manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Bradley
  6. •
  7. Bathroom Fixture
  8. •
  9. Bradley S19-120HFP User manual

Bradley S19-120HFP User manual

P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 800.BRADLEY (800.272.3539) FAX 262.251.5817
bradleycorp.com
Installation
215-148HFP Rev. K; ECN 12-05-016E
© 2012 Bradley
Page 1 of 5 8/9/2012
S19-120HFP
Frost-Proof Drench Shower
Table of Contents
Pre-Installation Information ........................ 2
Installation Instructions ........................... 3
Assembly of Components ......................... 4
Parts List ...................................... 4
P.O.BOX 309, MENOMONEE FALLS,WI53052-0309 USA
TEL:1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
2
S19-120HFP Installation
8/9/2012 Bradley฀•฀215-148HFP Rev. K; ECN 12-05-016E
IMPORTANT
Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the
installer.
Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized
shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley
plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure.
Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to ensure
compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY.
Product warranties and parts information may also be found under ”Products” on our
web site at www.bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List

P.O.Box309, Menomonee Falls,WI 53051
R
TESTTHISUNIT EACHWEEK
Test-operatevalve(s) each week and sign below.
Reportany malfunctions immediately.
Ventil(e)wöchentlich imTestbetrieb prüfen, bestätigt
durchUnterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESESGERÄT1ST WÖCHENTLICH ZU PRÜFEN.
ESSAIHEBDOMADAIRE
Testle fonctionnement des valves chaque semaine et
signeen bas. S'il y à quelque chose qui ne va pas fait
unrapport immédiatement.
P.O.BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL:1-800-BRADLEY FAX:(262-251-5817)
http://www.bradleycorp.com
114-051
3
Installation S19-120HFP
Bradley฀•฀215-148HFP Rev. K; ECN 12-05-016E 8/9/2012
Installation
Supplies Required:
Teflon tape and pipe sealant
Miscellaneous piping (refer to
dotted lines)
Piping to 1" NPT water supply
inlet and 1/4" NPT female
weep connection
Adequate supply pipe supports
Minimum 4" drain to
accommodate 30 gallons per
minute discharge for shower
waste
OPTIONAL: sign-mounting
hardware
Step 1: Assemble
components
1. Assemble the components as
shown on page 4.
Apply pipe sealant to all
male-threaded pipe joints.
Use a strap wrench around
pipes when tightening to
prevent marring.
Bottom edge of
showerhead should be
7'-0" (2134 mm) from the
floor.
Step 2: Install operating
stem support sleeve
This unit has been designed to accommodate varying wall thicknesses. When installing the operating stem support sleeve it
will be necessary to cut off one or both ends of the sleeve so that 5/8” of threaded pipe protrudes from both sides of the wall.
1. Connect water supply piping to 1" NPT inlet on unit (piping supplied by installer). Provide adequate
supports (supplied by installer) for supply pipe using pipe hangers or other means.
2. Hang the safety sign from the unit with the curtain hooks provided (or mount it to the wall using sign-
mounting hardware by installer).
3. Open water supply lines. Test for leaks and adequate water flow.
Step 3: Connect water supply
Do not rely on Bradley’s Drench Shower to support supply piping.
1. Connect water supply piping to 1" NPT inlet on unit (piping supplied by installer). Provide adequate
supports (supplied by installer) for supply pipe using pipe hangers or other means.
2. Connect drain piping (supplied by installer) to the 1-1/4” NPT female weep connection.
3. Hang the safety sign from the unit with the curtain hooks provided (or mount it to the wall using sign-
mounting hardware by installer).
24"
(610mm)
All dimensions assume standard thread engagement.
Variations in manufacturing allow for +/- 1/8"
(3mm) per threaded joint. To find the tolerance of a
dimension, add the number of thread joints in between
a dimension and multiply it by 1/8" (3mm).
4" (102mm)
minimum will
increase with
change in wall
thickness
2-5/8"
(67mm)
7'-0"
(2134mm)
to Floor
Ø 3.1"
(78.7mm)
3-1/2"
(89mm)
4-1/2"
(114mm)
6-1/4"
(159mm)
1-3/4"
(44mm)
Ø 1"
(25mm) Hole
36"
(914mm)
to Floor
Ø 1-3/8" (35mm)
Hole
S19-120HFP8
(0"−8" wall)
S19-120HFP12
(8"−12" wall)
S19-120HFP18
(12"−18" wall)
4
S19-120HFP Installation
8/9/2012 Bradley฀•฀215-148HFP Rev. K; ECN 12-05-016E
Assembly of Components
Parts List
4
3
P.O. Box 309, Menomonee Falls,WI 53051
R
TESTTHIS UNIT EACH WEEK
Test-operate valve(s)each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich imTestbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1STWÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnementdes valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS,WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX:(262-251-5817)
http://www.bradleycorp.com
114-050
8
9
5
6.1
7.1
7.8
7.8
2
6
7.6
7.5
7.12
1
7.7
7.11 7.2
7.3
7.3
7.4
7.6
7.5
7.10
7.9
114-063
P.O.BOX309,MENOMONEE FALLS,WI53052-0309 USA
TEL:1-800-BRADLEY FAX:(262-251-5817)
www.bradleycorp.com
1.1
1" NPT
Supply Inlet
NOTE: Use
teflon tape
only.
Item Part No. Qty. Description
1 S27-278 1 Stay-Open Ball Valve 1" NPT w/
Nut
1.1 110-214 1 Nut only
2 113-006NN 1 Pipe 1/2" NPT (0"–8")
113-006NR 1 Pipe 1/2" NPT (8"–12")
113-006NU 1 Pipe 1/2" NPT (12"–18")
3 169-847 1 90° Elbow 1" NPT
4 S24-188 1 Plastic Showerhead Assembly
5 151-001 2 Curtain Hook
6 S21-067 1 (0"–8") Operating Stem
S21-067A 1 (8"–12") Operating Stem
S21-067B 1 (12"–18") Operating Stem
6.1 132-042 2 Retaining Ring
7 S45-458 1 HFP Fittings
7.1 S08-308 1 Handle Assembly
Item Part No. Qty. Description
7.2 S29-068 1 Weep Valve Assembly
7.3 124-001CB 2 Washer
7.4 110-115 1 Nut
7.5 142-002BK 2 Lockwasher
7.6 161-036 2 Hex Nut
7.7 169-025 1 90° Street Elbow 1/2" NPT
7.8 110-191 2 Connector Nut
7.9 113-006LN 1 Pipe
7.10 128-141 1 Handle
7.11 169-840 1 Tee, Reducing
7.12 140-720 1 Stop Bracket
8 114-051 1 Safety Sign
9 204-421 1 Emergency Inspection Tag

