
Summary of Changes
At MacDon, we’re continuously making improvements, and occasionally these improvements affect product
documentation. The following list provides an account of major changes from the previous version of this document.
Section Summary of Change
Internal Use
Only
3 Unloading the Header from a Container
–Export, page 11
Removed note that said the GSS option is not available for
export. Engineering
4.1.1 Removing Shipping Wire from the
Bottom of the Header –Standard
Headers Only, page 15
Added note that the shipping wire may be tied to the
cutterbar instead of the lower conditioner roll. Removed
step and illustration for removing the light assemblies from
the shipping locations under the header; the light
assemblies are now shipped in the forming shield crate and
can be removed after the crate is pulled out. Revised the
title based on the changes to the procedure.
ECN 62812
4.1.3 Removing Forming Shield Crate –
Standard Headers Only, page 18 Updated the illustration of the metal shipping straps. ECN 62812
4.1.4 Unpacking Hydraulic Hoses and
Electrical Harness, page 19 Changed the shipping position of the M1 adapter harness. ECN 62815
4.1.5 Removing Shipping Stand, page 21
For Grass Seed headers, the two hydraulic fittings are now
shipped in a bag tied to the outside of the manual case
instead of inside the manual case.
UECN 31481
4.2 Installing Hazard/Brake Light
Assembly –Standard Headers Only, page
26
Added steps and illustration for the new shipping location. ECN 62812
—Removed instructions for configuring GSS headers to one
crop stream. This is now done at the factory. Support
5.1.3 Connecting R2 Series Rotary Disc
Header Electrical and Hydraulics –
M1240 Windrower, page 50
Moved hydraulic connection instructions into subtopics for
different header configurations. Publications
Removed references to calibrating the header position
sensors, which aren’t present on R2 headers. Support
Auger/Rotary Disc/Draper-Ready
Configuration –Quick Coupler
Connections, page 52
Corrected reference to the outboard bulkhead fitting,
which was referenced as the inboard fitting.
Audit
#2022-38
9.3 Activating Grass Seed Option, page
104
Corrected step to read “the system is now active”instead
of “the sensor is now active”.Engineering
Added information on how to control drum position, drum
speed, and anti-shatter shield. Support
Changed operating drum speed to 235–660 rpm. Engineering
9.11 Checking Parts in Storage Location,
page 118 Added topic. Support
Predelivery Checklist, page 157
Updated GSS header pre-delivery checks: removed crop
stream configuration check; added drum operation checks
to the run-up procedure.
Support
Added checks for parts in storage location: timing tool and
spindle nut wrench (all headers); two feed plates and four
support angles (GSS-only header).
Support
Removed reference to a GSS sensor. Support
215974 ii Revision A