Hioki TS2400 User manual

TS2400
Instruction Manual
WPT TEST SYSTEM
EN
Apr. 2019 Edition 1
SF2400A961-00 19-04H
Be sure to read this manual before using the instrument. p. 4
When using the instrument for the
rst time Troubleshooting
Parts Names and Functions p. 13 Maintenance and Service p. 91
Preparations p. 31 Error display p. 103


i
6
5
4
3
2
1
Appx.
3.9 Setting Communication between
the Measuring Instrument and the
PC...........................................................47
Setting the PC ..........................................47
3.10 Determining the Home Position of
the Stage Coordinates.........................49
3.11 Setting the Measuring Instrument ......51
Setting the power meter (When
measuring a power efciency)...................51
Setting the LCR meter (When
measuring a coupling coefcient) ..............53
Setting the Memory HiLogger (When
measuring voltage and temperature) .........55
Setting the Magnetic Field HiTester
(When measuring a eld intensity).............56
3.12 External Output and Workpiece Load57
3.13 Setting the Measured Value Warning 58
3.14 Setting Data Items to be Saved..........59
3.15 Setting the Calculation Formula .........60
3.16 Setting Labels .......................................62
3.17 Setting Real Time Data Display
Items.......................................................63
3.18 Measured Data Display Items ............64
3.19 Positioning a Workpiece......................65
3.20 Connecting the Measuring
Instrument and a Workpiece...............66
When measuring a coupling coefcient......66
When measuring a power efciency and
other items ...............................................68
3.21 Determining the Z-Axis Limit
Sensor Position.....................................69
4 Measurement 71
4.1 Manual measurement ..........................71
4.2 Automatic measurement .....................72
Creating a sub-sequence .........................74
Adding movement steps at the same time.76
5 Specications 79
5.1 Model TS2400 WPT Test System ......79
General Specications ..............................79
5.2 Model SF2400 WPT Testing
Software.................................................80
General Specications ..............................80
Function Specications .............................80
Calculation Items ......................................81
Control and Data Collection Mode
Function ...................................................81
Screen display..........................................82
Processing During Data Collection ............82
Measured Value Warning Function ............82
Contents
Measurement Workow...................................1
Introduction........................................................2
Term Description...............................................2
Product Conguration ......................................3
Options.......................................................3
Safety Notes......................................................4
Usage Notes......................................................5
Installing the Instrument...................................8
1 Overview 11
1.1 Product Overview .................................11
1.2 Features.................................................11
2 Parts Names and
Functions 13
2.1 Model SF2400 WPT Testing
Software.................................................13
License key ..............................................13
Main window.............................................13
Numerical data window .............................14
Graph window ..........................................16
2.2 Model Z5017 PLC Rack ......................22
2.3 Model Z5016 WPT Testing Platform..26
2.4 Model Z5018 Switch Box.....................29
3 Preparations 31
3.1 Connecting the Measuring
Instrument and the PC.........................31
3.2 Connecting the FT3470-51/-52
and the LR8431 ....................................32
3.3 Connecting the Z5018 to the
Z5017 and LCR Meter .........................33
3.4 Connecting the Power and Ground
Cables ....................................................34
3.5 Connecting an External Control
Instrument and the External I/O
Terminals of the Instrument.................36
3.6 Setting Up the PC (As Needed) .........37
Connection ...............................................37
Setting the security ...................................38
Setting the network ...................................39
Changing the BIOS...................................41
Installing the Model FT3470-51/-52
Magnetic Field HiTester driver ...................42
3.7 Performing Daily/Startup Checks.......44
3.8 Turning On/Off the Instrument............45
Turning on the power ................................45
Turning off the power ................................46
SF2400A961-00

ii
5.3 Model Z5015 PC System ....................83
General Specications ..............................83
5.4 Model Z5016 WPT Testing Platform..84
General Specications ..............................84
Mechanical Unit Specications ..................84
5.5 Model Z5017 PLC Rack ......................86
General Specications ..............................86
Operation/Display Unit Specications ........86
I/O Specications......................................87
5.6 Model Z5018 Switch Box.....................89
General Specications ..............................89
Input/Output/Measurement Specications..89
6 Maintenance and Service91
Calibration and repair................................91
Replacement parts and service life............91
6.1 Troubleshooting ....................................92
6.2 Cleaning...............................................100
6.3 Scheduled check (monthly)...............100
Lubrication..............................................101
6.4 Error display ........................................103
Window display when an error occurs......103
Replacing batteries for PLC and servo
pack .......................................................104
6.5 Disposing of the Instrument ..............105
Appendix Appx.1
Appx. 1 Work Table Installation
Dimensions............................. Appx.1

