
F-640-0222 2-3
TABLE OF CONTENTS
IMPORTANT
All Harnesses must be firmly attached to Machine
Frame members so they do not sag or become torn
loose by field debris.
Folding Seeder Hitch
1. Orient the Main Harness so that the single 6-Pin
connector is to the front and the three 6-Pin
connectors are to the rear of the Seeder Hitch. Route
the Main Harness inside the Seeder Hitch Tube.
2. Install Brillion Elite Mini Monitor on tractor.
3. If not already installed, install Smart Clutch Relay into
Elite Mini Tractor Harness 3-Pin Connectors.
4. Connect the Elite Mini Tractor Harness 14-Pin
Connector to Brillion Elite Mini Monitor, 3-Pin Power
Plug to the 12 Volt Tractor Convenience Outlet and
6-Pin Connector to the Main Harness. 4-Pin
Connector is not used at this time.
Seeder Units
1. Lay out the Seeder Harnesses on the front of each
Seeder section ensuring that the Electric Clutch 2-Pin
Connector is on the left side.
2. On the Center Seeder only, remove Clutch. Install
Actuator Assembly onto the Quill Shaft outer
diameter, secure with Actuator Assembly Set Screw.
Reinstall Clutch. See Figure 2-5. Install Pick-up
Switch Bracket to the Transmission Input Shaft
Bearing Flangette Hardware. Assemble Smart Shaft
Sensor onto the Pick-Up Switch Bracket with sensor
provided hardware and #8-32 Flange Locknuts.
Adjust the Smart Shaft Sensor so that it is 1/8" Max
away from the Actuator Assembly. See Figure 2-6.
Connect Ground Speed Smart Shaft Sensor to the
Center Seeder Harness.
3. RH and LH Seeders do not have a Ground Speed
Smart Shaft Sensor, seal each Seeder Harness
Connector with a 3-Pin Shroud and Cavity Plugs to
protect the Seeder Harness from the environment.
4. On the RH side of each Seeder Unit a Sensor Mount
is mounted on two seed Cups. Install a Smart Shaft
Sensor to the Sensor Mount with sensor provided
hardware and #8-32 Flange Locknuts. Adjust the
Smart Shaft Sensor so that it is 1/8" Max away from
the pre-assembled Magnet Collar/Magnet Wheel
Assembly on the Seed Shaft. See Figures 2-7 and
2-8. Connect the Smart Seed Shaft Sensor to each
Seeder Harness.
5. If equipped with Rear Brome Seed Box, verify that the
pre-assembled Smart Shaft Sensor is positioned 1/8"
Max away from the Magnet Mount Assembly and
connect the Smart Shaft Sensor to each Seeder
Harness. See Figure 2-9. If not equipped with a Rear
Brome Seed Box, seal the Seeder Harness
Connector with 3-Pin Shroud and Cavity Plugs to
protect the Seeder Harness from the environment.
6. If Large Capacity Landscape Seeder is equipped with
a Rear Seed Box verify that the pre-assembled Smart
Shaft Sensor is positioned 1/8" Max away from the
Magnet Mount Assembly and connect the Smart
Shaft Sensor to each Seeder Harness. See
Figure 2-10. If not equipped with a Rear Seed Box,
seal the Seeder Harness Connector with 3-Pin
Shroud and Cavity Plugs to protect the Seeder
Harness from the environment.
7. Each Seeder Section has a Bin Level Sensor Bracket
on the inside at either end. Determine the desired
level for the alarm to be indicated on the Brillion Elite
Mini Monitor and assemble the Bin Level Sensors to
Bin Level Sensor Brackets with sensor provided
hardware and #8-32 Flange Locknuts. See
Figures 2-11, 2-12, and 2-13. If more adjustment is
needed, the Bin Level Sensor Brackets can also be
raised or lowered to the desired seed level. To get the
Sensor Connector outside the Seed Box, feed the
terminals through the Cord Grip. Install the terminals
into the 3-Pin Shroud labeled “A”, “B” and “C” as
follows “A” White, “B” Black, “C” Green. See
Figure 2-2. Inside the Seed Box, add enough slack to
the Bin Level Sensor Cord to allow for future
adjustment of the sensor. Secure Bin Level Sensor
Cord by tightening the Cord Grip Compression Nut.
Connect both Bin Level Sensors to each Seeder
Harness.
Figure 2-2: Bin Level Sensor Bracket Wire Detail
8. Attach Seeder Units to Folding Seeder Hitch. See
“Attaching Seeder Units” on page 2-16.
9. Connect 72" Extension Harness to the Center Seeder
and Main Harness.
10. Connect a 240" Extensions Harness to the RH and LH
Seeder Harnesses and connect both 240" Extension
Harnesses to the Main Harness.
11. Bundle and secure all Harnesses along the Seeder
Unit Frames and Folding Seeder Hitch Frame with Tie
Wraps
12. Program Bin Level Sensors and Smart Shaft Sensors
if not already pre-programmed.
White Wire
Black Wire
Green Wire
Terminal
3 Pin Shroud
Shroud
Pin ID
Seal