6 INSTALLATION PLACE
1) Recommended installation height is 2.2-2.4 m.
2) Install detector on bearing walls and carriers.
3) Alarm loop and power supply wires should
be located far from power cables.
To eliminate false alarm hazards
It is recommended to close all doors, air-vents,
switch off fans, air-conditioners and other
sources of intense air flows in the room during
protection period.
Not recommended installation places
7 INSTALLATION
3a) Installation on a
wall
3b)Installation in a
corner
Orient detector base strictly according to
the picture!
4) Fix the base on the wall. Install PCB.
5) Connect the wires (see section 8)
6) Perform TEST pass (see section 9)
8 WIRING
Perform wiring to detector`s terminals in
accordance with control panel operating manual.
+12V, GND –power supply terminals.
RELAY –terminals for detector connection to
hardwired zone;
TMP –detector tampering control terminals;
9 TEST-PASS
1) Turn on detector power. LED indicator will
start flashing for a maximum of 60 seconds.
2) Perform a TEST pass across the protected
area at a speed of 0.5 m/s to determine the
sensitive zones. At the moment of detection
(LED indicator will light up for 2.5 seconds),
stop, mark this position,
then go back one step
and continue moving.
Repeat the test pass in
the opposite direction.
10 WARRANTY
Warranty period of operation - 5 years from the
date of commissioning, but not more than 5
years 6 months from the date of manufacture,
and subject to the requirements of the current
operational documentation.