1
Measurement Workow
Performing Startup Checks (p. 44)
Check that there is nothing wrong with model TS2400 WPT Test System and the optional
units or accessories.
Turning On the Instrument (p. 45)
Turn on the power of the measuring instrument to be used and start up the WPT Test System.
Making Various Settings
Setting Communication between the Measuring Instrument and the PC p. 47
Determining the Home Position of the Stage Coordinates p. 49
Setting the Measuring Instrument p. 51
Setting the Measured Value Warning p. 58
Setting Data Items to be Saved (in the PC) p. 59
Setting the Calculation Formula (As necessary) p. 60
Setting Labels (As necessary) p. 62
Setting the Real Time Data Display Items p. 63
Positioning a Workpiece (p. 65)
Move the work table so that a workpiece can be easily set and secured.
Connecting the Measuring Instrument and Workpiece
When measuring a coupling coefcient
(Connect the LCR meter with a workpiece.) p. 66
When measuring a power efciency and other items
(Connect the power analyzer, etc. with a workpiece.) p. 68
Determining the Z-Axis Limit Sensor Position (p. 69)
Adjust the position of the Z-axis limit sensor according to the thickness of the workpiece to
be measured.
Performing Measurements
Manual measurement
(Measure one place at a time.) p. 71
Automatic measurement
(Measure according to the preset settings and order.) p. 72

2
Introduction
Introduction
Thank you for purchasing the Hioki TS2400 WPT Test System. To obtain maximum performance
from the instrument over the long term, please read this manual carefully, and keep it handy for
future reference.
For the safety, inspection, precautions, handling, and disposal of the optional instruments and the
Z5015 PC System, please refer to the Instruction Manuals provided with the instruments and PC.
Trademark
•Microsoft and Windows are either registered trademarks or trademarks of Microsoft Corporation
in the United States and other countries.
•SERVOPACK is the trademarks of YASKAWA Electric Corporation in the US and Japan.
Precautions during shipment
Handle it carefully so that it is not damaged due to a vibration or shock.
Target audience
This manual has been written for use by individuals who use the product in question or who teach
others to do so. It is assumed that the reader possesses basic electrical knowledge (equivalent to
that of someone who graduated from the electrical program at a technical high school).
Term Description
Term Explanation
WPT Wireless power transmission
Workpiece Indicates an evaluation target, such as a WPT coil, electrode, etc.

3
Product Conguration
Product Conguration
The conguration of the TS2400 WPT Test System (the instrument) is as follows.
Product name Description Accessories
SF2400 WPT Testing Software Measurement/control software
The latest version can be
downloaded from our website.
•Instruction manual (this
manual)
•License key (USB)
•Sample measurement data
Z5015 PC System PC •AC adapter for PC
•Display ×2
•Keyboard
•Mouse
•Instruction Manual
• Recovery media (USB ash
drive)
Z5016 WPT Testing Platform Workpiece positioning stage •Grease gun
•Grease
Z5017 PLC Rack •Stage control instrument
•Above instrument and measuring
instrument storage rack
–
Z5018 Switch Box Change of transmission and
reception coils connection method
Primary side change
Secondary side short circuit/open
–
Options
The following options are available for the instrument. Contact your authorized Hioki distributor or
reseller when ordering.
The options are subject to change. Visit our website for updated information.
Product name Description Measurement/calculation item
PW6001 Power Analyzer Measurement and
calculation
Current, voltage, active power,
frequency, voltage/current/
power phase, power factor, and
efciency
IM3570 Impedance Analyzer Measurement and
calculation
Inductance, capacity, and
DC resistance
IM3536 LCR Meter
LR8431 Memory HiLogger Measurement and
calculation
Voltage and temperature
FT3470-51, -52 Magnetic Field HiTester Measurement and
calculation
Field intensity

