B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal temperature,
ventilated and dry place.
C. The equipment should be unloaded and transferred by forklift.
D. SPECIFICATIONS OF CONCRETE (See Fig. 5)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 6”minimum and without reinforcing steel bars, and
must be totally dry before lift installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
(245kg/cm²) minimum.
3. Floors must be level with no cracks or holes.
E. POWER SUPPLY
The electrical source must be 3kw minimum. The source cable size must be 2.5mm²
and in good condition of contacting with floor.