X912
Place flush-mounting box in
the square hole, then mark
the four holes of
flush-mounting box on the
wall, and make sure the mark
should be in the center of
hole.
According to the position
of the cable, cut a square
hole in the wall.
(height*width*depth=26
5*116*45mm)
Step1: Flush-mounting Box Installation
Take down the flush-mounting
box then use a hand drill to
make four holes with diameter
of 6mm and depth of 25mm at
the marked positions.
Knock off the cable holes, and
through all cables out of the
holes. Then push flush-mounting
box into the square hole, and use
four ST4x20 crosshead screws to
fix flush-mounting box on the
wall.
As the figure shows, please
make sure that the top
surface of flush-mounting box
should be lined up with the
wall. And please reserve a
gap between the bottom of
flush-mounting box and wall
Insert the four plastic
wall anchors into the
holes.
The top surface line up with wall