
RuijieRG-EG V2 Series Routers Hardware Installationand ReferenceGuide Preparationbefore Installation
8
supplies(thatis,Action currentof the leakageprotector/2/Maximum leakagecurrent ofeachpowersupply=30/2/3.5
= 4.28). In other words, the leakage protector with 30 mA rated action current supports no more than four power
supplies. In this case, the sixteen power supplies in the system require at least four leakageprotectors with 30 mA
rated action current and each leakage protectorsupports fourpowersupplies.If powersupplies ina system differin
models,the ratedleakageactioncurrentofeachleakage protectordividedbytwois greaterthanthesumofmaximum
leakagecurrents ofall thepowersupplies.Theratedleakagenon-action currentofa leakageprotectorshall be50%
of the leakageactioncurrent. Take a leakageprotectorwith 30 mArated leakage action currentas an example.The
rated leakage non-action currentshallbe 15 mA. When the leakagecurrent is below15 mA, the protector shallnot
act. Otherwise, misoperation mayeasilyoccur due to high sensitivityand thus the leakage protector trips, devices
are poweredoff,and services are interrupted.
To guaranteepersonalsafety,the ratedleakageactioncurrentofeachleakageprotectorinthesystem mustbeequal
to or less than 30mA(humanbodysafetycurrent is 30 mA). Whentwice of the total leakagecurrentof the system is
greaterthan 30 mA, the system mustbeequippedwithtwo or moreleakageprotectors.
For the leakagecurrentvalue of each powersupplymodel,see the powersupplymodelparametertableinChapter
1.
2.1.4 Static Discharge Damage Prevention
To prevent damagefrom static electricity, pay attentionto the following:
Propergroundingofgroundingscrews on the backpanel of the device.
Indoordustprevention
Properhumidityconditions
2.2 InstallationSite Requirements
To ensurethenormalworkingand a prolongeddurablelifeof the equipment,theinstallation sitemustmeetthefollowing
requirements.
2.2.1 Installation Site
If the router is installedinthecabinet,the following requirements shallbemet:
Make suresufficientroom has beenreservedfor the air intake and air vent of routerto facilitatethe heatelimination
of the router chassis.
Make surethe cabinetis equipped witha goodventilationand coolingsystem.
Make sure the cabinetand workbench is steadyenoughand capable of withstandingtheweightof the routerand its
accessories.
Make surethe cabinetis properlygrounded.
2.2.2 Ventilation
For the router, a sufficientspace (at least10cm distances from bothsidesand thebackplane of the cabinet) shouldbe
reservedat the ventilation openings toensurethe normal ventilation.After various cables havebeenconnected,they
shouldbearrangedintobundles orplacedonthe cablingrack to avoid blockingthe airinlets. It is recommendedtoclean