Contents and general safety instructions
IV Festo P.BE-CTEU-DN-OP+MAINT-EN en 1206NH
2.3 Device replacement 2-17.............................................
2.3.1 Replacing the bus node 2-17..................................
2.3.2 Replacing the I-port device – identical device type 2-18.............
2.3.3 Replacing the I-port device – different device type (change) 2-19.....
2.3.4 Replacing the CAPC electrical connection box 2-20.................
3. Preparing for commissioning 3-1.....................................
3.1 Preparing to commissioning a PLC 3-3.................................
3.1.1 General instructions 3-3.....................................
3.1.2 Prerequisites for commissioning 3-4...........................
3.2 Switching on 3-5...................................................
3.2.1 Switching on the power supply 3-5............................
3.2.2 Normal operating status
(fieldbus communication functional test) 3-6....................
3.2.3 DeviceNet participant features (EDS file) 3-10.....................
3.2.4 Downloading and installing an EDS file 3-11......................
3.2.5 Entering participant properties manually 3-12....................
4. Commissioning 4-1................................................
4.1 Commissioning on the DeviceNet - Overview 4-3.........................
4.2 Network configuration and bus node parameterisation 4-5................
4.2.1 Insert the participant in the project/network 4-5.................
4.2.2 Assign the participant to a scanner 4-6.........................
4.2.3 Set the I/O parameters of the participant (Standard EDS) 4-7.......
4.2.4 Assign the I/O addresses of the participant (Standard EDS) 4-9.....
4.2.5 Loading the configuration into the scanner. 4-10...................
4.3 Parameterisation 4-11...............................................
4.3.1 Methods of parameterisation 4-11..............................
4.3.2 Parameterisation with RSNetWorx (with standard EDS) 4-12.........
4.3.3 Device-specific parametrisation 4-15............................
4.3.4 Behaviour of the inputs and outputs in fail state mode 4-15.........
4.3.5 Behaviour of the inputs and outputs in idle state mode 4-16.........
4.3.6 Parameterisation via a user program (explicit messaging) 4-16.......
4.4 Checklist for commissioning 4-19......................................