
You need to ship your original terminal and charging cables back using the
packaging and mailing label provided.
REMINDER
ePAYP2PE_PAXS920QRGRedeployment071019
What’s included:
Connecting your terminal:
S920 charging cable Charging dock and power cord*
*This must be added on to your original order. Additional fees will apply.*
To charge your terminal you can either:2.
• You will also need to charge your
charging dock with the power
cord included.
• Place it on the charging dock.• Connect it to the charging cable.
OR
1. Verify your bag number in your ePAY portal https://epay.jtpyportal.com to
ensure you have received the correct terminal. For more information on where to
conrm your bag number, please refer to page 9 on our P2PE Instruction Manual
(PIM), which can be found at: https://www.jetpay.com/pim.
Note: Before proceeding, please ensure your S920 packaging has not been tampered with.
Point to Point Encryption (P2PE)
Immediate data encryption keeping your clients data secure.
Technical Requirements:
• Standard 110 volt power outlet
• An ethernet switch port for each device
• A xed IP address on your internal network that is reachable from the workstation
that will be used for payment processing