TMG TMG-SCE20 User manual

►www.tmgindustrial.com 0/16 TOLL FREE:1-877-761-2819

►www.tmgindustrial.com 1/16 TOLL FREE:1-877-761-2819
INSTALLATION STEPS
PRIOR TO ASSEMBLY
Please read the instructions carefully before installation. It is very important to follow your local safety regulations and
industry standards during installation. Regulations may include but are not limited to:
•
Safety helmets, protective eyewear, and clothing
•
Safety harnesses for all elevated workers
•
Proper ladder, cage, and safety operation
Check all components and parts before installation. All parts are marked with a part number, please refer to the parts
list to make sure you have all parts.
Choose a day with low or no wind to install, assembly is hard in heavy wind. Do not make any alterations to the structure.
Do not hang any weights on the frame during installation, including parts. We are not responsible for any damages or
injuries caused by inappropriate installation, unauthorized modifications or extreme weather.
This building is not intended for human occupancy.
It is recommended to tape or add foam/rubber on the frame where joints connect and where it touches the cover. This
will help extend the life span of the cover.
Read the following item list carefully and count the number of items to ensure that all parts are included prior to setup.
STEP 1: REVIEW THE WHOLE STRUCTURE AND CHOOSE THE PROPER INSTALLATION SITE.
Choose a solid flat level ground area to set up the building. Do not install the building on soft ground, wetland, uneven
surfaces, sloped surfaces, or on top of structures that are not rated to hold its weight.
We strongly recommend that you put the containers on hard foundations before installing the shelter.
Be aware of the surrounding area. Do not set up the building near snowdrifts, open flames or exposed electrical wires.
Do not keep heat sources near the fabric cover. Keep the building surroundings clear at all times.
Check the parts list below to make sure all parts are received prior to assembly.
MATERIALS PART LIST
PARTS CODE GRAPHICAL DESCRIPTION LENGTH QTY
1-1
window 930x1110mm
7

►
www.tmgindustrial.com
1-2
2-1
2-2
2-3
2-4
2-5
2-6
2-7
2-8
www.tmgindustrial.com
2/16
TOLL FREE:1
window 930
x
concave line 50x50
x2240
Color Steel Plate u-shaped
groove
110x170x2240
PVC Corner Covering
100x2300
Bamboo fiber angle line 80x
2000mm
Bamboo fiber angle line
internal angle buckle
Bamboo fiber angle line
external angle buckle
PVC Corner end Buckle
Bamboo fiber angle wire
connecting buckle
TOLL FREE:1
-877-761-2819
x
800mm 1
x2240
mm 8
110x170x2240
m
m 1
100x2300
mm 3
2000mm
30
/ 18
/ 2
/ 20
/ 20

►
www.tmgindustrial.com
2-9
2-10
2-11
3-1
3-2
4-1
4-2
4-3
www.tmgindustrial.com
3/16
TOLL FREE:1
Bamboo fiber angle wire
fixing buckle
Metal buckle plate
200*3000*0.8mm
L type cupboard
(①: Includes 1 double basin
vegetable washing basin, 1
set of faucets, 2 800mm
long inlet pipes. Equipped
with 1 set of drainage
pipes. ②: Quartz stone
panel, ray+door panel, 3
drawers)
(
2200
*550*900mm
Industrial plug
Light Lampshade + lamp
tube
15WLED
50PVC tube Φ
50mm
PVC glue
Raw Belt
TOLL FREE:1
-877-761-2819
/ 28
200*3000*0.8mm
4
2200
+1400)
*550*900mm
1 set
/ 1
15WLED
4 set
50mm
2m
1
1

►
www.tmgindustrial.com
4-4
5-1
6-1
6-2
6-3
6-4
6-5
6-6
6-7
6-8
www.tmgindustrial.com
4/16
TOLL FREE:1
Valve
Movable partition wall
weatherproofing sealant
unfolding roof and roof
White T-shaped rubber strip
L
=
Circular Slit
40x2700mm
White D-shaped rubber strip
L=22meters
Flat tape Slants thin
L=22meters
Waterproof Tape
(Used for: such as roof leak
repair)
L=
80#x
Hexagonal self tapping
screw (Used for: gable and
side wall connection)
Φ
4.2L=25mm
Hexagonal self tapping
screw (Used for: door and
window installation)
Φ
4.2L=50mm
TOLL FREE:1
-877-761-2819
2
1
/ 3
=
22m 1
40x2700mm
4
L=22meters
L=22meters
80#x
40meters
4.2L=25mm
50
4.2L=50mm
50

