
Contents and general instructions
IV Festo P.BE-CP-DN2-EN en 0107NH
2. Commissioning 2-1................................................
2.1 Preparing the CP valve terminal for commissioning 2-3....................
2.1.1 Switching on the operating voltage 2-3.................................
2.1.2 Address assignment of the CPV valve terminal 2-4.......................
2.2 Commissioning on the DeviceNet 2-6..................................
2.2.1 General information 2-6.............................................
2.2.2 Configuring DeviceNet slave features (EDS) 2-7..........................
2.2.3 Valid instructions for parametrizing on the DeviceNet 2-9..................
2.2.4 Instructions on parametrizing with RSNetWorx for DeviceNet 2-11...........
2.2.5 Device-specific parametrizing 2-17.....................................
2.2.6 Explicit Message 2-25................................................
3. Diagnosis 3-1.....................................................
3.1 Diagnosis by means of LEDs 3-3......................................
3.1.1 Normal operating status 3-3.........................................
3.1.2 Error displays of the LEDs PS and MNS 3-4.............................
3.1.3 LEDs for status display of the valve solenoid coils 3-7.....................
3.2 Error search when bus is started 3-8...................................
3.3 Reaction to faults in the control system 3-9.............................
3.4 Diagnosis on the DeviceNet 3-10.......................................
3.4.1 Diagnosis via the Software Configurator 3-10............................
3.4.2 Diagnosis via user program 3-13.......................................
3.5 Short circuit/overload 3-14...........................................
3.5.1 Output module 3-14.................................................
3.5.2 Sensor supply at an input module 3-15.................................
A. Technical data and accessories A-1...................................
A.1 Technical specifications A-3..........................................
A.2 Accessories A-5....................................................
A.3 Compatibility of the CPV..-GE-DN2-8 to earlier products A-9................
A.3.1 Adapting the power supply A-9.......................................
A.3.2 Adapting the network configuration A-10................................