Contents and general instructions
IV Festo CPX-FB36-EN en 1611a English
2. Preparing for commissioning 2-1.....................................
2.1 EtherNet/IP protocol 2-3............................................
2.1.1 “Multicast” telegram 2-3.....................................
2.1.2 “QuickConnect” 2-5.........................................
2.1.3 “Device Level Ring” protocol (DLR) 2-8.........................
2.2 Modbus® TCP protocol 2-10..........................................
2.3 Notes on commissioning of the CPX-FB36 2-11...........................
2.3.1 Requirements for commissioning 2-11...........................
2.3.2 Switching on the power supply 2-12............................
2.3.3 Normal operating status 2-12..................................
2.4 Participants in the network 2-16.......................................
2.4.1 Participant properties (EDS file) 2-16............................
3. Commissioning 3-1................................................
3.1 Configuration 3-3..................................................
3.1.1 Configuration with EDS file 3-4................................
3.1.2 Configuration with “Generic Ethernet Module” 3-11................
3.1.3 Configuration with CPX-FMT 3-16...............................
3.1.4 Configuration in the “Remote Controller” operating mode 3-20.......
3.1.5 Setting up a “Listen only” connection 3-21.......................
3.2 Parameterisation 3-22...............................................
3.2.1 Parameterisation during switch-on [system start] 3-23..............
3.2.2 Methods of parameterisation 3-25..............................
3.2.3 Parameterisation via configuration data 3-26.....................
3.2.4 Parameterisation with the control device CPX-MMI 3-26............
3.2.5 Parameterisation in the PLC user program 3-26...................
3.2.6 Parameterisation using CPX-FMT and system start with saved parameters
3-27
3.3 Behaviour of the outputs in the “Fail safe mode” or “Idle mode” 3-28.........
3.4 Web server 3-29....................................................
3.5 Checklist for commissioning a CPX terminal 3-30..........................
3.6 Replacing the bus node 3-31..........................................