
►www.tmgindustrial.com 1/12 TOLL FREE:1-877-761-2819
MAIN SPECIFICATIONS :
Overall assembled size : W12 x L12 x H4.5 (m) / W40 x L39.37 x H15 (ft)
Width : 12 m / 39.37ft
Length : 12 m / 39.37ft
Ridge peak height : 4.5 m / 15ft + container height
Shoulder wall clearance height : 1.05m / 3.4ft
PRIOR TO ASSEMBLY
Please read the instructions carefully before installation. It is very important to follow your local safety
regulations and industry standards during installation. Regulations may include but are not limited to:
-
Safety helmets, protective eyewear, and clothing
-
Safety harnesses for all elevated workers
-
Proper ladder, cage, and safety operation
Check all components and parts before installation. All parts are marked with a part number, please refer to the
parts list to make sure you have all parts.
Choose a day with low or no wind to install, assembly is hard in heavy wind. Do not make any alterations to the structure.
Do not hang any weights on the frame during installation, including parts. We are not responsible for any damages or
injuries caused by inappropriate installation, unauthorized modifications or extreme weather.
This building is not intended for human occupancy.
It is recommended to tape or add foam/rubber on the frame where joints connect and where it touches the cover. This
will help extend the life span of the cover.
Read the following item list carefully and count the number of items to ensure that all parts are included prior to setup.
INSTALLATION STEPS
REVIEW THE WHOLE STRUCTURE AND CHOOSE THE PROPER INSTALLATION SITE
Choose a solid flat level ground area to set up the building. Do not install the building on soft ground, wetland, uneven
surfaces, sloped surfaces, or on top of structures that are not rated to hold its weight.
We strongly recommend that you put the containers on hard foundations before installing the shelter.
Be aware of the surrounding area. Do not set up the building near snowdrifts, open flames or exposed electrical wires. Do
not keep heat sources near the fabric cover. Keep the building surroundings clear at all times.
Check the parts list below to make sure all parts are received prior to assembly.