jbc NAE Series User manual

INSTRUCTION MANUAL
NAE
2-Tool Nano Control Unit

2
Allen Key 1.5 mm ......... 1 unit
Ref. 0009848
Manual ............................ 1 unit
Ref. 0028953
Metal Brush ............................................... 1 unit
Ref. CL2466
Brass Wool ................................................. 1 unit
Ref. CL6210
2-Tool Nano Control Unit ........................ 1 unit Cable Collector and Tool Holder ....... 2 units
Ref. CC2002
Packing List
The following items are included:
This manual corresponds to the following references:
NAE-9C (100V )
NAE-1C (120V)
NAE-2C (230V)
Power Cable .................. 1 unit
Ref. 0024092 (100V)
0023715 (120V)
0023714 (230V)

40 mm
50 mm
60 mm
80 mm
100 mm
130 mm 130 mm
para manuales - color gris
200 mm
300 mm
3
Tip Aligner
* not included, sold separately
Power Socket
Main Switch
Pedal Connectors
Nano Tool
Connectors
NT115
Nano Handle*
AN115
Adjustable
Nano Tweezers*
Features and Connections
Tool extension cord (1m)*
Ref. A1205
Accessory:
Display
Cartridge Extractor
Brass wool
Metal brush
Tool Holder
Cable Collector
Nano Tool
Connectors
Equipotential
Connector
USB-B
Connector
RJ12
Connector
USB-A
Connector
NAE
2-Tool Nano Control Unit

NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
3
2
1
4
3
2
1
Tool Holder Assembly
Tool Holder Replacement
Insert the new tool holder (3) and tighten the
screw (4).
Loosen the screw (1) and withdraw the tool
holder (2).
4

380ºC
Port
1
Power
45%
Temp. Levels
T470
250 380 400
17:14
350ºC
Port
1
Power
45%
Temp. Levels
250 350
17:14
T245
380
Menu Options
Station
Information
Power
Indicator
Tool
in use
DDE Work Screen
Status Bar
The DDE offers an intuitive user interface which provides quick access to station parameters.
Default PIN: 0105
Change
Port
Displayed if
Temperature
Levels are
Activated
Station Tools Counters
ResetLanguagePeripherals
Set the station
parameters
Set the tool
parameters
Display the hours
worked in each cycle
It is possible to
choose the language
from a list.
Station troubleshooting available on the product page at www.jbctools.com
Troubleshooting
Set the peripheral
links with the station
ports
Restore station
parameters to default
values
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
3
2
1
4
3
2
1
Tool Holder Assembly
Tool Holder Replacement
Insert the new tool holder (3) and tighten the
screw (4).
Loosen the screw (1) and withdraw the tool
holder (2).
350ºC
Port
2
Power
45%
Temp. Levels
250 350 380
17:14
NT115
40 mm
50 mm
60 mm
80 mm
100 mm
130 mm 130 mm
para manuales - color gris
200 mm
300 mm
5
Station
Information
Change
port
Power
indicator
Tool
in use
Work Screen
Status Bar
The work screen offers an intuitive user interface which provides quick access to station
parameters. Default PIN: 0105
Displayed if
temperature
levels are
activated

