1. BEFORE PERFORMING THE START-UP OPERATION
1.1 EJ-210 Installation Check
Before performing the start-up operation of the boiler operation terminal EJ-210, perform the
following checks according to the Installation Manual of the EJ-210 and M-NET3 Communication
System.
(1) Main unit installation check
Ensure that the main unit is securely fixed at an appropriate location.
For details, refer to “5. INSTALLATION” in the Installation Manual of the EJ-210.
(2) Steam pressure sensor installation check
When installing the optional steam pressure sensor, ensure that it is installed correctly.
For details, refer to “6. WIRING” in the Installation Manual of the EJ-210.
(3) Wiring check
With reference to “6. WIRING” in the Installation Manual of the EJ-210, ensure that the
following wires are connected properly.
•Power supply wire and signal wire
Note that the wiring inside the boiler control box must be added or removed in some cases.
•RS-422 communication wire
Wiring is required only when the BG-type, BK-type, BL-type, or XJ1-type controller is mounted
in the boiler to be connected.
•M-NET3 communication wire
Depending on the connection status of communication wires, a communication error may
occur. Ensure that the communication wire is connected according to the Installation Manual
of the M-NET3 communication system.
•Steam pressure sensor wire
Wiring is required only when the optional pressure sensor for the EJ-210 is installed.
(4) Boiler ROM version check
When the BK-type controller is mounted in the boiler to be connected, ensure that the ROM
version is “BK111400” or later for a gas-fired boiler, and “BK211400” or later for an oil-fired
boiler.
When the BL-type controller is mounted in the boiler to be connected, ensure that the ROM
version is “BL111400” or later.
When the BG-type or XJ1-type controller is mounted in the boiler to be connected, it is not
necessary to check the ROM version.