
6 Cataya Super BAH0087-11 01.19
5.2AMAZONE AmaDrill 2 control terminal ................................................................................. 61
5.3AMAZONE calibration button ................................................................................................ 62
5.4Control terminal for implements with ISOBUS system .......................................................... 62
5.4.1AMAZONE AmaTron 4 control terminal ................................................................................ 63
5.5AMAZONE TwinTerminal ...................................................................................................... 63
5.6Implement documentation ..................................................................................................... 64
5.7Central key ............................................................................................................................ 64
5.8Hand wash tank ..................................................................................................................... 64
5.9Star wheel ............................................................................................................................. 65
5.10Radar device ......................................................................................................................... 66
5.11Seed hopper and loading board ............................................................................................ 67
5.11.1Fill level monitoring ................................................................................................................ 68
5.12Seeding shaft drive................................................................................................................ 69
5.12.1Seeding shaft drive of one star wheel ................................................................................... 69
5.12.1.1Extending the range of the Vario gearbox ............................................................................ 70
5.12.2Seeding shaft drive, electric .................................................................................................. 71
5.13Metering ................................................................................................................................ 72
5.13.1Setting values ........................................................................................................................ 74
5.13.1.1Coarse and fine metering wheel ........................................................................................... 76
5.13.1.2Bean metering wheel............................................................................................................. 76
5.13.1.3bottom flaps ........................................................................................................................... 77
5.13.1.4Slide gate .............................................................................................................................. 78
5.13.1.5Agitator shaft support ............................................................................................................ 78
5.14Seed rate calibration ............................................................................................................. 79
5.14.1Calibration - Implements with star wheel drive ..................................................................... 82
5.14.2Calibration - Implements with electric seeding shaft drive .................................................... 85
5.15RoTeC Control coulter .......................................................................................................... 86
5.16TwinTeC double disc coulter ................................................................................................. 88
5.16.1Seed placement depth (TwinTeC) ........................................................................................ 90
5.17Coulter pressure, seed rate increase and coulter lift (all coulter types) ................................ 91
5.17.1Coulter pressure / coulter lift (manually actuated) ................................................................ 91
5.17.2Coulter pressure, seed rate increase and coulter lift (hydraulically actuated) ..................... 92
5.17.2.1Coulter pressure (hydraulically actuated) ............................................................................. 92
5.17.2.2Activating the seed rate increase .......................................................................................... 93
5.17.2.3Coulter lift (hydraulically actuated) ........................................................................................ 94
5.18Exact following harrow .......................................................................................................... 95
5.18.1Exact following harrow tine position ...................................................................................... 96
5.18.2Exact following harrow pressure ........................................................................................... 98
5.18.3Seeding without exact following harrow (exact following harrow lift) .................................... 99
5.19Roller harrow ....................................................................................................................... 100
5.20Tramlines ............................................................................................................................. 102
5.20.1Tramline rhythm, tabular determination .............................................................................. 105
5.20.2Tramline rhythm, graphic determination.............................................................................. 106
5.21One-sided switching ............................................................................................................ 108
5.21.1One-sided switching – One-sided seeding shaft drive ........................................................ 108
5.21.2One-sided switching – seeding shaft drive on both sides ................................................... 109
5.22Tramline marker .................................................................................................................. 110
5.23Track marker ....................................................................................................................... 111
5.24Headlight ............................................................................................................................. 112
5.25GreenDrill 200E ................................................................................................................... 113
6Start-up .................................................................................................... 114
6.1Checking the suitability of the tractor .................................................................................. 115
6.1.1Calculating the actual values for the total tractor weight, tractor axle loads and tyre
load-bearing capacity, as well as the required minimum ballast weight ............................. 116
6.1.1.1Data required for the calculation (attached implement) ...................................................... 117
6.1.1.2Calculation of the required minimum ballast weight at the front GV min of the tractor