Export graphics
Insert a USB flash drive into the USB-A
connector to save your soldering
process in csv format.
Profiles
Advanced Functionalities
It provides detailed graphics of tip temperature and power delivery in real time during
solder joint formation for analysis purposes. This helps you decide how to adjust your
process or which tip to use to obtain the best quality soldering.
Graphics
Designed to avoid thermal shock when soldering Ceramic Chip components like MLCC,
this new and unique feature allows controlling the heating ramp up rate of the tool to
gradually increase the temperature of the component through all the phases of the
soldering process. Up to 25 fully configurable soldering profiles can be stored.
System Notifications
The following icons will be displayed on the screen’s status bar.
Station update
Download the JBC Update File from
www.jbctools.com/software.html
Insert the USB flash drive with the file
downloaded to the station.
Files
Update
USB flash drive is connected.
Station is controlled by a PC.
Station is controlled by a robot down-
loaded to the station.
Station software update. Press INFO to start
the process.
Warning. Press INFO for failure description.
Error. Press INFO for failure description,
the type of error and how to proceed.
2
17:14
Hibernation
Actual Temp. 25ºC
Port
2
350ºC
Port
2
Power
45%
17:14
Selected 350ºC
NT115 NT115
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
Operation
When the tool is lifted from the holder the tip will
heat up to the selected temperature.
When the tool is in the holder, the power is cut
off and the tool cools down to room temperature.
Tool Settings:
· Operating Temp. and Temp. Levels
Press , select Tool Settings and
activate the Temp.Levels option.
Change Work temperature and Temp.
Levels from 90 to 450 ºC.
or steps of ±5 ºC / ºF
Tool Settings:
· Hibernation
Change Hibernation delay from 0 to
60min or no Hibernation.
2. Hibernation1. Work
This revolutionary technology is able to recover tip temperature extremely quickly.
This allows the user to work at a lower temperature.
As a result, tip life increases by 5.
JBC’s Exclusive Heating System
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
C115
C11
C105 /
C105 / C115
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
6

2
17:14
Hibernation
Actual Temp. 25ºC
Port
2
350ºC
Port
2
Power
45%
17:14
Selected 350ºC
NT115 NT115
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
Operation
When the tool is lifted from the holder the tip will
heat up to the selected temperature.
When the tool is in the holder, the power is cut
off and the tool cools down to room temperature.
Tool Settings:
· Operating Temp. and Temp. Levels
Press , select Tool Settings and
activate the Temp.Levels option.
Change Work temperature and Temp.
Levels from 90 to 450 ºC.
or steps of ±5 ºC / ºF
Tool Settings:
· Hibernation
Change Hibernation delay from 0 to
60min or no Hibernation.
2. Hibernation1. Work
This revolutionary technology is able to recover tip temperature extremely quickly.
This allows the user to work at a lower temperature.
As a result, tip life increases by 5.
JBC’s Exclusive Heating System
40 mm
50 mm
60 mm
80 mm
100 mm
130 mm 130 mm
para manuales - color gris
200 mm
300 mm
7

ROBOT
Tweezers
Nano Control Unit
1
Example:
Chip Compoments Rework Process using Tweezers and Pedal
P405
Pedal
Connections
Connect pedal P405 to the same port where
AN115 nano tweezers are connected.
In the peripherals menu for the “Pedal
Activation Mode” choose between “pressed”
and “released”.
The Pedal is frequently used to rework components with tweezers.
AN115, JBCs Adjustable Nano Tweezers, is the most effective tool for desoldering chip components
but also it facilitates its rapid placement and soldering by using P405 pedal connected to JBC´s NAS
station.
connect to
the same port
¥
ø 0,3
ø 0,6
0,3
2,5
0,2 x 0,1
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No
Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No
Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
0,7 3,5
Ø2,5
Ø2,5
¥
Spoon
1
Coformal
Coating
Removal
Blade
Changing Cartridges
Save time and change cartridges safely without having to switch the station off.
Removing Inserting Aligning
Place the cartridge into the
extractor slot (1) and pull
the handle to remove the
cartridge (2).
Push the new cartridge into
the handle until the reference
ring*.
Use the holes to rotate the
cartridges for proper alignment.
*Important
It is essential to insert the
cartridges up to the re-
ference ring for a proper
connection.
Reference
Ring
1
2
Compatible Cartridges
Nano Handle NT115 works with C115 cartridges. Find the model that best suits your soldering needs
at www.jbctools.com
Conical Chisel Bevel Knife
Conical
bent
Reference
Ring
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
8
Changing the Tip Cleaning System
Press back the tap (1) to remove the cleaning
system (2).
Remove the drawer from the splashguard.
2
Replace the tip cleaning system:
- Brass wool
- Metal brush
1

