
Contents and general instructions
III
Festo P.BE-CPVSC-EN en 1206f
Contents
Designated use III........................................................
Areas of application and official certifications IV................................
Target group IV..........................................................
Service IV...............................................................
Notesontheuseofthismanual V...........................................
Important user instructions VI..............................................
Index of terms and abbreviations VIII..........................................
1. Summary of components 1-1........................................
1.1 Overview of the CPV-SC valve terminal 1-4..............................
1.2 Description of variants 1-5...........................................
1.3 Description of components 1-6.......................................
2. Fitting 2-1........................................................
2.1 General instructions on fitting and dismantling 2-4.......................
2.2 Fitting variants 2-4.................................................
2.2.1 H-rail mounting/dismantling 2-5..............................
2.2.2 Wall fitting 2-10.............................................
2.3 Fitting the manual override cover (optional) 2-13.........................
2.4 Fitting the identification plate (optional) 2-15.............................
3. Installation 3-1...................................................
3.1 Preparing the compressed air 3-4.....................................
3.1.1 Operation with non-lubricated compressed air 3-4................
3.1.2 Operation with lubricated compressed air 3-4....................
3.2 General connection methods 3-6......................................
3.2.1 Laying the tubing 3-7........................................
3.3 Connecting CPV-SC valve terminal 3-8.................................
3.3.1 Pilot control (pilot air) 3-8....................................
3.3.2 Pressure zones 3-10.........................................
3.3.3 Vacuum/low-pressure operation 3-13...........................
3.3.4 Connecting the pneumatic tubing 3-14..........................