Nibe KVR 10 User guide

Installer manual
Condensation water pipe
KVR 10
LEK
IHB EN 2216-4
431740


41 Important information
4Safety information
4Symbols
4Marking
52 General
5Different versions of KVR 10
73 Pipe connections
7General
7Drain indoors
8Stone caisson
8Gutter drainage
94 Electrical connection
9F2016 / F2026
11F2030 / F2300
13F2040
21F2050
25NIBE SPLIT HBS 05 / HBS 20
31Contact information
3Table of ContentsKVR 10
Table of Contents

Safety information
This manual describes installation and service procedures
for implementation by specialists.
The manual must be left with the customer.
This appliance can be used by children
aged from 8 years and above and per-
sons with reduced physical, sensory or
mental capabilities or lack of experience
and knowledge if they have been given
supervision or instruction concerning use
of the appliance in a safe way and under-
stand the hazards involved. Children shall
not play with the appliance. Cleaning and
user maintenance shall not be made by
children without supervision.
This is an original manual. It may not be
translated without the approval of NIBE.
Rights to make any design or technical
modifications are reserved.
©NIBE 2022.
Symbols
Explanation of symbols that may be present in this manual.
NOTE
This symbol indicates danger to person or machine.
Caution
This symbol indicates important information about
what you should consider when installing or servi-
cing the installation.
TIP
This symbol indicates tips on how to facilitate us-
ing the product.
Marking
Explanation of symbols that may be present on the product’s
label(s).
Read the Installer Manual.
KVR 10Chapter 1 | Important information4
Important information

The accessory KVR 10 is used to safely divert most of the
condensation from the air/water heat pump to a frost-free
collection point.
The accessory is suitable to following products from NIBE:
•• F2050F2016
• •F2026 F2300
•• NIBE SPLIT HBS 05F2030
• •F2040 NIBE SPLIT HBS 20
NOTE
It is important to the heat pump function that
condensation water is led away and that the drain
for the condensation water run off is not posi-
tioned so that it can cause damage to the house.
The heating cable starts automatically at an outdoor temper-
ature of 1.5 °C. When the temperature exceeds 2 °C the
heating cable switches off again.
NOTE
The installation of KVR 10 can affect the machine’s
function. Read the entire Installer Manual together
with the main product’s Installer Manual!
Different versions of KVR 10
KVR 10 is available in three lengths. Here you can see an example of the installation length.
Installationslängd
Installation length
5Chapter 2 | GeneralKVR 10
General

F2016, F2026, F2030, F2040, F2050, F2300, NIBE SPLIT HBS 05 / HBS 20
KVR 10 2x230VKVR 10
Part No.Part No.
067 615067 614Hose length 1 metre (installation length 1 m without water seal)
067 617067 616Hose length 3 metres (installation length 1-2.2 m with water seal)
067 619067 618Hose length 6 metres (installation length 2.2-5.2 m with water seal)
CONTENTS
Insulated hose (inner diameter 40 mm)1 x
Heating cable1 x
Hose clamp1 x
Fuse1 x
Gasket1 x
Cable ties6 x
Screw1 x
Nuts1 x
Washers2 x
Connection piece1 x
Automatic protection (only used for F2040 / F2050 and AMS 10 / AMS 20)1 x
Plug (only used for F2040 / F2050 and AMS 10 / AMS 20)14 x
Connection plate (only used for AMS 10-6 / AMS 20-6)1 x
KVR 10Chapter 2 | General6

General
Connect KVR 10 to the heat pump's condensation water
trough using the supplied hose clamp.
•Pipe installation must be carried out in accordance with
current norms and directives.
•We recommend three ways of leading off condensation
water; to an indoor drain (subject to local rules and regu-
lations), stone caisson, gutter drainage or other frost free
collection point.
•When casting the base, the holes for KVR 10 must have
an internal diameter of 110 mm.
•Route the pipe downward from the air/water heat pump.
•The insulation of KVR 10 must seal against the bottom of
the product's condensation water trough.
•The drain from KVR 10 must be positioned at frost free
depth or indoors (subject to local rules and regulations).
•The drain from KVR 10 must be able to receive up to
100 litres of condensation water per day.
•The installation must be equipped with a water seal where
air circulation can occur in the condensation water pipe.
Drain indoors
Water seal
The condensation water is lead to an indoor drain (subject
to local rules and regulations).
Route the pipe downward from the air/water heat pump.
The condensation water pipe must have a water seal to
prevent air circulation in the pipe.
Pipe routing indoors is not included.
NOTE
Do not select this option, "Indoor drain", if you have
an air/water heat pump with a flammable or easily
combustible refrigerant.
7Chapter 3 | Pipe connectionsKVR 10
Pipe connections