ROBOT
Tweezers
Nano Control Unit
1
Example:
Chip Compoments Rework Process using Tweezers and Pedal
P405
Pedal
Connections
Connect pedal P405 to the same port where
AN115 nano tweezers are connected.
In the peripherals menu for the “Pedal
Activation Mode” choose between “pressed”
and “released”.
The Pedal is frequently used to rework components with tweezers.
AN115, JBCs Adjustable Nano Tweezers, is the most effective tool for desoldering chip components
but also it facilitates its rapid placement and soldering by using P405 pedal connected to JBC´s NAS
station.
connect to
the same port
40 mm
50 mm
60 mm
80 mm
100 mm
130 mm 130 mm
para manuales - color gris
200 mm
300 mm
9

NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
3
4
Pad Cleaning
Clean the pads with JBC´s desoldering tool
DS360.
For this operation JBC´s desoldering station
DSS is needed.
Solder Paste Dispensing
Apply the solder paste amount needed to
solder the new chip component.
The use of JBC´s DPM solder paste dispenser
is recommended.
DPM
Manual
Solder Paste
Dispenser
DS360
Micro
Desoldering Iron
Desoldering*
Lift the tweezers from the holder, press and
hold the pedal to activate the tweezers and
desolder the component.
Once the pedal is released the tweezers enters
in hibernation mode and cools down.
2
* “Press Mode” previously selected
10

5
6
Soldering
Once in position press and hold the pedal
to activate the tweezers and perform the
soldering.
Placing
Do not press the pedal.
Use the tweezers to position the component
on the previously tinned pad.
Note:
The inactive tweezers prevents the component
from heating up prematurely.
40 mm
50 mm
60 mm
80 mm
100 mm
130 mm 130 mm
para manuales - color gris
200 mm
300 mm
11

NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
Maintenance
Before carrying out maintenance, always switch the device off and disconnect it from the mains.
Allow the equipment to cool down.
- Clean the station screen with a glass
cleaner or a damp cloth.
- Use a damp cloth to clean the casing
and the tool. Alcohol can only be used
to clean the metal parts.
- Periodically check that the metal parts
of the tool and stand are clean so that
the station can detect the tool’s status.
- Maintain the tip surface clean and
tinned prior to storage in order to avoid
tip oxidation. Rusty and dirty surfaces
reduce heat transfer to the solder joint.
- Periodically check all cables and tubes.
-Replace anydefectiveordamagedpieces.
Use original JBC spare parts only.
- Replace a blown fuse as follows:
1. Pull off the fuse holder and remove the
fuse. If necessary use a tool to lever it off.
- Repairs should only be performed by a JBC authorized technical service.
Clean periodically
Fuse holder
Fuse holder
Fuse
2. Press the new fuse into the fuse holder
and replace it in the station.
12

Safety
- Do not use the units for any purpose other than soldering or rework. Incorrect use may cause a fire.
- The power cord must be plugged into approved bases. Be sure that it is properly grounded before
use. When unplugging it, hold the plug, not the wire.
- Do not work on electrically live parts.
- The tool should be placed in the stand when not in use in order to activate the sleep mode. The
soldering tip or nozzle, the metal part of the tool and the stand may still be hot even when the station
is turned off. Handle with care, including when adjusting the stand position.
- Do not leave the appliance unattended when it is on.
- Do not cover the ventilation grills. Heat can cause inflammable products to ignite.
- Avoid flux coming into contact with skin or eyes to prevent irritation.
- Be careful with the fumes produced when soldering.
- Keep your workplace clean and tidy. Wear appropriate protection glasses and gloves when working
to avoid personal harm.
- Utmost care must be taken with liquid tin waste which can cause burns.
- This appliance can be used by children over the age of eight and also people with reduced physical,
sensory or mental capabilities or lack of experience provided that they have been given adequate
supervision or instruction concerning the use of the appliance and understand the hazards involved.
Children must not play with the appliance.
- Maintenance must not be carried out by children unless supervised.
It is imperative to follow safety guidelines to prevent electric
shock, injury, fire or explosion.
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
ROBOT
C115
C11
C105 /
C105 / C115
19:29
19:29
Port
2
Actual Temp. 25ºC
NT105
ºC
Power
45%
Selected 350ºC
350
Port
2
NT105
Hibernation
19:29
Port
2
Actual Temp. 25ºC
AN115
Hibernation
19:29
ºC
Power
45%
Selected 350ºC
350
Port
2
AN115
No Yes
NAE
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
Maintenance
Before carrying out maintenance, always switch the device off and disconnect it from the mains.
Allow the equipment to cool down.
- Clean the station screen with a glass
cleaner or a damp cloth.
- Use a damp cloth to clean the casing
and the tool. Alcohol can only be used
to clean the metal parts.
- Periodically check that the metal parts
of the tool and stand are clean so that
the station can detect the tool’s status.
- Maintain the tip surface clean and
tinned prior to storage in order to avoid
tip oxidation. Rusty and dirty surfaces
reduce heat transfer to the solder joint.
- Periodically check all cables and tubes.
-Replace anydefectiveordamagedpieces.
Use original JBC spare parts only.
- Replace a blown fuse as follows:
1. Pull off the fuse holder and remove the
fuse. If necessary use a tool to lever it off.
- Repairs should only be performed by a JBC authorized technical service.
Clean periodically
Fuse holder
Fuse holder
Fuse
2. Press the new fuse into the fuse holder
and replace it in the station.
40 mm
50 mm
60 mm
80 mm
100 mm
130 mm 130 mm
para manuales - color gris
200 mm
300 mm
13