4
Safety Notes
Safety Notes
Using the instrument in a way not described in the Instruction Manual may negate the provided
safety features. Before using the instrument, be certain to carefully read the following safety notes:
DANGER
Mishandling during use could result in injury or death, as well as damage to the
instrument. Be certain that you understand the instructions and precautions in
the manual before use.
WARNING
With regard to the electricity supply, there are risks of electric shock, heat
generation, re, and arc ash due to short circuits. Individuals using an electrical
measuring instrument for the rst time should be supervised by a technician who
has experience in electrical measurement.
Intended users of the manual
Personnel who perform procedures described in this manual should be familiar with the instrument
and the way in which the instrument is operated.
Notation
In this document, the risk seriousness and the hazard levels are classied as follows.
DANGER Indicates an imminently hazardous situation that will result in death or serious
injury to the operator.
WARNING Indicates a potentially hazardous situation that may result in death or serious
injury to the operator.
CAUTION Indicates a potentially hazardous situation that may result in minor or moderate
injury to the operator or damage to the instrument or malfunction.
IMPORTANT Indicates information related to the operation of the instrument or maintenance
tasks with which the operators must be fully familiar.
Indicates prohibited actions.
Indicates the action which must be performed.
Boldface Indicates the names and keys on the windows in boldface.
The operation display unit and pendant unit display are indicated with [ ].
*Additional information is presented below.
Symbols afxed to the instrument
Indicates cautions and hazards. When the symbol is printed on the instrument, refer to a
corresponding topic in the Instruction Manual.
Indicates a protective conductor terminal.
Indicates that dangerous voltage may be present at this terminal.

5
Usage Notes
Usage Notes
Follow these precautions to ensure safe operation and to obtain the full benets of the various
functions. Ensure that your use of the instrument falls within the specications not only of the
instrument itself, but also of any accessories, options and other equipment being used.
Before using the instrument for the rst time
Upon delivery, check that the main unit and all necessary accessories are included in the package.
Furthermore, check that the main unit, accessories, panel switches, and terminals are all
functioning normally and that none is faulty or damaged.
WARNING
If any item is faulty or damaged, do not use the instrument in its present state.
Contact your authorized Hioki distributor or reseller.
Inspection
Before using the instrument each time, verify that it operates normally to ensure that there is no
damage.
If you nd any damage, contact your authorized Hioki distributor or reseller.
WARNING
•Tape switches are installed around the moving parts of the model Z5016 WPT
Testing Platform so that any unsafe contact is detected and the testing platform
is stopped. In addition, EMERGENCY STOP buttons are installed on the front
side and the pendant unit of the model Z5017 PLC Rack. Prior to using this
instrument, check the following. If the operation of the instrument is different
from the description below, turn off the main breaker on the front side of the
Z5017 PLC Rack and contact your authorized Hioki distributor or reseller.
1. The [EMERGENCY STOP] indicator lights up when something comes in
contact with the tape switches and the EMERGENCY STOP button is
pressed.
2. When the [READY] button is pressed when the [EMERGENCY STOP] indicator
lit, the instrument does not start up.
•Always turn off the main breaker before lubricating the axis guide and ball
screw units.
Operating environment
WARNING
Installing the instrument in inappropriate locations may cause a malfunction of
instrument or may give rise to an accident. Avoid the following locations:
•Exposed to direct sunlight or high temperature
•Exposed to corrosive or combustible gases
•Susceptible to vibration
•Exposed to water, oil, chemicals, or solvents
•Exposed to high humidity or condensation
•Exposed to high quantities of dust particles

