TRONXY X5S 2E User manual

Aluminum1
Aluminum2
Aluminum3
Aluminum
1
1. Take Aluminum1, 2 pieces, Aluminum2,2 pieces, Aluminum3,4
pieces, assemble them in the direction shown, and fasten them
with 8 screws of PM5*25.
Note: do not lock the screw tightly to facilitate subsequent
adjustment.
3. Take Aluminum1 2pcs, assemble them in the direction shown,
and screw them with 4 screws of PM5*25.
2. Take the Foot pads, spacer M4, screw PM4*9 and boat nut M4,
assemble them in the order shown, and lock them on the
aluminum profile 1, about 20mm away from the end.
Assembly technique of M4 boat nuts: first, align the M4 nut with
the aluminum profile groove and put it into the aluminum profile
groove. Unscrew with the screwdriver and release the M4 boat nut
to cross the aluminum profile inner groove and then screw it
forward.
Step 1: assemble the underframe
Assembly material specification and quantity:
Aluminum1 20*20*530
4pcs
Aluminum2 20*20*460
2pcs
Aluminum3 20*40*530
4pcs
Foot padΦ
26*12 4pcs
screwsPM5*
25 12pcs
screwsPM4*
9 4pcs
spacerM4
4pcs
Note: before locking the screws, align the edges of the aluminum
profile vertically.
boat nutsM4 4pcs
1 product assembly

left sliding plate
components
right sliding plate
components
1. Take Aluminum2 2pcs and insert the left and right components
of the slide respectively, as shown in the figure. Screw on 4 screws
PM4*8 and 4 boat nuts M4.
2. Install aluminum2 components into the end of aluminum profile
3 of the bottom frame, as shown in the figure;Screw on 4 PM5*25
screws.(do not lock tightly to facilitate subsequent adjustment)
The eccentric nut
Sink hole location
screwPM4*8
4件
The eccentric nut clearance adjustment
left sliding plate components
1pcs
Assembly material specification and quantity:
underframe
1pcs
screwsPM5*
25 4pcs
right sliding plate
components 1pcs
Aluminum2 20*20*460
2pcs
Note: the pulley is on the side without holes, and the skateboard is
on the side with four holes.
boat nutsM4
4个
Step 2: install the sliding plate

Aluminum4
left sliding
plate
component
Aluminum1
right sliding
plate
component
Aluminum2
2. Insert aluminum4 into the print head assembly, as shown in the
figure.The eccentric nut clearance adjustment
Assembly technique of M4 boat nuts: first, align the M4 nut with
the aluminum profile groove and put it into the aluminum profile
groove. Unscrew with the screwdriver and release the M4 boat nut
to cross the aluminum profile inner groove and then screw it
forward.
Step 3: print head installation
Assembly material specification and quantity:
screws
PM3*16
2pcs
screws
PM4*12
2pcs
print head
component(incl
drag chain) 1pcs
boat nutsM4
4个
Note: aluminum4 ends and aluminum profile 2 are 3mm apart.
frame 1pcs
Aluminum4
20*20*484
1pcs
nuts M3
4pcs
3. The aluminum 4 components, in the left side of the chassis
components of the boat nut, screw screws on the sliding plate PM4
* 8, as shown, move aluminum4, move and flexible, locking PM4 *
8 screws, move aluminum 4 again, move and flexible, locking in
aluminum 1/2 PM5 * 25 screw, move aluminum 4 again, confirm
the move and flexible.Otherwise, please adjust it repeatedly to
ensure that the slide table moves flexibly and without clearance
shaking after locking the screw.
Align the chain holes, as shown in the figure, with 2 PM3*16 screws
through and 2 M3 nuts locked;Thread 2 PM4*12 screws through
the drag chain riser, screw 2 boat nut M4 through the aluminum
groove, and lock the screw PM4*12.
drag chain
riser 1pcs
screws
PM3*8 2pcs
1. As shown in the figure, put 2 PM3*8 screws through the drag
chain, A shaft bracket, and lock them with 2 nut M3.
The eccentric nut