Other Bradley Bathroom Fixture manuals

Bradley OmniDeck 4000 Series User manual

Bradley

Bradley OmniDeck 4000 Series User manual

Bradley S19-310 User manual

Bradley

Bradley S19-310 User manual

Bradley S19274HWR User manual

Bradley

Bradley S19274HWR User manual

Bradley SXWS9151 User manual

Bradley

Bradley SXWS9151 User manual

Bradley Vernatherm S59-4004 User manual

Bradley

Bradley Vernatherm S59-4004 User manual

Bradley 5600 Series User manual

Bradley

Bradley 5600 Series User manual

Bradley Verge LVA Series User manual

Bradley

Bradley Verge LVA Series User manual

Bradley Verge LVSD2 User manual

Bradley

Bradley Verge LVSD2 User manual

Bradley S19-310SS User manual

Bradley

Bradley S19-310SS User manual

Bradley Aerada 1200 Series User manual

Bradley

Bradley Aerada 1200 Series User manual

Bradley Express SS Series User manual

Bradley

Bradley Express SS Series User manual

Bradley OmniDeck 3000 Series User manual

Bradley

Bradley OmniDeck 3000 Series User manual

Bradley 600 Series User manual

Bradley

Bradley 600 Series User manual

Bradley S19-125BF User manual

Bradley

Bradley S19-125BF User manual

Bradley SXWS9557FM User manual

Bradley

Bradley SXWS9557FM User manual

Bradley CBSHWR9000 User manual

Bradley

Bradley CBSHWR9000 User manual

Bradley Halo S19314EW User manual

Bradley

Bradley Halo S19314EW User manual

Bradley LVA Series User manual

Bradley

Bradley LVA Series User manual

Bradley Express SS Series User manual

Bradley

Bradley Express SS Series User manual

Bradley WS-1X-HN User manual

Bradley

Bradley WS-1X-HN User manual

Bradley TouchTime 1C User manual

Bradley

Bradley TouchTime 1C User manual

Bradley HN300 User manual

Bradley

Bradley HN300 User manual

Bradley HN-250 User manual

Bradley

Bradley HN-250 User manual

Bradley Terreon Deep Bowl TDB3100 Series User manual

Bradley

Bradley Terreon Deep Bowl TDB3100 Series User manual

Popular Bathroom Fixture manuals by other brands

Anzzi CRANE Series install guide

Anzzi

Anzzi CRANE Series install guide

TECHLIGHTING GIA MIRROR KIT installation instructions

TECHLIGHTING

TECHLIGHTING GIA MIRROR KIT installation instructions

NewLine Raymor RAY1200CHR instruction manual

NewLine

NewLine Raymor RAY1200CHR instruction manual

Delta B23565-6032 Series manual

Delta

Delta B23565-6032 Series manual

RamonSoler 3333T Mounting instructions

RamonSoler

RamonSoler 3333T Mounting instructions

Delta 2520LF-A installation instructions

Delta

Delta 2520LF-A installation instructions

HOME NETWERKS 75-101-BT manual

HOME NETWERKS

HOME NETWERKS 75-101-BT manual

Delta 501M-DST manual

Delta

Delta 501M-DST manual

PotteryBarn Covington Pressure Balance Shower Trim and Hand Shower... quick start guide

PotteryBarn

PotteryBarn Covington Pressure Balance Shower Trim and Hand Shower... quick start guide

Etac Rufus plus manual

Etac

Etac Rufus plus manual

Delta Kami 581LF installation instructions

Delta

Delta Kami 581LF installation instructions

Delta Windemere B3596LF-SS manual

Delta

Delta Windemere B3596LF-SS manual

Delta 25840LF installation instructions

Delta

Delta 25840LF installation instructions

NewLine Ravello instruction manual

NewLine

NewLine Ravello instruction manual

Delta Victorian 754LF-RB-R quick start guide

Delta

Delta Victorian 754LF-RB-R quick start guide

Delta Modern 573LF-GPM-PP quick start guide

Delta

Delta Modern 573LF-GPM-PP quick start guide

mr. steam Butler Installation, operation & maintenance manual

mr. steam

mr. steam Butler Installation, operation & maintenance manual

Delta Cassidy 3597LF quick start guide

Delta

Delta Cassidy 3597LF quick start guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.