6
Usage Notes
Wire material
WARNING
To avoid electric shock, use the recommended wire type to connect to the current
input terminals, or otherwise ensure that the wire used has sufcient current
handling capacity and insulation.
Connection of the power input terminals and external I/O terminals
WARNING
•Connect wires to the power input terminals and external I/O terminals
securely. If a terminal is loose, the contact resistance will increase, resulting in
overheating, equipment burnout, re, or malfunction.
•To avoid electric shock or damage to the instrument, always observe the
following precautions when connecting to the power input terminals or external
I/O terminals.
•Always turn off the power to the instrument and to any devices to be
connected before making connections.
•Be careful to avoid exceeding the ratings of the power input terminals and
external I/O terminals.
•During operation, a wire becoming dislocated and contacting another
conductive object can be serious hazard. Use screws to secure for the
connection to the power input terminals and external I/O terminals.
•Ensure that instruments and systems to be connected to the power input
terminals and external I/O terminals are properly isolated.

7
Usage Notes
Connection of the USB terminal
CAUTION
•To avoid equipment failure, do not disconnect the USB cable while communications
are in progress.
•Use a common ground for both the instrument and the computer. Using different
ground circuits will result in a potential difference between the instrumentʼs ground
and the computerʼs ground. If the USB cable is connected while such a potential
difference exists, it may result in equipment malfunction or failure.
Earth bar (protective conductor terminal)
WARNING
Observe the following to avoid electric shock.
•Connect the protective conductor terminal to earth (earth ground) before
making any other connections.
•Be sure to connect the protective conductor to earth (earth ground).
Handling the Z5018 Switch Box
CAUTION
To avoid damaging the measurement terminal of the LCR meter, be sure to release the
locking mechanism, and grip the head of the BNC connector (not the cord) of Model
Z5018, and pull it out.
Turning on the power
WARNING
Before turning the instrument on, make sure the supply voltage matches that
indicated on its power connector. Connection to an improper supply voltage may
damage the instrument and present an electrical hazard.

8
Installing the Instrument
Installing the Instrument
Surroundings
WARNING
There are vent holes on the model Z5017 PLC Rack to release heat. Do not
block the vent holes by placing objects around them. Doing so may cause a
malfunction of the instrument or re.
Unit: mm
Rear
Front
Z5017 top
600
1200
Main breaker
Installing the instrument
CAUTION
•Secure the adjusters in place to prevent from falling and shifting out of position.
• Improper installation may result in signicant vibration, which can cause damage to
the instrument and peripheral equipment.
• When a lift or jack is used, be sure to jack up the main unit at the specied fork
positions. Otherwise, the exterior panels may be deformed.
When moving the instrument, remove any workpieces from the instrument and position the stage at the
following position.
X-axis and Y-axis: Stroke center, Z-axis: Lowest point
Required items:
Wrench (24 mm) and level (sensitivity of 0.05 or higher)

9
Installing the Instrument
Adjuster nut
M16 nut
Adjuster
CD
BA
1
Move the instrument to the desired
installation location.
2
Loosen the M16 nuts using a 24 mm
wrench.
3
Place a level at the center of the work
table (shaded area in the gure).
4
Turn the adjuster nuts of adjusters A,
C, and D and set the adjusters on the
oor. Turn the adjuster nuts twice (720°)
in the direction in which the adjusters
stick out.
Level along the X-axis with adjusters C and D
and along the Y-axis with adjusters A and D.
5
Adjust so that the level readings are
within 5 seconds of level.
6
Tighten the M16 nuts and lock the
adjusters.

10
Installing the Instrument
7
Check that the reading of the level is
within 5 seconds.
8
With jack bolt E against the base plate,
turn it 90° in the direction in which it
approaches the base plate and then
tighten the nut to secure the jack bolt.
(Secure jack bolt E on the opposite side
as well.)
9
Secure jack bolt F in the same manner
(on the opposite side as well).
10
Secure jack bolt G in the same manner
(on the opposite side as well).
G
G
F
F
E
Jack bolt
Nut
Base plate