Y MOTOR X MOTOR
Assembly material specification and quantity:
Step 4: installation of XY motor components and over-wheel installation
screwsPM4*
12 4pcs
screwsPM3*
10 8pcs
boat nutsM4
10pcs
Y motor
plate 1pcs
X motor
plate 1pcs
right over-
wheel
component
1pcs
screwsPM4*
8 6pcs
underframe
component
1pcs
motor 2pcs
1. Take 1 motor and 1 piece of Y motor board, align them at the
position as shown in the figure, use 4 screws of PM3*10, screw into
the motor and fasten them, use 2 screws of PM4*12 through the
acrylic board, and screw on 2 ship type nuts M4.Similarly, assemble
X motor component 1 as shown.
1. Place the X/Y motor component, left/right via wheel component,
and fix it on the aluminum profile with boat nut M4 according to
the position shown. Align the edge.
left over-
wheel
component
1pcs
left over-
wheel
component
right over-
wheel
component

frame 1pcs
Diagram of tie the belt
1. Move the belt through as shown, wrap the motor gear on the
rack surface, and determine the belt trend. Press the slide plate
against the motor bottom plate and fasten it with the tie belt at
the lower end of the sheet metal groove of the print head
assembly.Loosen the motor baseplate screw, pull the motor
assembly outward, tighten the belt (do not force too much), and
lock the screw.
Step 5: assemble the belt
Assembly material specification and quantity:
belt 2pcs
Tie 4pcs

1. Take 1 piece of beam, 2 pieces of linear bearing and 1 piece of
screw nut, align them according to the position shown, and fasten
them with 12 screws of PM3*8.As shown in figure.Assembly 2 sets.
beam 2pcs
screwPM4*12 4pcs
boat nuts 8pcs
bearing block 2pcs
Step 6: assemble linear bearing and z-axis motor
Assembly material specification and quantity:
gasketM4 4pcs
screwPM4*9 4pcs
3. Take 1 piece of motor component of Z axis, insert 2 screws
PM4*12 as shown, and screw on 2 boat nuts M4.Assembly 2 sets.
2. Take 1 piece of bearing block, insert 2 screws PM4*9 into the
position shown, and screw on 2 boat nuts M4.Assembly 2 sets.
Z axis motor component
2pcs
linear bearing 4pcs
feed crew nut 2pcs
screwPM3*8 24pcs

Aluminum2
PM4*20
2-M3Hole on the lateral
2. Will the Z axis of the carriage motor board ship nut to adjust, and put the
Z axis carriage in graphical position within the aluminum 2, here is a hole
on the outside of the M3 will be polished rod with aluminum 2 hole
alignment, with 20 PM4 * of the aluminum 2 hole above the screw through
the component, connected to the polished rod M4 screw hole, using PM4 *
20 screws through the aluminum 2 hole under its component, connected to
the M4 screw hole position.As shown in the figure;Turn the screw rod, slide
the cross plate assembly and the bearing seat to the top, lock the four
screws PM4*20 inside the aluminum profile 2 up and down of the assembly,
then lock the boat nut on the bearing seat, and then lock the two meter
screws on the bearing seat.Turn the screw and drop the cross plate
assembly to make sure it is flexible.Otherwise, please loosen the screw and
adjust it again.Finally, lock the 4 meter screws on the coupling and the boat
nut screws on the motor board.Turn the screw again to make sure that the
board slides up and down smoothly.
3. Repeat step 2 to assemble another z-axis slide carriage, as
shown in the figure.
Note: when the screw rod is assembled, the tail is about 3mm
inside than the polished rod.
bearing block
components
2pcs
Polished rod
Φ8*528
4pcs
screwsPM4*
20 8pcs
Lead
screwT8*453
2pcs
Step 7: assemble Z axis components
Assembly material specification and quantity:
beam
component
2pcs
frame 1pcs
Z axis motor bracket 2pcs
1. Take 1 piece of motor bracket of Z axis, insert the polished rod
into the acrylic plate hole of the motor bracket, and do not
protrude, as shown in the figure. Then, insert the cross plate
components into the second polished rod, and connect the screw
rod through the screw nut to the coupling hole of the
motor.Assemble a total of 2 sets --Z axis sliding rack.
3mm

right feed
motor
component
left feed
motor
component
1. Use 2 PM4*12 screws and boat nut M4 to lock the feeding
motor components on the right side of the diagram.
2. Use 2 PM4*12 screws and boat nut M4 to lock the feeding
motor components to the left in the left position shown.
Step 8: feed motor installation
Assembly material specification and quantity:
boat nutsM4 4pcs
frame 1pcs
left feed motor
component 1pcs
screwPM4*12 4pcs
right feed motor
component 1pcs