Stone caisson
LEK
Frostfritt djup
Frost proof
depth
If the house has a cellar the stone caisson must be posi-
tioned so that condensation water does not affect the house.
Otherwise the stone caisson can be positioned directly under
the heat pump.
The outlet of the condensation water pipe must be at frost
free depth.
Gutter drainage
NOTE
Bend the hose to create a water seal, see illustra-
tion.
LEK
Frostfritt
djup
Water seal
Frost free
depth
Water seal
LEK
From air/water heat
pump
•The outlet of the condensation water pipe must be at frost
free depth.
•Route the pipe downward from the air/water heat pump.
•The condensation water pipe must have a water seal to
prevent air circulation in the pipe.
•The installation length can be adjusted by the size of the
water seal.
KVR 10Chapter 3 | Pipe connections8

NOTE
All electrical connections must be carried out by
an authorised electrician.
F2016 / F2026
F2016 / F2026 is equipped with a terminal block (X3) for a
heating cable. The connection is fitted with a 250 mA fuse
at the factory.
FUSE LOCATION
LEK
LEK
F3
X3
Fuse
Part No.Fuse (F3)Ptot (W)Length,
heating
cable (m)
718 085T100mA/250V151
518 900*T250mA/250V453
718 086T500mA/250V906
*Fitted at the factory.
ELECTRICAL CONNECTION
Connect external heating cable (EB14) to terminal block X3:1
and 4 as illustrated below:
5 6 742 31
F2016/F2026
X3
EB14
Heating
cable
F3
KVR10
9Chapter 4 | Electrical connectionKVR 10
Electrical connection

Cable routing F2016 / F2026
The following image shows the recommended cable routing
from distribution box to condensate drain pan in
F2016 / F2026. Transition between electrical cable and
heating cable must be as illustrated.
1. Remove cover.
2. Thread hose clamp on.
3. Route the heating cable through the condensation water
pipe.
4. Remove the condensation water trough.
5. Route the heating cable through the condensation water
connection and lead-in.
6. Pull the insulation down slightly, connect the hose to
the condensation water connection and tighten the
hose clamp.
7. Push the insulation up towards the trough and install it
using cable ties.
8. Lay the heating cable so that the marking is as close to
the condensation water connection as possible.
9. Route the cable to the distribution box as illustrated.
(Extend the cable so that removal of the condensation
water trough is possible, i.e. with some margin.)
10. Use factory fitted cable tie.
11. The distance between the distribution box and the lead-
in to the condensation water trough is approx.
2,000 mm.
12. The length of the non heat conducting section of the
cable needs adjusting. Roll the cable to the correct
length (do not cut).
13. Connect the cable according to the "Electrical connec-
tion" image. (Check fuse according to table. See Fuse
page 11.)
14. Reinstall the condensation water trough and cover.
NOTE
Ensure that the marking on the cable is edge to
edge with the drain (see image).
NOTE
Do not cut the heating cable!
LEK
Drain spout
Marking
Lead in
Heating cable
KVR 10Chapter 4 | Electrical connection10

F2030 / F2300
F2030 / F2300 is equipped with a terminal block (X3) for a
heating cable. The connection is fitted with a 250 mA fuse
at the factory.
FUSE LOCATION F2030
F3
X3
FUSE LOCATION F2300
F3
X3
Fuse
Part No.Fuse (F3)Ptot (W)Length,
heating
cable (m)
718 085T100mA/250V151
518 900*T250mA/250V453
718 086T500mA/250V906
*Fitted at the factory.
ELECTRICAL CONNECTION
Connect external heating cable (EB14) to terminal block X3:4
and 7 as illustrated below:
1
2
3
4
5
6
7
KVR10F2030/F2300
X3
EB14
Heating cable
F3
11Chapter 4 | Electrical connectionKVR 10

Cable routing F2030 / F2300
The following image shows recommended cable routing
from distribution box to condensation water trough in
F2030/F2300.. Transition between electrical cable and
heating cable must occur according to image.
1. Remove side panel.
2. Thread hose clamp on.
3. Route the heating cable through the condensation water
pipe.
4. Remove the condensation water trough.
5. Route the heating cable through the condensation water
connection and lead-in.
6. Pull the insulation down slightly, connect the hose to
the condensation water connection and tighten the
hose clamp.
7. Push the insulation up towards the trough and install it
using cable ties.
8. Reinstall condensation water trough.
9. Stretch the heating cable so that the mark is as illus-
trated.
10. Route the cable to the distribution box as illustrated.
(Extend the cable so that removal of the condensation
water trough is possible, i.e. with some margin.)
11. Use cable ties to secure the heating cable.
12. The distance between the distribution box and the lead-
in to the condensation water trough is approx.
2,600 mm.
13. Connect the cable according to the "Electrical connec-
tion" image. (Check fuse according to table. See Fuse
page 11.)
14. Reinstall side panel.
LEK
Marking
Lead in
KVR 10Chapter 4 | Electrical connection12