►
www.tmgindustrial.com
6-9
6-10
6-11
6-12
6-13
6-14
6-15
6-16
6-17
www.tmgindustrial.com
5/16
TOLL FREE:1
Hexagonal self tapping
screw (Used for: connecting
the top, side walls, and gable
walls)
Φ
4.2 L=125mm
Cross Self-tapping screw
(Used for: Foot guard board)
Φ
4.2 L=
Big Cap Self-tapping Nail
(Used for: fixing flat
aluminum strips, connecting
gable and side walls)
Φ
4.2 L=
Rivet Φ
4.8 L=17mm
Stabilizer Blade M16,
L=175mm
Drill
Φ
Phillips Screwdriver Head
Glue Gun
Hexagon Socket
M8
TOLL FREE:1
-877-761-2819
4.2 L=125mm
100
4.2 L=
35mm 100
4.2 L=
27mm 100
4.8 L=17mm
100
L=175mm
6
Φ
4.2 1
/
/ 1
M8
1

►
www.tmgindustrial.com
20' EXPANDABLE PREFA
B CONTAINER HOUSE 2
STEP 2 : INSTALLATION PROCEDU
RE
1. Pull out the roof bolt.
2. Open up the roof.
After lifting the roof, there must be a
upholder
3. Assemble the leg support.
4. Pull out the floor bolt.
www.tmgindustrial.com
6/16
TOLL FREE:1
B CONTAINER HOUSE 2
BRM
RE
upholder
to temporarily fix the roof.
TOLL FREE:1
-877-761-2819

►
www.tmgindustrial.com
5. Put down the floor.
The floor is heavy; there must be at least
6. Lift up Wall-B.
Adjust the legs to level the floor; it will
affect
7. Stick the flat tape and D tape.
www.tmgindustrial.com
7/16
TOLL FREE:1
5 men to put down it!
affect
the opening of Wall-A and C
TOLL FREE:1
-877-761-2819

►
www.tmgindustrial.com
8. PUT IN THE PARTITION WALL.
9. Fixed the partition wall.
Use4L-shape corner covering to fix
the
Use at least 3 rivets on each side of
the
10. Open the Wall-A, Wall-C.
6-12
www.tmgindustrial.com
8/16
TOLL FREE:1
the
partition wall;
the
L-shape corner covering to fix the corner covering!
2
2-1
TOLL FREE:1
-877-761-2819
2
-1

►
www.tmgindustrial.com
11. Use L-shape corner covering to fix
Wall
Use at least 3 rivets on each side
of the
12. Open and assemble the other side
by
www.tmgindustrial.com
9/16
TOLL FREE:1
Wall
-A & Wall-C /Wall-1 & Wall-3.
of the
L-shape corner covering to fix the corner
covering!
by
the same way.
2-1
6-12
TOLL FREE:1
-877-761-2819
covering!
2-1

►
www.tmgindustrial.com
13. Assemble the PVC corner
covering.
Measure the height and cut the corner
covering
2-3
www.tmgindustrial.com
10/16
TOLL FREE:1
covering.
covering
into proper size!
6-10
2-3
6-10
TOLL FREE:1
-877-761-2819

►
www.tmgindustrial.com
14. Color Steel Plate u-shaped groove
15. Assemble the skirting line.
NOTICE: For the corner fixed buckle
,
2-2
www.tmgindustrial.com
11/16
TOLL FREE:1
,
the narrow side adjoins the wall!
6-10
TOLL FREE:1
-877-761-2819
2-4
2-9

►
www.tmgindustrial.com
16. Assemble the pinch plate.
2-5
6-3
www.tmgindustrial.com
12/16
TOLL FREE:1
2-7
2-10
2-6
TOLL FREE:1
-877-761-2819
2-8
6-11

►
www.tmgindustrial.com
17. Assemble the T tape inside the
container
18. Assemble the T tape outside the
container
www.tmgindustrial.com
13/16
TOLL FREE:1
container
house.
container
house.
6-2
6-2
TOLL FREE:1
-877-761-2819
6-2

