
6 Cayena BAH0062-4 09.15
5.1.4Implements without independent service brake system ....................................................... 58
5.2Accessories kit with the operating manual............................................................................ 59
5.3Radar..................................................................................................................................... 59
5.4AMATRON 3 control terminal................................................................................................ 60
5.5AMADRILL+ control terminal................................................................................................. 61
5.6Frame and implement booms ............................................................................................... 62
5.7Hopper................................................................................................................................... 63
5.7.1Fill level monitoring................................................................................................................ 65
5.8Metering ................................................................................................................................ 66
5.8.1one-chamber system dosing................................................................................................. 67
5.8.2Two-chamber system dosing................................................................................................ 68
5.8.3Application rate/Calibration test ............................................................................................ 69
5.8.4Seed pre-metering (only with AMATRON 3 control terminal)............................................... 71
5.8.5Metering rollers...................................................................................................................... 72
5.8.5.1Metering roller diagram table ................................................................................................ 73
5.8.5.2Table – metering rollers, seed............................................................................................... 75
5.8.5.3Table – metering rollers, fertiliser.......................................................................................... 75
5.9Blower fan ............................................................................................................................. 76
5.9.1Connecting the blower fan to the tractor hydraulics.............................................................. 76
5.9.2Blower fan connection to the tractor PTO shaft (on-board hydraulic system) ...................... 77
5.9.3Blower fan speed table for implements with one hopper chamber....................................... 78
5.9.4Blower fan speed for implements with two hopper chambers .............................................. 79
5.10Distributor head..................................................................................................................... 80
5.10.1Seed tube monitoring (optional)............................................................................................ 80
5.11Coulter chisel and seed/fertiliser placement depth............................................................... 81
5.12Leading roller feelers (optional)............................................................................................. 82
5.13Cutting discs (optional).......................................................................................................... 83
5.14Wedge ring tyres................................................................................................................... 84
5.14.1Furrow ridge levellers (optional)............................................................................................ 84
5.15Exact following harrow .......................................................................................................... 85
5.16Rear harrow (optional) .......................................................................................................... 86
5.17Tractor wheel mark eradicator (option)................................................................................. 86
5.18Track markers (optional) ....................................................................................................... 87
5.19Tramlines............................................................................................................................... 88
5.19.1Examples for creating tramlines............................................................................................ 90
5.19.2Tramline rhythm 4, 6 and 8................................................................................................... 92
5.19.3Tramline control 2 and 21 ..................................................................................................... 93
5.19.4One-sided switching.............................................................................................................. 94
5.19.5Tramline marker (optional).................................................................................................... 94
6Commissioning ......................................................................................... 95
6.1Checking the suitability of the tractor.................................................................................... 96
6.1.1Calculating the actual values for the total tractor weight, tractor axle loads and load
capacities, as well as the minimum ballast ........................................................................... 97
6.1.1.1Data required for the calculation (hitched implement) .......................................................... 98
6.1.1.2Calculation of the required minimum ballasting at the front GV min of the tractor for
assurance of the steering capability...................................................................................... 99
6.1.1.3Calculation of the actual front axle load of the tractor TV tat................................................... 99
6.1.1.4Calculation of the actual total weight of the combined tractor and implement...................... 99
6.1.1.5Calculation of the actual rear axle load of the tractor TH tat ................................................... 99
6.1.1.6Tractor tyre load capacity...................................................................................................... 99
6.1.1.7Table ................................................................................................................................... 100
6.1.2Requirements for tractor operation with attached implements ........................................... 101
6.2Securing the tractor/implement against unintentional start-up and rolling.......................... 102
6.3Installation regulations for the hydraulic fan drive connection ............................................ 103
7Coupling and uncoupling the implement.............................................. 104
7.1Dual-circuit pneumatic service brake system...................................................................... 106