F2040
KVR 10 is connected to the communication board AA23-
X1:4-6 in F2040. Communication board (AA23) is fitted with
a 250 mA fuse.
FUSE LOCATION
Främre el
Bakre el
LEK LEK
Främre el
Bakre el
LEK LEK
F3
AA23
Fuse
Part No.Fuse (F3)Ptot (W)Length,
heating
cable (m)
718 085T100mA/250V151
518 900*T250mA/250V453
718 086T500mA/250V906
*Fitted at the factory.
ELECTRICAL CONNECTION
The external heating cable (EB14) is connected to terminal
block (X1:4–6) as illustrated below:
5 642 31
KVR10 F2040
X1
EB14
External heat cable
AA23
F3
F2040-6
Connection of residual current device RCD (FB1) between control board (PWB1) and communication board (AA23-X1:1-3).
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
AA23-X1
FB1
230V
230V 2AC
FB1
FB1
LEK
AA23-X1
13Chapter 4 | Electrical connectionKVR 10

F2040-8
Connection of residual current device RCD (FB1) between control board (PWB1) and communication board (AA23-X1:1-3).
230V/230V 2 AC
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
AA23-X1
FB1
230V
230V 2AC
FB1
FB1
AA23-X1
LEK
KVR 10Chapter 4 | Electrical connection14

F2040-12, version 1
Connection of earth leakage circuit breaker (FB1) between terminal block (X1) and communication board (AA23-X1:1-3).
230V/230V 2 AC
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
AA23-X1
X1
FB1
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
230V 230V 2AC
FB1 FB1
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
AA23-X1
X1
15Chapter 4 | Electrical connectionKVR 10

F2040-12, version 2
Connection of residual current device RCD (FB1) between control board (PWB1) and communication board (AA23-X1:1-3).
230V/230V 2 AC
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
AA23-X1
FB1
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
230V 230V 2AC
FB1 FB1
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
AA23-X1
KVR 10Chapter 4 | Electrical connection16

F2040-16
Connection of residual current device RCD (FB1) between control board (PWB1) and communication board (AA23-X1:1-3).
230V/230V 2 AC
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
AA23-X1
FB1
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
230V 230V 2AC
FB1 FB1
LEK
LEK
LEK
LEK
LEK
LEK
LEK
LEK
16kW12kW12kW 230V old8kW
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
230V
230V 2 AC
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
1/2 N
2/1 N
1/2 3/4
4/3
2/1
AA23-X1
17Chapter 4 | Electrical connectionKVR 10

Cable routing F2040
The following image shows recommended cable routing
from the electrical connection to the condensation water
pipe. Route the heating cable (EB14) through the grommet
on the underside and secure with two cable ties at the
electrical connection. There is a transition between the cold
and hot sections of the heating cable at the marking on the
cable. The marking has to be edge to edge with the hole for
the cable grommet.
1. Remove the front and side panels.
2. Remove the rear cover plate from the stand.
LEK
LEK
DATA
DATA
3. Pull off the protective paper and secure the gasket to
the condensation water connection, see image.
4. Thread hose clamp on.
5. Route the heating cable through the condensation water
pipe.
6. Route the heating cable through the condensation water
connection on the connection plate, as illustrated.
LEK
1.
2.
3.
7. Pull the insulation down slightly, connect the hose to
the condensation water connection and tighten the
hose clamp, as illustrated.
LEK
1.
2.
3.
8. Push the insulation up towards the trough and secure
it using cable ties, see image.
LEK
1.
2.
3.
KVR 10Chapter 4 | Electrical connection18

9. For F2040-6, screw the connection piece securely to
the stand as illustrated using a screw and washer. Now
clamp the gasket between the adapter and the bottom
of the module.
F2040-6
For F2040-8/12/16, loosen the nut and remove the
washer securing the heat pump module to the stand.
Fit the holder to the module’s foot and reinstall the
washer and nut. Now clamp the gasket between the
adapter and the bottom of the module. When the drain
holes have been adjusted above each other, tighten the
nut.
F2040-8, F2040-12, F2040-16
10. Lay the heating cable and ensure that the marking on
the heating cable is as close to the condensation water
connection as possible.
11. Route the heating cable to the electrical connection.
12. Use cable ties and strap anchors to secure the heating
cable, see images.
LEK
Strap anchors
LEK
Heating cable (EB14)
Secure the heating
cable (EB14) here
using two cable ties.
13. Connect the cable as illustrated in "Electrical connec-
tion", see page 13. (Check the fuse according to the
table, see page 13.)
14. Reinstall the cover, front and side panels.
19Chapter 4 | Electrical connectionKVR 10

15. Install plugs, see image.
F2040-6
F2040-8, F2040-12, F2040-16
LEK
KVR 10Chapter 4 | Electrical connection20
Other manuals for KVR 10
2
Table of contents
Other Nibe Heat Pump Accessories manuals