
6.2.4 Coupling the ISOBUS or control
computer 43
6.2.5 Coupling the 3-point mounting frame 43
6.2.6 Coupling the Avant seeding unit 44
6.2.7 Installing the lighting on the seeding
unit 50
6.3 Preparing the implement for
operation 52
6.3.1 Adjusting the working position sensor 52
6.3.2 Folding the lighting 52
6.3.3 Unfolding the implement 53
6.3.4 Adjusting the placement depth on
the TwinTeC coulter 53
6.3.5 Adjusting the placement depth on
the RoTeC coulter 54
6.3.6 Adjusting the coulter pressure
hydraulically 55
6.3.7 Adjusting the additional coulter
pressure on the TwinTeC coulter 56
6.3.8 Lifting the coulters hydraulically 56
6.3.9 Adjusting the coulter harrow 57
6.3.10 Adjusting the exact following harrow 60
6.3.11 Adjusting the tramline marker on
the implement frame 65
6.3.12 Adjusting the row spacing 70
6.4 Preparing the machine for road
travel 71
6.4.1 Putting on the road safety bars on
the harrow 71
6.4.2 Unfolding the lighting 72
6.4.3 Folding the tramline marker onto
the implement frame 72
6.4.4 Folding the implement 72
6.4.5 Road travel with an Avant seeding
combination 73
6.5 Calculating the permissible
payload 73
7Using the machine 75
7.1 Removing the road safety bars 75
7.2 Starting work with one part-width
section 75
7.3 Using the implement 76
7.4 Checking the placement depth 76
7.5 Turning on the headlands 77
8Eliminating faults 78
9Parking the machine 84
9.1 Parking the TwinTeC coulter 84
9.2 Disconnecting the supply lines
from the front-mounted hopper 84
9.3 Disconnecting the hydraulic
hose lines 85
9.4 Uncoupling the ISOBUS or
control computer 85
9.5 Uncoupling the power supply 86
9.6 Uncoupling the Avant seeding
combination 86
9.7 Parking the Avant seeding unit
separately 87
9.7.1 Parking the seeding unit with 2
distributor heads separately 87
9.7.2 Parking the seeding unit with one
distributor head separately 92
9.8 Installing the lighting on the soil
tillage implement 96
10 Repairing the machine 97
10.1 Maintaining the machine 97
10.1.1 Maintenance schedule 97
10.1.2 Checking the TwinTeC cutting discs 98
10.1.3 Checking the TwinTeC cutting disc
distance 99
10.1.4 Checking the TwinTeC depth control
wheel 100
10.1.5 Checking the TwinTeC depth control
wheel scraper 101
10.1.6 Checking the RoTeC depth control
discs and RoTeC depth control
wheels 102
10.1.7 Checking the cutting discs 103
10.1.8 Checking the RoTeC furrow former 104
10.1.9 Cleaning the segment distributor
head 104
10.1.10 Checking the top link pin and lower
link pin 105
MG6545-EN-GB | E.1 | 29.09.2022 | © AMAZONE
II