Notes
14

Notes
40 mm
50 mm
60 mm
80 mm
100 mm
130 mm 130 mm
para manuales - color gris
200 mm
300 mm
15
Specifications
NAE
2-Tool Nano Control Unit
Ref. NAE-9C 100V 50/60Hz. Input fuse: 0.5A. Output: 8.5V
Ref. NAE-1C 120V 50/60Hz. Input fuse: 0.5A. Output: 8.5V
Ref. NAE-2C 230V 50/60Hz. Input fuse: 0.2A. Output: 8.5V
- Nominal Power:
- Peak Power (Tool): 14W per tool
- Selectable Temperature: 90 - 450 °C / 190 - 840 ºF
- Idle Temp. Stability (still air): ±1.5ºC / ±3ºF (meets and exceeds IPC J-STD-001)
- Temp Accuracy: ±3% (using reference cartridge)
- Temp Adjustment: ±50ºC / ±90ºF (through station menu setting)
- Tip to Ground Voltage/Resistance: Meets and exceeds
ANSI/ESD S20.20-2014 IPC J-STD-001F
- Connections: USB-A / USB-B / pedal connectors
RJ12 connector
- Ambient Operating Temp: 10 - 50 ºC / 50 - 122 ºF
- Control Unit Dimensions: 140 x 170 x 125 mm
(L x W x H) 5.51 x 6.69 x 4.92 in
- Total Net Weight: 2.12 kg / 4.67 lb
- Total Package Dimensions/Weight: 280 x 280 x 164 mm/ 11.02 x 11.02 x 6.46 in
(L x W x H) 2.54 kg / 5.60 lb
Complies with CE standards
ESD Safe

This product should not be thrown in the garbage.
In accordance with the European directive 2012/19/EU, electronic equipment at the end of its life must
be collected and returned to an authorized recycling facility.
Warranty
JBC’s 2 year warranty covers this equipment against
all manufacturing defects, including the replacement
of defective parts and labour.
Warranty does not cover product wear or misuse.
In order for the warranty to be valid, equipment must
be returned, postage paid, to the dealer where it was
purchased.
Get 1 extra year JBC warranty by registering here:
https://www.jbctools.com/productregistration/
within 30 days of purchase.
40 mm
50 mm
60 mm
80 mm
100 mm
130 mm 130 mm
para manuales - color gris
200 mm
300 mm
0028953-080523
This manual suits for next models
3
Table of contents
Other jbc Control Unit manuals
Popular Control Unit manuals by other brands

Phoenix Mecano
Phoenix Mecano Dewert Okin SG 300 installation instructions

Vega
Vega VEGADIS 81 operating instructions

Emerson
Emerson Keystone Figure 320 Installation and maintenance instructions

Opentrons
Opentrons GEN1 instruction manual

wtw
wtw IQ SENSOR NET MIQ/R6 operating manual

Amphenol
Amphenol SGX SNSORTECH PS1-O3-5-MOD Data Sheet / Manual