
1 Package contents ………………………………………………………………………………………… 6
2 Warning-Caution label location and content ………………………………………………………… 7
3 Operating precautions …………………………………………………………………………………… 9
For safety operation…………………………………………………………………………………………………………………………… 9
For smooth operation ……………………………………………………………………………………………………………………… 10
Other safeguards …………………………………………………………………………………………………………………………… 11
About the I-type heating element ………………………………………………………………………………………………………… 12
4 Outline of structure……………………………………………………………………………………… 13
5 Proper usage of the sealer …………………………………………………………………………… 13
6 Major parts and function ……………………………………………………………………………… 14
7 Preparation ……………………………………………………………………………………………… 16
7-1 Secure the work place ……………………………………………………………………………………………………………… 16
7-2 Plugging in the electrical power cord……………………………………………………………………………………………… 16
7-3 Install a foot switch ………………………………………………………………………………………………………………… 17
7-4 Set up an air source ………………………………………………………………………………………………………………… 17
7-5 Turn ON the breaker ……………………………………………………………………………………………………………… 18
7-6 Turn ON the power switch ………………………………………………………………………………………………………… 18
7-7 Adjusting the sealing height ……………………………………………………………………………………………………… 18
7-8 Adjusting the sealing angle ………………………………………………………………………………………………………… 19
7-9 Adjusting the nozzle position ……………………………………………………………………………………………………… 19
7-10 Test emergency stop system ……………………………………………………………………………………………………… 20
7-11 Connecting the vacuum pump (for only NT) …………………………………………………………………………………… 20
7-12 Vacuum gauge filter (for only NTW) ……………………………………………………………………………………………… 20
7-13 Ball cock for gas piping …………………………………………………………………………………………………………… 21
7-14 Connecting the gas cylinder and gas adjuster…………………………………………………………………………………… 21
8 Proper use of the sealer ……………………………………………………………………………… 22
Operating procedures ……………………………………………………………………………………………………………………… 23
8-1 Operation No. [01] <Sealing only>………………………………………………………………………………………………… 24
8-2 Operation No.[02] < Manual vacuuming and sealing > ……………………………………………………………………… 26
8-3 Operation No.[03] < [1 time] timer vacuuming, gas-flushing and sealing> …………………………………………………… 28
8-4 Operation No. [04] < [n times] timer vacuuming, gas-flushing and sealing > ………………………………………………… 30
Finish Operation …………………………………………………………………………………………………………………………… 33
9 Replacing the routine maintenance parts ………………………………………………………… 34
9-1 How to shift fluoro glass sheet …………………………………………………………………………………………………… 35
9-2 Fluoro glass sheet replacement …………………………………………………………………………………………………… 36
9-3 Heating element replacement……………………………………………………………………………………………………… 37
9-4 Silicone rubber replacement ……………………………………………………………………………………………………… 39
9-5 Temperature sensor module replacement ……………………………………………………………………………………… 40
9-6 Glass tape replacement …………………………………………………………………………………………………………… 41
9-7 Sarcon sheet replacement (For single-side heating type) ……………………………………………………………………… 42
10 Maintenance for parts …………………………………………………………………………………… 44
Clean the nozzle …………………………………………………………………………………………………………………………… 44
How to remove the nozzle ………………………………………………………………………………………………………………… 44
Connect and remove the tube …………………………………………………………………………………………………………… 44
4
Table of contents