868 WEIGHT STACK OPTION ASSEMBLY INSTRUCTIONS
10.
13.
SECURELYassemble one (I) 4-1/2 X 3/8 X1 IN. PULLEY,and two (2) 3/8 IN. SPACERSIothe
SUPPORTWELDMENTas shown on drawing using one (1) 3/8 X 2-3/4 IN. BOLT,two (2~)3/8
WASHERS,and one (1) 3/8 IN. LOCKNUT.
LOOSELYassemble tile BASEWELDMENTto the BASEof the LATUPRIGHTas shown on the
CABLEROUTINGDIAGRAMin the following order:
LOOSELYassemble one (1) 3/8 X3-1/2 IN. BOLTalong with the CABLEto the inside hole of the
BASEWELDMENT.Re-use the three (3) 3/8 IN. WASHERS,and one (I) 3/8 IN. LOCKNUT
STEP 1. (PLEASE SEE THE CABLE ROUTING DIAGRAM)
LOOSELYassemble the EXISTING3/8 X 3-1/4 IN. BOLT,two (2) 3/8 IN. WASHERS,and one (1)
3/8 IN. LOCKNUTfrom STEPI for the outside hole of the BASEWELDMENT.(PLEASESEE
THE CABLE ROUTING DIAGRAM)
Insert the GUIDERODSinto the holes of the BASEWELDMENTas shownon drawing, andallow them
to tilt back. (NOTE: LUBRICATEGUIDERODSWITHA SILICONORTEFLONSPRAYTHAT
IS AVAILABLEAT MOSTHARDWARESTORES)
Slide two (2) WEIGHTSTACKCUSHIONS(RADIUSEDGEFACINGUP) down over the GUIDE
RODSas shown on drawing.
SECURELYassemble the WEIGHTSTACKSHAFTto the ltEAD PLATEas shown on d~:awing, using
one (1) 3/8 X I-1/2 IN. BOLT,one (1) 3/8 IN. LOCKWASHER,and one (I) 3/8 IN. WASHER.
Snap two (2) WEIGHTPLATEBUSHINGSeach, into twenty (20) WEIGHTPLATESas shown
(DETAILA).
USINGEXTREMECAREslide all twenty (20) WEIGHTPLATESdown over the GUIDERODS
onto the WEIGHTSTACKCUSHIONSas shown on drawing. (MAKESURETHATTEE KEY
HOLES OF THE WEIGHT PLATES ARE ALL FACING THE SAME WAY)
Slide the HEADPLATEASSEMBLYdown over the GUIDERODSonto the WEIGHTSTACKas
shownon drawing.
Slide the TOPSUPPORTWELDMENTover the GUIDERODSas shown on drawing.
Removethe NUTSand WASHERSflom the !wo (2) loosened BOLTconnections on tile PULLEY
MOUNTFLAT.S above the WEIGHTSTACKas shown. Swing the TOP SUPPORTWELDMENT
over the top of the two (2) BOI~TS.Whenthe TOPSUPPOR.Tis in position ,cplace these two (2)
existing BOLTSwith two (2) 3/8 X 3-1/2 IN. BOLTS(ONEATA TIME). SECURELYassemble
WASHERSand NUTSto the BOLTS. (SEE DRAWING)
SECURELYtighten the BOLTconnections of the BASEWELDMENTfrom STEP4. (MAKESURE
THATTHE LOWPIJIAA~.Y (.’ABIA{ IS RUNNINGVERTICALLYBEFORETIGHTENING)