
5.7 Drop-point system ................................................................................................................. 45
5.8 In-cab terminal....................................................................................................................... 46
5.9 Hydraulically driven conveyor belt......................................................................................... 46
5.10 Foldable ladder...................................................................................................................... 47
5.11 Charging sieves..................................................................................................................... 47
5.12 Ascent with platform.............................................................................................................. 48
5.13 Swivelable hopper cover (optional)....................................................................................... 49
5.14 Control block and machine computer.................................................................................... 49
5.15 Argus Twin (optional) ............................................................................................................ 50
6Adjustments............................................................................................... 51
6.1Setting the spread rate.......................................................................................................... 53
6.2 Spread rate control (fertiliser calibration).............................................................................. 53
6.3 Setting the spreading disc speed.......................................................................................... 53
6.4 Setting the working width ...................................................................................................... 54
6.4.1 Replacing the spreading discs.............................................................................................. 54
6.4.2 Setting the feed system......................................................................................................... 55
6.4.3 Checking the working width with the mobile test rig (optional) ............................................. 55
6.5 Boundary, ditch and side spreading...................................................................................... 56
6.5.1 Settings for border spreading................................................................................................ 57
6.5.2 Adapting the settings for boundary spreading ...................................................................... 59
6.5.3 Switch ClickTS ...................................................................................................................... 59
6.6 Switch-on point and switch-off point...................................................................................... 60
7Transportation........................................................................................... 62
8Use of the machine ................................................................................... 63
8.1 Filling the machine ................................................................................................................ 64
8.2 Spreading operation.............................................................................................................. 65
8.3 Notes for spreading slug pellets (e.g. Mesurol) .................................................................... 68
8.4 Complete discharging............................................................................................................ 69
9Faults.......................................................................................................... 70
9.1 Eliminating agitator malfunctions .......................................................................................... 70
9.2 Faults in electronics............................................................................................................... 70
9.3 Faults, causes and remedies ................................................................................................ 71
10 Cleaning, maintenance and repairs......................................................... 72
10.1 Cleaning ................................................................................................................................ 73
10.2 Lubrication point overview..................................................................................................... 74
10.3 Maintenance schedule – overview........................................................................................ 75
10.4 Replacing the spreading vanes............................................................................................. 76
10.5 Belt conveyor with automatic belt control.............................................................................. 77
10.6 Checking the control butterfly valve, outlet openings and agitator ....................................... 78
10.7 Hydraulic system................................................................................................................... 79
10.7.1 Labelling hydraulic hose lines ............................................................................................... 80
10.7.2 Maintenance intervals ........................................................................................................... 81
10.7.3 Inspection criteria for hydraulic hose lines............................................................................ 81
10.7.4 Installation and removal of hydraulic hose lines ................................................................... 82
10.7.5 Mounting hose fittings with O-rings and sleeve nuts............................................................. 82
10.8 Hydraulic fluid filter................................................................................................................ 83
10.9 Conveyor belt gearbox.......................................................................................................... 83
10.10 Oil change angular gearbox.................................................................................................. 84
10.11 Screw tightening torques....................................................................................................... 85
11 Hydraulic diagram..................................................................................... 86