Hole
location
Position of
wire outlet
Hole
location
M3 Nut PM4*8 screw
PM3*10 screw
PM3*6 screw
1. Take the hot bed, pass through the hot bed with 6 KM3*30
screws, and lock it with M3 nut, as shown in the figure;Insert the
spring into the screw of KM3*30, extend from the hole
corresponding to the beam, and screw into the plastic nut of M3
to adjust the spacing between the hot bed and the beam by about
10mm.The relation between beam position and wire is shown
below.
3. Turn the two screw rods to make the left and right side plates on
the same plane and fasten the hot bed components to the side
plates with 8 PM4*12 screws,as shown in the figure.The drag chain
bracket is close to the side of the feeding motor
component.Rotate the screw rod in the same direction to make the
platform move up and down synchronously,and make sure the
movement is flexible. Otherwise, loosen the screw PM4*12 to
adjust.
screwPM4*1
2 8pcs
Note: you can twist the tow link head of the second end of the
chain, tighten the screw and install it.
screwPM4*12
2. Take 1 piece of drag chain bracket and fasten it to the beam
with PM3*10 screws according to the position shown.
4. Take 2 KB3*8 screws, as shown in the figure, and tighten the
chain support and chain;Take 2 PM3*10 screws, go through the
chain and drag the bottom plate of the chain, and lock them with
2 M3 nuts. As shown in the figure, take 2 PM4*8 screws, go
through the bottom plate of the chain chain, screw on the on-
board shape nut M4, lift the hot bed to the top, finish the chain,
and lock the aluminum profile with boat nut.
drag chain
baseboard
1pcs
hotbed 330*330*3 1pcs
Step 9: print platform assembly
Assembly material specification and quantity:
drag chain
support
1pcs
screwKM3*30 6pcs
screwsPM3*
10 2pcs
screwKM3*1
0 2pcs
nutsM3
8pcs
plastic nutsM3 6pcs
beam 2pcs
frame 1pcs
screwKB3*8
2pcs
spring 6pcs
10mm

screwPM3*4
4pcs
screwPM4*6
3pcs
2.Take the screw of boat nut and PM4*6, and screw the position
3.Fix the main board assembly with boat nut on the aluminum
profile
The fan cover 1pcs
the position shown, and lock them with 4 PM3*4 screws.
and main board assembly as shown.
as shown.
Assembly material specification and quantity:
Main components 1pcs
1.Take the main board assembly and fan cover plate, place them in
mainframe 1pcs
Step 10: motherboard assembly
boat nutsM4 3pcs

Voltage
selection
Voltage
selection
1. Select the power component and select the voltage of
110V/220V according to the power supply voltage in the
region.Adjust the gear with one word screwdriver. Select 220V and
slide the gear into 220V, as shown in the figure.Select 110V and
slide the shift to 110V.Assemble the boat nut M4 and screw PM4*9
in the position shown.
Step 11: power supply installation
Assembly material specification and quantity:
2. Fix the aluminum profile groove with the boat nut and lock the 3
screws PM4*9, as shown in the figure.
mainframe 1pcs
power 30A component
1pcs
screwPM4*9
3pcs
boat nutsM4
3pcs

nutsM8 4pcs
rack plate
2pcs
filament rack
1. Take 1 piece of material rack plate, 1 outer hexagon screw and 2
nut M8, assemble the lock as shown.
2. Take 2 screws of PM4*8, respectively go through the material
rack plate, and screw on the on-board nut M4, as shown in the
figure.Repeat 1, 2 steps to assemble the other.
3. Fix the material rack assembly into the aluminum profile groove
with boat nut, and lock the 2 screws PM4*12, as shown in the
figure.(hang the material plate on the screw rod)
screwPM4*12 4pcs
Step 12: assemble the filament rack
Assembly material specification and quantity:
hex screwM8*100 2pcs
mainframe 1pcs
boat nutsM4 4pcs

