no. 05350019
Hirschmann cable
socket
STAK 3
Art. no. 05350020
Installation
on the motor side
on the facade side
Terminal
connections
without radio
(view from the
front)
1 blue (N)
2 black (phase)
3 brown (phase)
4 yellow/green (PE)
1 blue (N)
2 black (phase)
3 brown (phase)
4 yellow/green (PE)
Installation instructions and Instructions for use
34
Subject to technical modifications –Date of Issue March/2022
Connection directives for motor drive
Directions for radio motors:
For elero radio-controlled tube motors, the connections no. 2 (black) and no. 3 (brown)
must be connected in the junction box (bridge) by the customer.
View: Connection of elero radio-controlled tube motor with Hirschmann plug connection
with bridge in the junction box
For Somfy radio-controlled tube motors (radio system RTS and io) a 3-pin supply line is
sufficient (connection 3 not assigned).
Colour chart for connecting cable
Protective conductor PE
Phase
Phase
Neutral conductor N
blue
black
brown
yellow/green
1
2
3
4
Mains
123
4
321
4
Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
35
Commissioning/functional check
If the unit is delivered with a motor drive, the end positions of the motor
are not pre-adjusted.
Therefore it is necessary to adjust the end position during the installation
on site.
Information about the correct procedure to adjust the end positions is
given in the enclosed adjustment guide lines for the motor.
Extend and retract the unit in and out completely. When extending the unit
for the first time, make sure no one is in the operating radius or standing
below the unit.
Make sure that during the later operation the units can be extended freely
and without blockings. Do not extend the unit, if objects or persons are in
the operating radius of the sun protection unit. Please observe the safety
instructions.
After the first extending check the mounting material and the construction
elements for
strength.
Automatic control devices or switches, that are not in the operator's field of
vision, may not be used for test runs of motor driven units.
We recommend the use of a test cable for the provisional operation of the
motor.
Check all settings.
Check all screwed connections for tightness.
Clean the elements (see maintenance instructions).
Pass these instructions as well as possible instructions of the motor,
switch and control manufacturer on to the user.
Brief the user, whereupon you provide comprehensive information on the
safety and user instructions of the system.
Have the correct design of the system as well as the installation and
briefing with the safety information confirmed in writing (see handover
report).
Installation instructions and Instructions for use
36
Subject to technical modifications –Date of Issue March/2022
Removal
Switch the unit dead and take safety precautions against unintentional
switching on.
The removal is carried out in reverse order to the installation.

Installation instructions and Instructions for use
Subject to technical modifications –Date of Issue March/2022
37
Handing over report (for the fitter)
Dear Customer,
We are glad that you have opted for a HELLA brand product. Our units are fabricated with
greatest care and many years of experience.
The instructions for use and the installation instructions have been handed over and must
be read before using the product.
An introduction has taken place.
The safety instructions were pointed out.
Your product
Concealed awning PM03
was manufactured in accordance with EN 13561:2004+A1:2008
and was installed professionally and handed over
on the.......................................................................................................................................
Dealer
Name
Place
Postal code
Date
Name
Street
Customer
Place
House number
Signature
Signature
Date
First name
Installation instructions and Instructions for use
38
Subject to technical modifications –Date of Issue March/2022
Handing over report (for the user)
Dear Customer,
We are glad that you have opted for a HELLA brand product. Our units are fabricated with
greatest care and many years of experience.
The instructions for use and the installation instructions have been handed over and must
be read before using the product.
An introduction has taken place.
The safety instructions were pointed out.
Your product
Concealed awning PM03
was manufactured in accordance with EN 13561:2004+A1:2008
and was installed professionally and handed over
on the.......................................................................................................................................
Dealer
Name
Place
Postal code
Date
Name
Street
Customer
Place
House number
Signature
Signature
Date
First name
Installation instructions and Instructions for use
HELLA Interior Venetian
Blinds
regulate the lighting in a room
very comfortably, immediately
gracing it with much more
atmosphere.
HELLA Insect screens
and you decide who is allowed
to come in and who isn't.
HELLA Pleated Blind
folds up very compactly and
protects very well against the
sun and nosey glances where
only little space is available.
HELLA Outdoor Blinds
serve for the light regulation,
as view protection, anti
-
glare
blind and heat protection.
HELLA Front-mounted
Roller Shutter
for more safety and protection
against rain, wind, heat, the
cold, noise, incident light and
nosey glances, also available
for subsequent installation.
HELLA Vertical awning
With toggle catch mechanism
for a lovely façade design with
perfect heat and glare
protecti
on.
For questions, wishes and ideas:
HELLA Infoline +43/(0)4846/6555-0
HELLA Sonnen- und Wetterschutztechnik GmbH
A-9913 Abfaltersbach, No. 125
Phone: +43/(0)4846/6555-0
Fax: +43/(0)4846/6555-134
e-mail: office@hella.info
Internet: http://www.hella.info
Table of contents
Other Hella Accessories manuals

Hella
Hella VIVA 7040 Setup guide

Hella
Hella CLEO 5530 Setup guide

Hella
Hella ONYX.TAG wind Setup guide

Hella
Hella PM07 protect Setup guide

Hella
Hella SOLEYA User manual

Hella
Hella C2 Setup guide

Hella
Hella BM03 Setup guide

Hella
Hella ONYX.WEATHER User manual

Hella
Hella SOLANYA Setup guide

Hella
Hella CLEO 7040 Setup guide
Popular Accessories manuals by other brands

Acuity
Acuity AR100 Super Compact Laser Sensor user manual

HES
HES 5200 Series Installation instructions and use

PCB Piezotronics
PCB Piezotronics M117B30 Installation and operating manual

INSTEON
INSTEON 2845-x22 owner's manual

ScentAir
ScentAir ScentStream SXD2110 Installation and operation instructions

Panasonic
Panasonic MA3SD29F Specification sheet