
6.2.1 Removing the lower link mountings 48
6.2.2 Adjusting the lower link mounting to
the mounting category 48
6.2.3 Adjusting the position of the lower
link mountings 49
6.2.4 Installing the lower link mountings 49
6.3 Installing the universal joint shaft
on the implement 50
6.4 Coupling the implement 51
6.4.1 Coupling the 3-point mounting frame 51
6.4.2 Coupling the hydraulic hose lines 51
6.4.3 Coupling the power supply 53
6.4.4 Coupling the universal joint shaft 53
6.5 Preparing the implement for
operation 54
6.5.1 Manual adjustment of the tine
working depth 54
6.5.2 Hydraulic adjustment of the tine
working depth 55
6.5.3 Adjusting the working depth of the
levelling board 56
6.5.4 Adjusting the working depth of the
rigid side guide plates 57
6.5.5 Adjusting the working depth of the
extendable side guide plates 58
6.5.6 Adjusting the scraper to the roller 59
6.5.7 Preparing the track marker for
operation 59
6.5.8 Preparing the wheel mark
eradicator for operation 62
6.5.9 Adjusting the speed of the tines 64
6.5.10 Preparing the coupling parts for
operation 66
6.5.11 Preparing the liftpack system for
operation 68
6.5.12 Preparing the GreenDrill for operation 72
6.5.13 Adjusting the spring tension of the
rigid side guide plates 73
6.5.14 Adjusting the spring tension of the
extendable side guide plates 74
6.5.15 Moving the extendable side guide
plates in working position 75
6.6 Preparing the machine for road
travel 75
6.6.1 Preparing the track markers for
road travel 75
6.6.2 Moving the extendable side guide
plates in transport position 76
6.6.3 Preparing the liftpack system for
road travel 76
6.7 Calculating the permissible
payload 78
7 Using the machine 79
7.1 Using the implement 79
7.2 Checking the set working depth 79
7.3 Using the track marker 80
7.4 Turning on the headlands 80
7.5 Turning on the headlands with
the liftpack system 80
8Parking the machine 81
8.1 Moving the wheel mark
eradicator into parking position 81
8.2 Uncoupling the power supply 82
8.3 Disconnecting the hydraulic
hose lines 82
8.4 Uncoupling the 3-point mounting
frame 83
8.5 Uncoupling the universal joint
shaft 83
8.6 Parking the seed drill 84
8.6.1 Lowering the liftpack system 84
8.6.2 Uncoupling the seed drill 84
9Repairing the machine 86
9.1 Maintaining the machine 86
9.1.1 Maintenance schedule 86
9.1.2 Checking the top link pin and lower
link pin 87
9.1.3 Checking the hydraulic hose lines 87
9.1.4 Checking the tines 88
9.1.5 Replacing the tines 89
9.1.6 Checking the wheel mark eradicator
coulter 90
9.1.7 Checking the oil level in the
interchangeable wheel gear 91
9.1.8 Checking the oil level in the spur
gear trough 91
MG6878-EN-II | D.1 | 18.05.2021
II