
6.2.7 Installing the lighting on the seeding
unit 50
6.3 Preparing the implement for
operation 51
6.3.1 Adjusting the working position sensor 51
6.3.2 Folding the lighting 52
6.3.3 Unfolding the implement 52
6.3.4 Adjusting the placement depth on
the TwinTeC coulter 52
6.3.5 Adjusting the placement depth on
the RoTeC coulter 53
6.3.6 Adjusting the coulter pressure
hydraulically 54
6.3.7 Adjusting the coulter pressure
mechanically 55
6.3.8 Adjusting the additional coulter
pressure on the TwinTeC coulter 56
6.3.9 Lifting the coulters hydraulically 56
6.3.10 Lifting the coulters mechanically 57
6.3.11 Adjusting the coulter harrow 57
6.3.12 Adjusting the exact following harrow 60
6.3.13 Adjusting the tramline marker on
the implement frame 66
6.3.14 Removing the road safety bars 70
6.3.15 Starting work with one part-width
section 71
6.3.16 Adjusting the row spacing 71
6.4 Preparing the machine for road
travel 72
6.4.1 Putting on the road safety bars 72
6.4.2 Unfolding the lighting 73
6.4.3 Folding the tramline marker onto
the implement frame 73
6.4.4 Folding the implement 73
6.4.5 Road travel with an Avant seeding
combination 74
6.5 Calculating the permissible
payload 74
7Using the machine 76
7.1 Using the implement 76
7.2 Checking the placement depth 77
7.3 Turning on the headlands 77
8Parking the machine 78
8.1 Parking the TwinTeC coulter 78
8.2 Disconnecting the supply lines
from the hose package 78
8.3 Disconnecting the hydraulic
hose lines 79
8.4 Uncoupling the ISOBUS line 79
8.5 Uncoupling the power supply 80
8.6 Uncoupling the Avant seeding
combination 80
8.7 Parking the Avant seeding unit
separately 81
8.8 Installing the lighting on the soil
tillage implement 86
9Repairing the machine 88
9.1 Maintaining the machine 88
9.1.1 Maintenance schedule 88
9.1.2 Checking the TwinTeC concave disc 89
9.1.3 Checking the TwinTeC concave disc
spacing 89
9.1.4 Checking the TwinTeC depth control
wheel 91
9.1.5 Checking the TwinTeC depth control
wheel scraper 91
9.1.6 Checking the depth control discs
and depth control wheels 92
9.1.7 Checking the cutting discs 94
9.1.8 Checking the RoTeC furrow former 94
9.1.9 Cleaning the segment distributor
head 95
9.1.10 Checking the top link pin and lower
link pin 95
9.1.11 Checking the hydraulic hose lines 96
9.1.12 Cleaning the conveyor section 97
9.2 Lubricating the implement 98
9.2.1 Overview of lubrication points 99
9.3 Eliminating faults 100
MG6545-EN-II | B.1 | 22.07.2021
II