
For the latest fing instrucons please visit www.insigniarange.co.uk
For the latest fing instrucons please visit www.insigniarange.co.uk
VERY IMPORTANT
Have you got everything? If not please contact your supplying deal-
er now. Remember NEVER
has arrived, been checked and is present. No replacement / miss-
BEFORE build.
IMPORTANT INFORMATION BEFORE YOU START THE
BUILD
Due to most bathrooms being small and this product takes a lot of
room. This stage is the ideal and h ghly recommended BEFORE in-
BE CAREFUL!! NEVER TUG AT
IT!!
etc. In some cases the chrome surround around the larger jets will
twist off to assist this. Now fill with water to normal height now
rare occurrence indeed to actually have any form of seepage or
and should anything be incorrect, it is far easier to cure at this
stage than carrying the bath upstairs then down again!!! Another
reason for this is you will know you had NO leaks prior to carrying
caused by handling and not a bath fault. The repair although in
most cases, easy, s not covered by warranty!!
TO START.
Make sure you have a clear space, remember when finished and in
place you need access to check your build and able to pull the
shower out should you need to replace anything!
ust working with shower bath tub place this on a flat surface the
same as it will finally rest, now adjust feet (NOT LEG!) using a sprit
level place along the inner lip of the tub, lengthways and cross-
ways then true up to exact the bubble in the middle. This will au-
portantly the frame of shower will not sit accurately on bath if
incorrect.
a Sharpe knife blade to cut around the protruding ob-
jects to aid in
Now working from the back, locate the bath waste. Drill out
connect this to your house waste)
Drill here carefully to open
11 12