11
1
1Overview
1.1 Product Overview
Model TS2400 WPT Test System is an automatic measurement system
for reproducible data required for wireless power transmission (WPT)
evaluation.
One software program can control the setting of various measuring
instruments, positioning of power transmission and reception workpieces,
and data collection.
Multiple points can be measured in a short
period of time.
Various graph display and calculation
functions
Combining the above features, WPT devices can be
analyzed in detail and the evaluation man-hours can be
reduced signicantly.
1.2 Features
Automatic positioning of power transmission and reception workpieces
The workpiece position can be automatically set using the 3-axis (X, Y, and Z) control on the model
Z5016 WPT Testing Platform.
It improves the repeatability of evaluation and can reduce man-hours.
Automatic measurement data collection
The measurement data of the connected measuring instrument can be automatically collected
using the timing or period specied by the model SF2400 WPT Testing Software.
(Other settings required for measurement can also be set in the SF2400.)
Relative graph display of measurement data
The collected measurement data and workpiece position correlation can be displayed in a graphical
format. The parameters to be displayed can be arbitrarily set.
User-dened calculation function
In addition to the standard calculation items, any calculation can be dened as required.
The dened parameters can be handled in the same way as for other parameters in the model
SF2400 WPT Testing Software.
Compatible with various measuring instruments (Hioki) as the standard specication
The following Hioki measuring instruments that are required for WPT evaluation are supported as
the standard specication.
•PW6001 Power Analyzer
•IM3570 Impedance Analyzer
•IM3536 LCR Meter
• FT3470-51, -52 Magnetic Field HiTester
•LR8431 Memory HiLogger
1 Overview

12
Product Overview

13
2
2Parts Names and Functions
2.1 Model SF2400 WPT Testing Software
License key
The license key is inserted into the USB port of the PC.
Only when it is inserted, the stage and measuring instrument control is enabled.
Serial number
Serial number is tagged to the license key.
The serial number consists of 9 digits.
The rst two (from the left) indicate the year of manufacture, and the
next two indicate the month of manufacture.
Main window
The window display is set.
The measuring instrument and stage control are set.
Items selected here are displayed in the window.
Menu bar
Menu Explanation
Data File Save: Saves the measurement le.
Open: Opens the measurement le for the data to be checked. Sample measurement data of
the accessories can also be checked. (Sample.csv in the SF2400 folder in the C drive)
System Not used by the customer.
Version Displays the version of the application and PLC.
2 Parts Names and Functions

14
Model SF2400 WPT Testing Software
Numerical data window
Various numerical data can be checked.
Power Analyzer Real-Time Data
Values measured by a power meter can be checked in real time.
LCR Meter Real-Time Data
Values measured by an LCR meter can be checked in real time.
Memory HiLogger Real-Time Data
Values measured by a Memory HiLogger can be checked in real time.
Stage Position Real-Time Data
The present stage coordinates can be checked.

16
Model SF2400 WPT Testing Software
Graph window
Various numerical data can be checked in a graphical or Smith chart format.
Trend graph
The transition of each measuring instrument can be checked. Two types of trend graphs are shown
below.
The type can be switched between stack plot and overlay plot.
Stack plot
A graph is displayed for each item.
Overlay plot
Items are displayed in one graph.
Table of contents
Other Hioki Test Equipment manuals

Hioki
Hioki 3285-20 User manual

Hioki
Hioki 3665-20 User manual

Hioki
Hioki 3159 User manual

Hioki
Hioki 7016 User manual

Hioki
Hioki 3288-20 User manual

Hioki
Hioki IR4051 User manual

Hioki
Hioki 3417 User manual

Hioki
Hioki FT6381 User manual

Hioki
Hioki BT3554 User manual

Hioki
Hioki Power HiTester 3193 User manual

Hioki
Hioki 3169-20 Instruction manual

Hioki
Hioki 3441 User manual

Hioki
Hioki FT3405 User manual

Hioki
Hioki Analog MO HiTESTER Series User manual

Hioki
Hioki 3154 User manual

Hioki
Hioki 3665-20 User manual

Hioki
Hioki FT6380-50 User manual

Hioki
Hioki 3245-60 User manual

Hioki
Hioki 3290-10 User manual

Hioki
Hioki FT6031-50 User manual