feeding pipe
3. Place the glass fiber board on the aluminum substrate, align the
sides, and fasten with 4 clamps, as shown in the figure.
mainframe 1pcs
Assembly material specification and quantity:
Step 13: assemble decorative strip and feeding pipe, glass fiber board
2. Cut the decorative strip to the appropriate length and press it
into the aluminum profile groove, as shown in the figure.
1. Pull the feeding tube into the air nozzle hole of the feeding
component, press down the plastic outer ring of the air nozzle,
insert the feeding tube, loosen the plastic ring and jam the feeding
tube, as shown in the figure.Make sure the material tube is
jammed.Then put the other end of the feeding tube into the air
nozzle of the printing head assembly and confirm that the feeding
tube is tightened.
decorative strip 1roll
feeding pipeΦ4 2pcs
glass fiber board 1pcs
clamp 4pcs

Aluminum4
switch base
1pcs
2. Put the switch assembly into 2 screws PM4*9 according to the
position shown, and screw the on-board nut M4
4. Take 1 screw PM3* 45,1 plastic nut M3, screw in according to
the position shown, and pass through the screw tooth hole of
horizontal plate M3.After adjusting the hot bed and screw PM3*45
to the appropriate height, tighten the plastic nut.
Assembly material specification and quantity:
Step 14: limit switch assembly
boat nutsM4
2pcs
screw
PM4*9 2pcs
plastic
nutsM3
1pcs
Switch(incl
wiring) 2pcs
screwPM3*4
5 1pcs
mainframe
1pcs
Note: the screw's torque is small, not too hard.
screwPB2*1
0 4pcs
1. Take 1 piece of switch seat and 2 pieces of switch, and insert 2
screws PB2*10 into it respectively according to the position shown
in the picture, and lock the screws.
3. Fix the switch assembly in the aluminum profile groove with
boat nut, as shown in the figure. The edge of the switch seat is
aligned with the end face of aluminum profile 4, and lock the 2
screws PM4*9, as shown in the figure.

9. Plug in the power cord, connect the power, and debug the machine.
6. Connect the Power supply connection to the Power supply terminal of
the main board, red positive pole and black negative pole.
7. Select the voltage of 110V/220V according to the power supply voltage
in the region.
10. After debugging, tidy the wires and tie them with wrapping tape.
USB cable 1pcs
mainframe 1pcs
The motor wire 4P*6
Step 15: wiring
Assembly material specification and quantity:
Switch wire assembly
2pcs
Wrapping tape 1roll
3. Insert the switch wire terminals of Y and Z into the Y STOP and Z STOP
terminals of the main board respectively.As shown above.
4. Lock the 4P wire of the HOTBED outgoing line and 2 red dip tin wires
onto the HOTBED terminal block of the main board respectively, with no
positive or negative poles.The 2 white line terminals are inserted on the
BTEMP terminal seat of the motherboard.
The power cord 1pcs
1. Open the upper cover of the control box to reveal the mainboard.
Wiring diagram of main board and display screen
5. Insert the 10P wire out of the extruder head and the red and black
terminal FAN1 logo of the wire into the FAN1 terminal seat of the main
board;The blue and black terminal FAN2 logo is inserted on the FAN2
terminal seat of the main board;The green and black terminal is inserted on
the X STOP terminal seat of the motherboard;2 white terminals are inserted
on the ETEMP terminal seat of the motherboard;2 red dip tin wire,
respectively locked on the HOTEND terminal block of the main board, no
positive and negative poles.
8. Connect the red line of the upper cover fan to the positive pole of the
mainboard power supply and the black line to the negative pole, check the
wiring diagram of the physical object, and confirm that the wiring is correct,
and install the upper cover.
2. Take the motor connection wire (5 pieces) and insert it into the motor
terminal seat of X, Y, z-1, z-2, E and E2 corresponding to the main board
and the motor respectively, as shown in the figure above.
printer wiring
Z1-motor1
Z2-motor
X-motor
Y-motor
E2-motor
Z STOP
Y STOP
X STOP
Fan 2
Fan 1
Heat
E-motor
-DC12V+
BTEMP
ETEMP
FAN2
FAN1
E-motor
Z2-motor
Z1-motor
Y-motor
X-motor
HOTBED
HOTEND
X STOP
Y STOP
Z STOP
E2-motor

