6Twin manual | Version 2.0 | December 2017
ENGLISH
TABLE OF CONTENTS DECLARATION OF CONFORMITY
1 Safety and usage instructions 7
1.1 Purpose and intended audience 7
1.2 General safety 7
2 Product 8
2.1 The charging station 8
2.2 Status indications on the interface 9
2.3 Using the charging station 10
2.4 Technicalspecications 11
2.4.1 Twin 2017 model overview 11
2.4.2 Input / power supply 12
2.4.3 Output / vehicle connection 12
2.4.4 Protection / integrated components 12
2.4.5 Charging and access 13
2.4.6 Operating conditions 13
2.4.7 Casing 14
2.5 Optional factory settings 14
2.6 Accessories 14
3 Installing and connecting 15
3.1 Installing and connecting 15
3.2 Mounting and installation requirements 16
3.3 Mechanical installation 16
3.4 Installation 17
3.5 Electrical installation 18
4 Commissioning the charging station 19
4.1 Safety instructions prior to usage 19
4.2 Commissioning 19
5 Connectivity 20
5.1 Administration systems 20
5.2 Establishing a connection 20
5.2.1 Wireless connection 20
5.2.2 UTP (Ethernet) connection 20
5.3 Registering your ICU EZ account 21
5.4 Registering your charging station
within your own administration system 21
Manufacturer:
Alfen ICU B.V.
Herugweg28
1332 AP Almere
The Netherlands
The undersigned, as Director of Alfen, hereby
declares that the following product:
TWIN 4XL charging station equipped with 6mA DC detection
To which this declaration applies, complies with:
1) The provisions of the low voltage directive 2014/35/EU
2) The provisions of the EMC guideline 2014/30/EU
3) The following harmonized standards:
•NEN-EN-IEC 61851-1 (2010) – electric vehicle conductive
charging system – General requirements;
•NEN-EN-IEC 61851-22 (2001) – electric vehicle conduc-
tive charging station - AC electric vehicle charging station
As proof of this compliance the products are labelled with the
CE mark and I have signed this declaration.
Almere, the Netherlands, 18 September 2017.
Dipl.-Ing. M. Roeleveld