Measurement Pass
VAC < 4 VAC T-R, T-G, R-G
VDC < 3 VDC T-R, T-G, R-G
Circuit Resistance
(Leakage)
> 3500 kOhm T-R,T-G, R-G
Capacitive Balance > 95%
Longitudinal Balance > 55 dB
Load Coil 0
3. Verify the Tests pass.
4. If any test fails, press cancel and run that individual test.
Descriptions of tests are located in Section 9.
5. 9.1 Copper Tests
6. To rerun the test press Start.
7. Press System Tray, and then press Save Report.
4.1 OneCheck Copper (continued)
VAC of AC is often due to
induction from the AC grid.
Visually inspect jumpers, and terminal connections. Open
Pair at terminal, run test towards VRAD and Cus-
tomer Prem. If problem is on drop trouble trouble-
shoot, if on the F2 get a helper ticket.
VDC Cross Battery is an indication of contact between
test pair and another working circuit
Visually inspect jumpers, and terminal connections. Open
Pair at terminal, run test towards VRAD and Cus-
tomer Prem. If problem is on drop trouble trouble-
shoot, if on the F2 get a helper ticket.
Circuit Resistance
(Leakage)
Resistive fault shorts /grounds test pair is in con-
tact with ground or Tip and Ring are in contact
with each other. Low resistance (<100 Ohm) con-
nections across tip and ring can be located with
Distance to Short measurement.
Visually inspect jumpers, and terminal connections. Open
Pair at terminal, run test towards VRAD and Cus-
tomer Prem. If problem is on drop trouble trou-
bleshoot, if on the F2 get a helper ticket.
Opens
(Loop Length)
Loop Length determines if pair is too long to sup-
port digital service or is longer than your cable
records show.
Visually inspect jumpers, and terminal connections. Open
Pair at terminal, run test towards VRAD and Cus-
tomer Prem. If problem is on drop trouble trou-
bleshoot, if on the F2 get a helper ticket.
Capacitive
Balance
Capacitive balance is an indication of conductor
length differences. Failures can be the result of
open or partially open conductors
Visually inspect jumpers, and terminal connections.
Open Pair at terminal, run test towards VRAD
and Customer Prem. If problem is on drop
trouble troubleshoot, if on the F2 get a helper
ticket.
Longitudinal Balance Pair Balance is the measurement of overall pair
quality values < 60 dB indicate physical trouble
Visually inspect jumpers, and terminal connections. Open
Pair at terminal, run test towards VRAD and Cus-
tomer Prem. If problem is on drop trouble trou-
bleshoot, if on the F2 get a helper ticket.
Load Coil Detect the presence of Load coils on the pair Remove load coil
Return to table of contents