►
www.tmgindustrial.com
19. Fixed container house roof
corner.
20. Assemble the window.
6-8
www.tmgindustrial.com
14/16
TOLL FREE:1
corner.
6-9
6-8
1-1 / 1-2
TOLL FREE:1
-877-761-2819
6-8

►
www.tmgindustrial.com
21. Assemble the light.
1. Use 3 Ear Tapping Screws to fix the lamp holder with the roof.
2. Connect the roof wire with the lamp wire. Hold with insulating tape.
3. Fitted with lamp covering.
22. Assemble the cupboard.
Fix the 4 bases to the bottom of the
ca
the cabinet level by adjusting the
legs.
3-2
6-11
www.tmgindustrial.com
15/16
TOLL FREE:1
1. Use 3 Ear Tapping Screws to fix the lamp holder with the roof.
2. Connect the roof wire with the lamp wire. Hold with insulating tape.
ca
binet by nails, and then put the four legs into
the
legs.
2-11
TOLL FREE:1
-877-761-2819
the
bottom seat. Make
6-11

►
www.tmgindustrial.com
Apply the sealant on the yellow area to fix the marble countertop and breakwater.
hours to dry and fixed
AFTER THE INSTALLATION
Walk around and inspect the building periodically to make sure all components are still firmly
secured and the whole building is well supported. Check all bolts and nuts as well as all connection
points to make sure they are
all in good position, required and clean the cover regularly.
The accumulated snow on the top cover must be removed as soon as possible
solid ice on the cover;
it will increase the
life span eventually.
Keep the building on a dry ground most of the time. Do not keep the fabric dirt skirt under water all
the time, otherwise the fabric will deteriorate.
We strongly recommend you remove any snow from the roof immediately. D
load on the roof overnight. Keep 3 feet of clearance
accumulate and pile up on the sides of the building. Otherwise the push from the sides toward inside
will make the building collapsed
at some point.
www.tmgindustrial.com
16/16
TOLL FREE:1
Apply the sealant on the yellow area to fix the marble countertop and breakwater.
Sealant should wait for 24
Walk around and inspect the building periodically to make sure all components are still firmly
secured and the whole building is well supported. Check all bolts and nuts as well as all connection
all in good position, required and clean the cover regularly.
The accumulated snow on the top cover must be removed as soon as possible
, if
snow
it will increase the
weight on the roof and collapses the
building or
Keep the building on a dry ground most of the time. Do not keep the fabric dirt skirt under water all
the time, otherwise the fabric will deteriorate.
We strongly recommend you remove any snow from the roof immediately. D
o not leave any snow
load on the roof overnight. Keep 3 feet of clearance
on all
sides at all times. Do not allow snow to
accumulate and pile up on the sides of the building. Otherwise the push from the sides toward inside
at some point.
TOLL FREE:1
-877-761-2819
Sealant should wait for 24
Walk around and inspect the building periodically to make sure all components are still firmly
secured and the whole building is well supported. Check all bolts and nuts as well as all connection
all in good position, required and clean the cover regularly.
snow
becomes
building or
reduce the
Keep the building on a dry ground most of the time. Do not keep the fabric dirt skirt under water all
o not leave any snow
sides at all times. Do not allow snow to
accumulate and pile up on the sides of the building. Otherwise the push from the sides toward inside
6-16
6-1
Table of contents
Other TMG Shelter manuals

TMG
TMG TMG-203012PST User manual

TMG
TMG TMG-CP2030F-1.0 User manual

TMG
TMG TMG-MSC2030F User manual

TMG
TMG TMG-184517ST User manual

TMG
TMG TMG-CP1220F User manual

TMG
TMG TMG-MS2119 User manual

TMG
TMG DUAL TRUSS PRO Series User manual

TMG
TMG PRO Series User manual

TMG
TMG TMG-ST2020L User manual

TMG
TMG TMG-MSC2030 User manual

TMG
TMG TMG-ST3040-1.0 User manual

TMG
TMG TMG-DT5040CG User manual

TMG
TMG TMG-ST3041CE User manual

TMG
TMG TMG-ST2031V User manual

TMG
TMG TMG-MSC1220F User manual

TMG
TMG TMG-MSC2020F User manual

TMG
TMG TMG-CP2000-RD110 User manual

TMG
TMG TMG-ST3070-2.0 User manual

TMG
TMG ST2030 User manual

TMG
TMG TMG-DT50FW8 User manual