Wiring diagram of main board

2 Touch screen operation guide
1. Enter the main screen of the startup, display the system and tools, print three main menus, and click on the three sub-
menus, as shown in the figure.Basic functionality for displaying submenus.
2. Click the system menu and enter it into the system submenu, as shown in the figure: click back menu and return to the
superior menu.
2.1 click the state and display as shown in the figure: display the machine position state parameters.Click back menu to
return to the superior menu.
2.2 click the machine information and display the following figure: display the machine brand, ID, version and other
information.Click back menu to return to the superior menu.

2.3 click the Chinese location menu to enter Chinese and English.Click back menu to return to the superior menu.
2.4 click factory Settings to ask whether the factory Settings are restored.Click to return to restart and restore the factory
Settings.
2.5 click the screen correction, enter the screen correction and click the cross position for correction.Adjust the screen
when clicking the menu deviation, save the return.

3.1.1 click the manual menu to enter the manual adjustment mode.Adjust the motor rotation, E extruder
feeding/discharging, XYZ shaft motor moving, ICONS 0.01mm, 0.1mm, 1mm,10mm. After clicking, dark color is displayed,
such as icon 10mm. It means that motor stroke moves 10mm each time you click.Click the icon and the machine
returns to the origin.Click back to the parent menu.
3.1.2Click on the left bottum icon of E1 to change the icon of E1 to display E2. Click on the icon of E2 again to display E1,
as shown in figure E1E2.When displaying E1, click icon E to start extruder 1; when displaying E2, click icon E to start
extruder 2.
3.2 click the icon of preheating, as shown in the figure, set the heating temperature of the machine extrusion head and
the hot bed, heat the icon hot bed and heat the icon extrusion head, and click the icon in the right and left
direction to adjust the setting temperature.Return save Settings.Click the number box to display the last set value.
3. Click the tools menu to enter the machine parameter setting and adjustment.

3.3.1 click the icon of loading and unloading consumables to indicate preheating.Remove the consumables to warm up
before pulling them out.Click the number box to heat, the temperature is reached, and click the icon to return
the material.When installing the consumables, the front end of the consumables shall be stroked straight into the hole of
the feeder, and then protruded.As shown in the figure, pass the consumables through the feeder hole, reach the
consumables, and insert the consumables into the bottom of the extrusion head.Click the icon to send the material
to the nozzle.Click the icon to stop feeding.Also insert another filaments and material pipes.
3.3.2Enter the manual menu and switch to E1. Set the moving length to 10mm.Click return 40mm, click E1 to switch
to E2, and click feed.Feed to nozzle E2 color discharge.When setting the slice software, switch the double sprinkler
head back to 40mm.
The cutaway view of extruder head chamber
Other TRONXY 3D Printer manuals

TRONXY
TRONXY X5SA-500-PRO User manual

TRONXY
TRONXY X6-2E User manual

TRONXY
TRONXY X3A User manual

TRONXY
TRONXY XY-2 PRO User manual

TRONXY
TRONXY XY-3 PRO V2 User manual

TRONXY
TRONXY X3A User manual

TRONXY
TRONXY VEHO600 User manual

TRONXY
TRONXY X5SA-500-2E User manual

TRONXY
TRONXY X1 User manual

TRONXY
TRONXY X5SA-500 User manual

TRONXY
TRONXY Ultrabot User manual

TRONXY
TRONXY P802M User manual

TRONXY
TRONXY X5SA User manual

TRONXY
TRONXY X5S User manual

TRONXY
TRONXY X5SA-400-2E User manual

TRONXY
TRONXY VEHO 600-2E User manual

TRONXY
TRONXY XY-2 PRO User manual

TRONXY
TRONXY X5SA-400-PRO User manual

TRONXY
TRONXY X3A User manual

TRONXY
TRONXY XY-2 User manual